Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2023-09-13 — TX
Operator
Palo Duro Teg, Llc
Cause
Material Failure Of Pipe Or Weld
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$175,000
Incident datetime
2023-09-13 00:00 UTC
Report number
Location
TX
Narrative
Operations was notified of a potential leak by a third-party operator that shares a common pipeline corridor. Operations was notified and initiated a field investigation. The potential leak was verified in the field. Operations made internal notifications. A dig was initiated, the pipe was exposed, and the leak was confirmed. Producers midstream utilized stopples to isolate and manage the amount of product lost. Upstream and downstream main line valves were also isolated during the repair to implement double block and bleed. It is our belief that the 295 barrels lost is a worst-case scenario. This value was generated using leak calculations from promax. The actual leak amount is believed to be somewhere between 16 and 295 barrels. We deduced because of the minimal contamination of the soil that was confirmed by a third-party lab analysis. The failed pipe was excavated, and the entire joint was removed. Producers midstream sent the failed pipe to an independent lab for further analysis on an expedite schedule. The new pipe was tested, installed, and the line was purged back into service upon removal of the stopples.
Detailed record list
Report Received Date
2023-09-13 00:00:00
Iyear
2023
Report Number
20230211
Supplemental Number
38653
Report Type
Supplemental Final
Operator Id
38937
Name
Palo Duro Teg, Llc
Operator Street Address
3500 Maple Ave Suite 700
Operator City Name
Dallas
Operator State Abbreviation
TX
Operator Postal Code
75219
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
32.72728
Location Longitude
-97.948379
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid)
Unintentional Release Bbls
295
Intentional Release Bbls
9
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
No
Nrc Rpt Num
1376168
Additional Nrc Report Numbers
1376197
Ignite Ind
No
Upstream Action Taken
Valve Closure
Upstream Valve Type Ind
Remotely Controlled
Downstream Action Taken
Valve Closure
Downstream Valve Type Ind
Remotely Controlled
Num Pub Evacuated
0
Pipe Fac Name
Teg-Wl
Segment Name
Teg-Wl
Onshore State Abbreviation
Tx
Onshore Postal Code
77066
Onshore City Name
Not Within A Municipality
Onshore County Name
Parker
Designated Location
Survey Station No.
Designated Name
1715+29
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
48
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Seam
Pipe Diameter
6.625
Pipe Wall Thickness
0.28
Pipe Smys
52000
Pipe Specification
Api 5lx52
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Tenaris
Pipe Coating Type
Fusion Bonded Epoxy(Fbe)
Coating Applied Ind
No
Installation Year
2013
Manufactured Year
2012
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Other
Leak Type Other
Manufacture Erw Weld Failure
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
5000
Est Cost Gas Released
5280
Est Cost Prop Damage
175000
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
0
Prpty
185280
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
757
Mop Psig
1440
Mop Cfr Section
Subpart E Pressure Test �195.406(A)(3)
Maop Established Date
2013-04-13 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
225
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The leak was so minute scada did not detect.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Field Exam Ind
Yes
Metallurgical Ind
Yes
Failure Type
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Other Factor
Yes
Other Factor Details
Lack Of Fusion On Erw Seam.
Additional Lack Fusion Ind
Yes
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
S***** S****
Preparer Title
Manager Pipeline Facility Compliance
Preparer Email
S*****@p*****************.com
Preparer Telephone
8066637735
Prepared Date
2023-10-11 00:00:00
Local Contact Name
S***** S****
Local Contact Email
S*****@p*****************.com
Local Contact Telephone
8066637735
Authorizer Name
J**** H****
Authorizer Telephone
2142385760
Authorizer Title
Coo
Authorizer Email
J*****@p*****************.com
Narrative
Operations was notified of a potential leak by a third-party operator that shares a common pipeline corridor. Operations was notified and initiated a field investigation. The potential leak was verified in the field. Operations made internal notifications. A dig was initiated, the pipe was exposed, and the leak was confirmed. Producers midstream utilized stopples to isolate and manage the amount of product lost. Upstream and downstream main line valves were also isolated during the repair to implement double block and bleed. It is our belief that the 295 barrels lost is a worst-case scenario. This value was generated using leak calculations from promax. The actual leak amount is believed to be somewhere between 16 and 295 barrels. We deduced because of the minimal contamination of the soil that was confirmed by a third-party lab analysis. The failed pipe was excavated, and the entire joint was removed. Producers midstream sent the failed pipe to an independent lab for further analysis on an expedite schedule. The new pipe was tested, installed, and the line was purged back into service upon removal of the stopples.
Report Received Date | 2023-09-13 00:00:00 |
---|---|
Iyear | 2023 |
Report Number | 20230211 |
Supplemental Number | 38653 |
Report Type | Supplemental Final |
Operator Id | 38937 PHMSA Enforcement |
Name | Palo Duro Teg, Llc |
Operator Street Address | 3500 Maple Ave Suite 700 |
Operator City Name | Dallas |
Operator State Abbreviation | TX |
Operator Postal Code | 75219 |
Time Zone | Central |
Daylight Savings Ind | Yes |
Location Latitude | 32.72728 Google Maps OpenStreetMap |
Location Longitude | -97.948379 Google Maps OpenStreetMap |
Commodity Released Type | Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions |
Commodity Subtype | Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid) |
Unintentional Release Bbls | 295 |
Intentional Release Bbls | 9 |
Recovered Bbls | 0 |
Fatality Ind | No |
Fatal | 0 |
Injury Ind | No |
Injure | 0 |
Accident Identifier | Local Operating Personnel, Including Contractors |
Operator Type | Operator Employee |
System Part Involved | Onshore Pipeline, Including Valve Sites |
On Off Shore | Onshore |
Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
Shutdown Due Accident Ind | Yes |
Communication State Fed Ind | No |
Nrc Rpt Num | 1376168 NRC Report How to search |
Additional Nrc Report Numbers | 1376197 |
Ignite Ind | No |
Upstream Action Taken | Valve Closure |
Upstream Valve Type Ind | Remotely Controlled |
Downstream Action Taken | Valve Closure |
Downstream Valve Type Ind | Remotely Controlled |
Num Pub Evacuated | 0 |
Pipe Fac Name | Teg-Wl |
Segment Name | Teg-Wl |
Onshore State Abbreviation | Tx |
Onshore Postal Code | 77066 |
Onshore City Name | Not Within A Municipality |
Onshore County Name | Parker |
Designated Location | Survey Station No. |
Designated Name | 1715+29 |
Federal | No |
Location Type | Pipeline Right-Of-Way |
Incident Area Type | Underground |
Incident Area Subtype | Under Soil |
Depth Of Cover | 48 |
Crossing | No |
Pipe Facility Type | Intrastate |
Item Involved | Pipe |
Pipe Type | Pipe Seam |
Pipe Diameter | 6.625 |
Pipe Wall Thickness | 0.28 |
Pipe Smys | 52000 |
Pipe Specification | Api 5lx52 |
Pipe Seam Type | Erw - High Frequency |
Pipe Manufacturer | Tenaris |
Pipe Coating Type | Fusion Bonded Epoxy(Fbe) |
Coating Applied Ind | No |
Installation Year | 2013 |
Manufactured Year | 2012 |
Material Involved | Carbon Steel |
Release Type | Leak |
Leak Type | Other |
Leak Type Other | Manufacture Erw Weld Failure |
Wildlife Impact Ind | No |
Soil Contamination | Yes |
Long Term Assessment | No |
Remediation Ind | No |
Water Contam Ind | No |
Could Be Hca | No |
Commodity Reached Hca | No |
Est Cost Oper Paid | 5000 |
Est Cost Gas Released | 5280 |
Est Cost Prop Damage | 175000 |
Est Cost Emergency | 0 |
Est Cost Environmental | 0 |
Est Cost Other | 0 |
Prpty | 185280 |
Num Persons Hosp Not Ovnght | 0 |
Num Injured Treated By Emt | 0 |
Num Resident Building Affctd | 0 |
Num Business Building Affctd | 0 |
Accident Psig | 757 |
Mop Psig | 1440 |
Mop Cfr Section | Subpart E Pressure Test �195.406(A)(3) View CFR 49 §192 |
Maop Established Date | 2013-04-13 00:00:00 |
Maop Reversal Flow Ind | No |
Accident Pressure | Pressure Did Not Exceed Mop |
Pressure Restriction Ind | No |
Length Segment Isolated | 225 |
Internal Inspection Ind | Yes |
Operation Complications Ind | No |
Pipeline Function | > 20% Smys Regulated Transmission |
Scada In Place Ind | Yes |
Scada Operating Ind | Yes |
Scada Functional Ind | Yes |
Scada Detection Ind | No |
Scada Conf Ind | No |
Cpm In Place Ind | Yes |
Cpm Operating Ind | Yes |
Cpm Functional Ind | Yes |
Cpm Detection Ind | No |
Cpm Conf Ind | No |
Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
Investigation Status Details | The leak was so minute scada did not detect. |
Employee Drug Test Ind | No |
Contractor Drug Test Ind | No |
Cause | Material Failure Of Pipe Or Weld |
Cause Details | Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field) |
Field Exam Ind | Yes |
Metallurgical Ind | Yes |
Failure Type | Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field) |
Other Factor | Yes |
Other Factor Details | Lack Of Fusion On Erw Seam. |
Additional Lack Fusion Ind | Yes |
Collected Data Ind | No |
Has Hydrtst Conduc Before Ind | No |
Direct Asmnt Conducted | No |
Non Destructive Exam Ind | No |
Preparer Name | S***** S**** |
Preparer Title | Manager Pipeline Facility Compliance |
Preparer Email | S*****@p*****************.com |
Preparer Telephone | 8066637735 |
Prepared Date | 2023-10-11 00:00:00 |
Local Contact Name | S***** S**** |
Local Contact Email | S*****@p*****************.com |
Local Contact Telephone | 8066637735 |
Authorizer Name | J**** H**** |
Authorizer Telephone | 2142385760 |
Authorizer Title | Coo |
Authorizer Email | J*****@p*****************.com |
Narrative | Operations was notified of a potential leak by a third-party operator that shares a common pipeline corridor. Operations was notified and initiated a field investigation. The potential leak was verified in the field. Operations made internal notifications. A dig was initiated, the pipe was exposed, and the leak was confirmed. Producers midstream utilized stopples to isolate and manage the amount of product lost. Upstream and downstream main line valves were also isolated during the repair to implement double block and bleed. It is our belief that the 295 barrels lost is a worst-case scenario. This value was generated using leak calculations from promax. The actual leak amount is believed to be somewhere between 16 and 295 barrels. We deduced because of the minimal contamination of the soil that was confirmed by a third-party lab analysis. The failed pipe was excavated, and the entire joint was removed. Producers midstream sent the failed pipe to an independent lab for further analysis on an expedite schedule. The new pipe was tested, installed, and the line was purged back into service upon removal of the stopples. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA