Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2023-09-05 — TX
Operator
Oryx Delaware Oil Transport Llc
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$1,400,000
Incident datetime
2023-09-05 00:00 UTC
Report number
Location
TX
Narrative
Approximately 200 barrels of crude oil were released from the southeast gathering 12inch pipeline. The date and time of the release (part a q4) is indicative of the earliest possible time the release could have started based on control center information. A pressure-rated clamp was installed to prevent further release, and a supplemental report will be submitted pending further investigation in the cause of the incident. Supplemental (1): the apparent cause has been updated to internal corrosion based on initial observations in the field. Additionally, a correction was made to part f; there were no employees who failed a drug test. A supplemental report will be submitted pending further investigation into the cause. Supplemental (2): the sub-questions associated with the apparent cause (part g) have been updated to reflect results from the third-party analysis.
Detailed record list
Report Received Date
2023-09-05 00:00:00
Iyear
2023
Report Number
20230207
Supplemental Number
38697
Report Type
Supplemental Final
Operator Id
39654
Name
Oryx Delaware Oil Transport Llc
Operator Street Address
333 Clay St. Suite 1900
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
31.148759
Location Longitude
-102.93303
Commodity Released Type
Crude Oil
Unintentional Release Bbls
200
Recovered Bbls
200
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Or Pack Calculations)
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Nrc Rpt Num
1375405
Additional Nrc Report Numbers
1375610
Ignite Ind
No
Upstream Action Taken
Valve Closure
Upstream Valve Type Ind
Manual
Downstream Action Taken
Valve Closure
Downstream Valve Type Ind
Remotely Controlled
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Southeast 12inch
Segment Name
Southeast 12inch
Onshore State Abbreviation
Tx
Onshore Postal Code
79730
Onshore City Name
Not Within A Municipality
Onshore County Name
Pecos
Designated Location
Milepost
Designated Name
214+31
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
96
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
12
Pipe Wall Thickness
0.25
Pipe Smys
52000
Pipe Specification
Api 5l
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Welspun
Pipe Coating Type
Fusion Bonded Epoxy(Fbe)
Coating Applied Ind
No
Installation Year
2017
Manufactured Year
2017
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
16400
Est Cost Prop Damage
1400000
Est Cost Emergency
285000
Est Cost Environmental
0
Est Cost Other
0
Prpty
1701400
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
250
Mop Psig
740
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
2017-12-03 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
69168
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
Yes
Cpm Conf Ind
Yes
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
No
Num Employees Tested
1
Num Employees Failed
0
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Other Corrosion Ind
Yes
Int Corrosion Type Details
Under-Deposit Corrosion
Int Metallurgical Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
Yes
Corrosion Lining
No
Cleaning Dewatering
Yes
Corrosion Coupons
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Axial Recent Year
2023
Axial Rcnt Propul Method
Free Swimming
Axial Rcnt Attuned Detect
Other
Axial Rcnt Atnd Dtct Dtls
Metal Loss, Girth Weld, And Deformation.
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
N****** A G*******
Preparer Title
Hse Regulatory Compliance Supervisor
Preparer Email
N***************@p*****.com
Preparer Telephone
7136464376
Prepared Date
2023-10-24 00:00:00
Local Contact Name
N****** A G*******
Local Contact Email
N***************@p*****.com
Local Contact Telephone
7136464376
Authorizer Name
N***** G*****
Authorizer Telephone
7136464336
Authorizer Title
Hse Mgr Director
Authorizer Email
N************@p*****.com
Narrative
Approximately 200 barrels of crude oil were released from the southeast gathering 12inch pipeline. The date and time of the release (part a q4) is indicative of the earliest possible time the release could have started based on control center information. A pressure-rated clamp was installed to prevent further release, and a supplemental report will be submitted pending further investigation in the cause of the incident. Supplemental (1): the apparent cause has been updated to internal corrosion based on initial observations in the field. Additionally, a correction was made to part f; there were no employees who failed a drug test. A supplemental report will be submitted pending further investigation into the cause. Supplemental (2): the sub-questions associated with the apparent cause (part g) have been updated to reflect results from the third-party analysis.
Report Received Date | 2023-09-05 00:00:00 |
---|---|
Iyear | 2023 |
Report Number | 20230207 |
Supplemental Number | 38697 |
Report Type | Supplemental Final |
Operator Id | 39654 PHMSA Enforcement |
Name | Oryx Delaware Oil Transport Llc |
Operator Street Address | 333 Clay St. Suite 1900 |
Operator City Name | Houston |
Operator State Abbreviation | TX |
Operator Postal Code | 77002 |
Time Zone | Central |
Daylight Savings Ind | Yes |
Location Latitude | 31.148759 Google Maps OpenStreetMap |
Location Longitude | -102.93303 Google Maps OpenStreetMap |
Commodity Released Type | Crude Oil |
Unintentional Release Bbls | 200 |
Recovered Bbls | 200 |
Fatality Ind | No |
Fatal | 0 |
Injury Ind | No |
Injure | 0 |
Accident Identifier | Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Or Pack Calculations) |
System Part Involved | Onshore Pipeline, Including Valve Sites |
On Off Shore | Onshore |
Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
Shutdown Due Accident Ind | Yes |
Communication State Fed Ind | Yes |
Party Initiated Communication | Operator |
Nrc Rpt Num | 1375405 NRC Report How to search |
Additional Nrc Report Numbers | 1375610 |
Ignite Ind | No |
Upstream Action Taken | Valve Closure |
Upstream Valve Type Ind | Manual |
Downstream Action Taken | Valve Closure |
Downstream Valve Type Ind | Remotely Controlled |
Notify Qualified Indiv Ind | Yes |
Oil Spill Removal Org Ind | No |
Num Pub Evacuated | 0 |
Pipe Fac Name | Southeast 12inch |
Segment Name | Southeast 12inch |
Onshore State Abbreviation | Tx |
Onshore Postal Code | 79730 |
Onshore City Name | Not Within A Municipality |
Onshore County Name | Pecos |
Designated Location | Milepost |
Designated Name | 214+31 |
Federal | No |
Location Type | Pipeline Right-Of-Way |
Incident Area Type | Underground |
Incident Area Subtype | Under Soil |
Depth Of Cover | 96 |
Crossing | No |
Pipe Facility Type | Interstate |
Item Involved | Pipe |
Pipe Type | Pipe Body |
Puddle Weld Ind | No |
Pipe Diameter | 12 |
Pipe Wall Thickness | 0.25 |
Pipe Smys | 52000 |
Pipe Specification | Api 5l |
Pipe Seam Type | Erw - High Frequency |
Pipe Manufacturer | Welspun |
Pipe Coating Type | Fusion Bonded Epoxy(Fbe) |
Coating Applied Ind | No |
Installation Year | 2017 |
Manufactured Year | 2017 |
Material Involved | Carbon Steel |
Release Type | Leak |
Leak Type | Pinhole |
Wildlife Impact Ind | No |
Soil Contamination | Yes |
Long Term Assessment | No |
Remediation Ind | No |
Water Contam Ind | No |
Could Be Hca | No |
Commodity Reached Hca | No |
Est Cost Oper Paid | 0 |
Est Cost Gas Released | 16400 |
Est Cost Prop Damage | 1400000 |
Est Cost Emergency | 285000 |
Est Cost Environmental | 0 |
Est Cost Other | 0 |
Prpty | 1701400 |
Num Persons Hosp Not Ovnght | 0 |
Num Injured Treated By Emt | 0 |
Num Resident Building Affctd | 0 |
Num Business Building Affctd | 0 |
Accident Psig | 250 |
Mop Psig | 740 |
Mop Cfr Section | Component Design Pressure �195.406(A)(2) View CFR 49 §192 |
Maop Established Date | 2017-12-03 00:00:00 |
Maop Reversal Flow Ind | No |
Accident Pressure | Pressure Did Not Exceed Mop |
Pressure Restriction Ind | No |
Length Segment Isolated | 69168 |
Internal Inspection Ind | Yes |
Operation Complications Ind | No |
Pipeline Function | > 20% Smys Regulated Transmission |
Scada In Place Ind | Yes |
Scada Operating Ind | Yes |
Scada Functional Ind | Yes |
Scada Detection Ind | Yes |
Scada Conf Ind | Yes |
Cpm In Place Ind | Yes |
Cpm Operating Ind | Yes |
Cpm Functional Ind | Yes |
Cpm Detection Ind | Yes |
Cpm Conf Ind | Yes |
Investigation Status | Yes, specify investigation result(s): (select all that apply) |
Invest Schedule Ind | Yes |
Invest No Control Room Ind | Yes |
Invest No Controller Ind | Yes |
Employee Drug Test Ind | Yes |
Contractor Drug Test Ind | No |
Num Employees Tested | 1 |
Num Employees Failed | 0 |
Cause | Corrosion Failure |
Cause Details | Internal Corrosion |
Internal External | Internal Corrosion |
Int Visual Exam Results | Localized Pitting |
Int Other Corrosion Ind | Yes |
Int Corrosion Type Details | Under-Deposit Corrosion |
Int Metallurgical Basis Ind | Yes |
Int Low Point Pipe Loc Ind | Yes |
Corrosion Inhibitors | Yes |
Corrosion Lining | No |
Cleaning Dewatering | Yes |
Corrosion Coupons | Yes |
Collected Data Ind | Yes |
Axial Magnetic Flx Lkg Ind | Yes |
Axial Recent Year | 2023 |
Axial Rcnt Propul Method | Free Swimming |
Axial Rcnt Attuned Detect | Other |
Axial Rcnt Atnd Dtct Dtls | Metal Loss, Girth Weld, And Deformation. |
Has Hydrtst Conduc Before Ind | No |
Direct Asmnt Conducted | No |
Non Destructive Exam Ind | No |
Preparer Name | N****** A G******* |
Preparer Title | Hse Regulatory Compliance Supervisor |
Preparer Email | N***************@p*****.com |
Preparer Telephone | 7136464376 |
Prepared Date | 2023-10-24 00:00:00 |
Local Contact Name | N****** A G******* |
Local Contact Email | N***************@p*****.com |
Local Contact Telephone | 7136464376 |
Authorizer Name | N***** G***** |
Authorizer Telephone | 7136464336 |
Authorizer Title | Hse Mgr Director |
Authorizer Email | N************@p*****.com |
Narrative | Approximately 200 barrels of crude oil were released from the southeast gathering 12inch pipeline. The date and time of the release (part a q4) is indicative of the earliest possible time the release could have started based on control center information. A pressure-rated clamp was installed to prevent further release, and a supplemental report will be submitted pending further investigation in the cause of the incident. Supplemental (1): the apparent cause has been updated to internal corrosion based on initial observations in the field. Additionally, a correction was made to part f; there were no employees who failed a drug test. A supplemental report will be submitted pending further investigation into the cause. Supplemental (2): the sub-questions associated with the apparent cause (part g) have been updated to reflect results from the third-party analysis. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA