HL incident on 2023-09-01 — TX

Operator
Navigator Panhandle Holdco Llc
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$30,000
Incident datetime
2023-09-01 00:00 UTC
Report number
Location
TX
Narrative
Ili assessment completed july 2023, and preliminary reports were provided on 8/18. Validation digs to verify reports of metal loss were scheduled for 8/24. During excavation, the inspector identified some contaminated soil as well as an abandoned foreign line. The operator of the foreign line removed test leads from pipeline near our pipeline segment causing interference with the cathodic protection on line.
Detailed record list
Report Received Date
2023-09-01 00:00:00
Iyear
2023
Report Number
20230205
Supplemental Number
38611
Report Type
Supplemental Final
Operator Id
Name
Navigator Panhandle Holdco Llc
Operator Street Address
2807 Allen Street #833
Operator City Name
Dallas
Operator State Abbreviation
TX
Operator Postal Code
75204
Time Zone
Central
Daylight Savings Ind
No
Location Latitude
Location Longitude
-98.91151904
Commodity Released Type
Crude Oil
Unintentional Release Bbls
25
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
Yes
Party Initiated Communication
Local/state/federal Emergency Responder
Nrc Rpt Num
Additional Nrc Report Numbers
1377388
Ignite Ind
No
Upstream Action Taken
Valve Closure
Upstream Valve Type Ind
Remotely Controlled
Downstream Action Taken
Valve Closure
Downstream Valve Type Ind
Manual
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Ruby To Arnett 12" Pl
Segment Name
Ruby To Arnett 12" Pl
Onshore State Abbreviation
Ok
Onshore Postal Code
73663
Onshore City Name
Seiling
Onshore County Name
Ellis
Designated Location
Milepost
Designated Name
Trojan Statio
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
5
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
12.75
Pipe Wall Thickness
0.25
Pipe Smys
52000
Pipe Specification
X56
Pipe Seam Type
Erw � Unknown Frequency
Pipe Manufacturer
Bredero Shaw
Pipe Coating Type
Fusion Bonded Epoxy(Fbe)
Coating Applied Ind
Yes
Installation Year
2014
Manufactured Year
2013
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
15000
Est Cost Gas Released
2500
Est Cost Prop Damage
30000
Est Cost Emergency
15000
Est Cost Environmental
50000
Est Cost Other
0
Prpty
112500
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
700
Mop Psig
1480
Mop Cfr Section
Internal Design Pressure �195.406(A)(1)
Maop Established Date
2014-08-24 00:00:00
Maop Reversal Flow Ind
Bi-Directional
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
93255
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Release was due to metal loss detected during ili assessment run in july 2023. Preliminary reports provided metal loss % however needed to confirm with validation dig. During dig, we determined a foreign line and that release was related to pipeline's metal loss.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
External Corrosion
Internal External
External Corrosion
Visual Exam Results
Localized Pitting
Galvanic Corrosion Ind
Yes
Metallurgical Basis Ind
Yes
Underground Location
Yes
Under Cathodic Protection Ind
Yes
Cathodic Pro Start Year
2015
Shielding Evident
Yes
Cathodic Survey Type
Yes
Cp Annual Survey Ind
Yes
Cp Annual Survey Year
2022
Prior Damage
Yes
Collected Data Ind
Yes
Cir Trn Wave Mgn Flx Lkg Ind
Yes
Circ Wave Recent Year
2023
Circ Wv Rcnt Propul Method
Free Swimming
Circ Wv Rcnt Resolution
High Resolution
Circ Wv Previous Year
2019
Circ Wv Prev Propul Method
Free Swimming
Circ Wv Prev Resolution
High Resolution
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
Yes, And An Investigative Dig Was Cunducted At The Point Of The Accident
Direct Asmnt At Pnt Accdnt Yr
2023
Asmnt Other Rcnt Ind
Yes
Asmnt Other Type
Mfl Tool Run
Asmnt Other Rcnt Year
2023
Non Destructive Exam Ind
Yes
Exm Other Type
Hydrotest
Exm Other Rcnt Year
2014
Exm Other Rcnt Ind
Yes
Preparer Name
V****** R*****
Preparer Title
Ehs Regulatory Manager
Preparer Email
V******@n***********.com
Preparer Telephone
4327700179
Prepared Date
2023-10-02 00:00:00
Authorizer Name
V****** R*****
Authorizer Telephone
4327700179
Authorizer Title
Ehs Regulatory Manager
Authorizer Email
V******@n***********.com
Narrative
Ili assessment completed july 2023, and preliminary reports were provided on 8/18. Validation digs to verify reports of metal loss were scheduled for 8/24. During excavation, the inspector identified some contaminated soil as well as an abandoned foreign line. The operator of the foreign line removed test leads from pipeline near our pipeline segment causing interference with the cathodic protection on line.
Report Received Date 2023-09-01 00:00:00
Iyear 2023
Report Number 20230205
Supplemental Number 38611
Report Type Supplemental Final
Operator Id 40329 PHMSA Enforcement
Name Navigator Panhandle Holdco Llc
Operator Street Address 2807 Allen Street #833
Operator City Name Dallas
Operator State Abbreviation TX
Operator Postal Code 75204
Time Zone Central
Daylight Savings Ind No
Location Latitude 36.34202381 Google Maps OpenStreetMap
Location Longitude -98.91151904 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 25
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Contractor Working For The Operator
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind Yes
Communication State Fed Ind Yes
Party Initiated Communication Local/state/federal Emergency Responder
Nrc Rpt Num 1377223 NRC Report How to search
Additional Nrc Report Numbers 1377388
Ignite Ind No
Upstream Action Taken Valve Closure
Upstream Valve Type Ind Remotely Controlled
Downstream Action Taken Valve Closure
Downstream Valve Type Ind Manual
Notify Qualified Indiv Ind Yes
Oil Spill Removal Org Ind No
Num Pub Evacuated 0
Pipe Fac Name Ruby To Arnett 12" Pl
Segment Name Ruby To Arnett 12" Pl
Onshore State Abbreviation Ok
Onshore Postal Code 73663
Onshore City Name Seiling
Onshore County Name Ellis
Designated Location Milepost
Designated Name Trojan Statio
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 5
Crossing No
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Body
Puddle Weld Ind No
Pipe Diameter 12.75
Pipe Wall Thickness 0.25
Pipe Smys 52000
Pipe Specification X56
Pipe Seam Type Erw � Unknown Frequency
Pipe Manufacturer Bredero Shaw
Pipe Coating Type Fusion Bonded Epoxy(Fbe)
Coating Applied Ind Yes
Installation Year 2014
Manufactured Year 2013
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 15000
Est Cost Gas Released 2500
Est Cost Prop Damage 30000
Est Cost Emergency 15000
Est Cost Environmental 50000
Est Cost Other 0
Prpty 112500
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 700
Mop Psig 1480
Mop Cfr Section Internal Design Pressure �195.406(A)(1) View CFR 49 §192
Maop Established Date 2014-08-24 00:00:00
Maop Reversal Flow Ind Bi-Directional
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 93255
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Release was due to metal loss detected during ili assessment run in july 2023. Preliminary reports provided metal loss % however needed to confirm with validation dig. During dig, we determined a foreign line and that release was related to pipeline's metal loss.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details External Corrosion
Internal External External Corrosion
Visual Exam Results Localized Pitting
Galvanic Corrosion Ind Yes
Metallurgical Basis Ind Yes
Underground Location Yes
Under Cathodic Protection Ind Yes
Cathodic Pro Start Year 2015
Shielding Evident Yes
Cathodic Survey Type Yes
Cp Annual Survey Ind Yes
Cp Annual Survey Year 2022
Prior Damage Yes
Collected Data Ind Yes
Cir Trn Wave Mgn Flx Lkg Ind Yes
Circ Wave Recent Year 2023
Circ Wv Rcnt Propul Method Free Swimming
Circ Wv Rcnt Resolution High Resolution
Circ Wv Previous Year 2019
Circ Wv Prev Propul Method Free Swimming
Circ Wv Prev Resolution High Resolution
Has Hydrtst Conduc Before Ind No
Direct Asmnt Conducted Yes, And An Investigative Dig Was Cunducted At The Point Of The Accident
Direct Asmnt At Pnt Accdnt Yr 2023
Asmnt Other Rcnt Ind Yes
Asmnt Other Type Mfl Tool Run
Asmnt Other Rcnt Year 2023
Non Destructive Exam Ind Yes
Exm Other Type Hydrotest
Exm Other Rcnt Year 2014
Exm Other Rcnt Ind Yes
Preparer Name V****** R*****
Preparer Title Ehs Regulatory Manager
Preparer Email V******@n***********.com
Preparer Telephone 4327700179
Prepared Date 2023-10-02 00:00:00
Authorizer Name V****** R*****
Authorizer Telephone 4327700179
Authorizer Title Ehs Regulatory Manager
Authorizer Email V******@n***********.com
Narrative Ili assessment completed july 2023, and preliminary reports were provided on 8/18. Validation digs to verify reports of metal loss were scheduled for 8/24. During excavation, the inspector identified some contaminated soil as well as an abandoned foreign line. The operator of the foreign line removed test leads from pipeline near our pipeline segment causing interference with the cathodic protection on line.

All rights reserved. Copyright © by ClearPHMSA