HL incident on 2023-08-10 — TX
Operator
Hfotco Llc
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$175,000
Incident datetime
2023-08-10 00:00 UTC
Report number
Location
TX
Narrative
On 7/13/23 at approximately 15:00, a mechanical tech identified product release at the big speed junction station on the 24" houston terminal pipeline. The line was already down per schedule. Mechanical tech isolated the valves on both sides of the line segment where the release occurred. Contractors and company support personnel were dispatched to excavate and locate the source of the release. Release was later identified on a station dead leg section of piping, approximately 6 ft. Underground, between big speed and little speed junctions. A clamp was installed on the line to isolate the release. Approximately, 20 barrels of crude oil was released. Product was cleaned up and contaminated soil removed. The cause of the accident is under investigation. Supplemental report: the failed section of pipe was cut out and replaced. 3rd party physical analysis determined cause to be internal corrosion due to microbial induced corrosion. Line segment has been treated with inhibitor and biocide for approximately one year. Internal treatment program will be adjusted as needed based on findings of the analysis of this failure.
Detailed record list
Report Received Date
2023-08-10 00:00:00
Iyear
2023
Report Number
20230184
Supplemental Number
38970
Report Type
Supplemental Final
Operator Id
31863
Name
Hfotco Llc
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
29.70773894
Location Longitude
-95.22354312
Commodity Released Type
Crude Oil
Unintentional Release Bbls
20
Recovered Bbls
16
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Routine Shutdown
Communication State Fed Ind
No
Nrc Rpt Num
1373031
Additional Nrc Report Numbers
1373187
Ignite Ind
No
Upstream Action Taken
Valve Closure
Upstream Valve Type Ind
Remotely Controlled
Downstream Action Taken
Valve Closure
Downstream Valve Type Ind
Remotely Controlled
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
Yes
Osro Arrived On Site Dt
7/14/2023 9:45
Num Pub Evacuated
0
Pipe Fac Name
Houston Terminal Pipeline
Segment Name
21073 Hfotco To Lyondale 24-Inch
Onshore State Abbreviation
Tx
Onshore Postal Code
77506
Onshore City Name
Pasadena
Onshore County Name
Harris
Designated Location
Survey Station No.
Designated Name
0+00
Federal
No
Location Type
Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
72
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
24
Pipe Wall Thickness
0.312
Pipe Smys
52000
Pipe Specification
Api 5l X-52
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Unknown
Pipe Coating Type
Fusion Bonded Epoxy(Fbe)
Coating Applied Ind
Unknown
Installation Year
1995
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
11500
Est Cost Gas Released
1500
Est Cost Prop Damage
175000
Est Cost Emergency
273000
Est Cost Environmental
201000
Est Cost Other
0
Prpty
662000
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
0
Mop Psig
1440
Mop Cfr Section
Subpart E Pressure Test �195.406(A)(3)
Maop Established Date
1995-11-08 00:00:00
Maop Reversal Flow Ind
Bi-Directional
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
810
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
A review of the accident determined that there were no control room actions that contributed to the event.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Water Acid Ind
Yes
Int Microbiological Ind
Yes
Int Other Basis Ind
Yes
Int Corrosion Basis Details
Visual Laboratory Analysis Of Pit Morphology.
Int Dead Leg Loc Ind
Yes
Corrosion Inhibitors
No
Corrosion Lining
No
Cleaning Dewatering
No
Corrosion Coupons
No
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Geometry Deformation Ind
Yes
Axial Recent Year
2020
Axial Rcnt Propul Method
Free Swimming
Axial Rcnt Attuned Detect
Metal Loss
Axial Rcnt Atnd Dtct Metal
High Resolution
Axial Previous Year
2015
Axial Prev Propul Method
Free Swimming
Axial Prev Attuned Detect
Metal Loss
Axial Prev Atnd Dtct Metal
High Resolution
Geometry Recent Year
2020
Geometry Rcnt Propul Method
Free Swimming
Geometry Rcnt Resolution
High Resolution
Geometrt Rcnt Measur Cups
Inside Ili Cups
Geometry Previous Year
2015
Geometry Prev Propul Method
Free Swimming
Geometry Prev Resolution
High Resolution
Geometrt Prev Measur Cups
Inside Ili Cups
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
T*** N*******
Preparer Title
Director - Dot Compliance
Preparer Email
T************@e*************.com
Preparer Telephone
713-989-7126
Prepared Date
2023-12-15 00:00:00
Authorizer Name
T*** N*******
Authorizer Telephone
713-989-7126
Authorizer Title
Director - Dot Compliance
Authorizer Email
T************@e*************.com
Narrative
On 7/13/23 at approximately 15:00, a mechanical tech identified product release at the big speed junction station on the 24" houston terminal pipeline. The line was already down per schedule. Mechanical tech isolated the valves on both sides of the line segment where the release occurred. Contractors and company support personnel were dispatched to excavate and locate the source of the release. Release was later identified on a station dead leg section of piping, approximately 6 ft. Underground, between big speed and little speed junctions. A clamp was installed on the line to isolate the release. Approximately, 20 barrels of crude oil was released. Product was cleaned up and contaminated soil removed. The cause of the accident is under investigation. Supplemental report: the failed section of pipe was cut out and replaced. 3rd party physical analysis determined cause to be internal corrosion due to microbial induced corrosion. Line segment has been treated with inhibitor and biocide for approximately one year. Internal treatment program will be adjusted as needed based on findings of the analysis of this failure.
Report Received Date | 2023-08-10 00:00:00 |
---|---|
Iyear | 2023 |
Report Number | 20230184 |
Supplemental Number | 38970 |
Report Type | Supplemental Final |
Operator Id | 31863 PHMSA Enforcement |
Name | Hfotco Llc |
Operator Street Address | 1300 Main Street |
Operator City Name | Houston |
Operator State Abbreviation | TX |
Operator Postal Code | 77002 |
Time Zone | Central |
Daylight Savings Ind | Yes |
Location Latitude | 29.70773894 Google Maps OpenStreetMap |
Location Longitude | -95.22354312 Google Maps OpenStreetMap |
Commodity Released Type | Crude Oil |
Unintentional Release Bbls | 20 |
Recovered Bbls | 16 |
Fatality Ind | No |
Fatal | 0 |
Injury Ind | No |
Injure | 0 |
Accident Identifier | Local Operating Personnel, Including Contractors |
Operator Type | Operator Employee |
System Part Involved | Onshore Pipeline, Including Valve Sites |
On Off Shore | Onshore |
Status When Identified | Routine Shutdown |
Communication State Fed Ind | No |
Nrc Rpt Num | 1373031 NRC Report How to search |
Additional Nrc Report Numbers | 1373187 |
Ignite Ind | No |
Upstream Action Taken | Valve Closure |
Upstream Valve Type Ind | Remotely Controlled |
Downstream Action Taken | Valve Closure |
Downstream Valve Type Ind | Remotely Controlled |
Notify Qualified Indiv Ind | Yes |
Oil Spill Removal Org Ind | Yes |
Osro Arrived On Site Dt | 7/14/2023 9:45 |
Num Pub Evacuated | 0 |
Pipe Fac Name | Houston Terminal Pipeline |
Segment Name | 21073 Hfotco To Lyondale 24-Inch |
Onshore State Abbreviation | Tx |
Onshore Postal Code | 77506 |
Onshore City Name | Pasadena |
Onshore County Name | Harris |
Designated Location | Survey Station No. |
Designated Name | 0+00 |
Federal | No |
Location Type | Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property |
Incident Area Type | Underground |
Incident Area Subtype | Under Soil |
Depth Of Cover | 72 |
Crossing | No |
Pipe Facility Type | Intrastate |
Item Involved | Pipe |
Pipe Type | Pipe Body |
Puddle Weld Ind | No |
Pipe Diameter | 24 |
Pipe Wall Thickness | 0.312 |
Pipe Smys | 52000 |
Pipe Specification | Api 5l X-52 |
Pipe Seam Type | Erw - High Frequency |
Pipe Manufacturer | Unknown |
Pipe Coating Type | Fusion Bonded Epoxy(Fbe) |
Coating Applied Ind | Unknown |
Installation Year | 1995 |
Manufactured Year | Unknown |
Material Involved | Carbon Steel |
Release Type | Leak |
Leak Type | Pinhole |
Wildlife Impact Ind | No |
Soil Contamination | Yes |
Long Term Assessment | No |
Remediation Ind | Yes |
Soil Remed Ind | Yes |
Water Contam Ind | No |
Could Be Hca | Yes |
Commodity Reached Hca | Yes |
High Pop Ind | Yes |
High Pop Yes No | Yes |
Est Cost Oper Paid | 11500 |
Est Cost Gas Released | 1500 |
Est Cost Prop Damage | 175000 |
Est Cost Emergency | 273000 |
Est Cost Environmental | 201000 |
Est Cost Other | 0 |
Prpty | 662000 |
Num Persons Hosp Not Ovnght | 0 |
Num Injured Treated By Emt | 0 |
Num Resident Building Affctd | 0 |
Num Business Building Affctd | 0 |
Accident Psig | 0 |
Mop Psig | 1440 |
Mop Cfr Section | Subpart E Pressure Test �195.406(A)(3) View CFR 49 §192 |
Maop Established Date | 1995-11-08 00:00:00 |
Maop Reversal Flow Ind | Bi-Directional |
Accident Pressure | Pressure Did Not Exceed Mop |
Pressure Restriction Ind | No |
Length Segment Isolated | 810 |
Internal Inspection Ind | Yes |
Operation Complications Ind | No |
Pipeline Function | > 20% Smys Regulated Transmission |
Scada In Place Ind | Yes |
Scada Operating Ind | Yes |
Scada Functional Ind | Yes |
Scada Detection Ind | No |
Scada Conf Ind | No |
Cpm In Place Ind | Yes |
Cpm Operating Ind | Yes |
Cpm Functional Ind | Yes |
Cpm Detection Ind | No |
Cpm Conf Ind | No |
Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
Investigation Status Details | A review of the accident determined that there were no control room actions that contributed to the event. |
Employee Drug Test Ind | No |
Contractor Drug Test Ind | No |
Cause | Corrosion Failure |
Cause Details | Internal Corrosion |
Internal External | Internal Corrosion |
Int Visual Exam Results | Localized Pitting |
Int Water Acid Ind | Yes |
Int Microbiological Ind | Yes |
Int Other Basis Ind | Yes |
Int Corrosion Basis Details | Visual Laboratory Analysis Of Pit Morphology. |
Int Dead Leg Loc Ind | Yes |
Corrosion Inhibitors | No |
Corrosion Lining | No |
Cleaning Dewatering | No |
Corrosion Coupons | No |
Collected Data Ind | Yes |
Axial Magnetic Flx Lkg Ind | Yes |
Geometry Deformation Ind | Yes |
Axial Recent Year | 2020 |
Axial Rcnt Propul Method | Free Swimming |
Axial Rcnt Attuned Detect | Metal Loss |
Axial Rcnt Atnd Dtct Metal | High Resolution |
Axial Previous Year | 2015 |
Axial Prev Propul Method | Free Swimming |
Axial Prev Attuned Detect | Metal Loss |
Axial Prev Atnd Dtct Metal | High Resolution |
Geometry Recent Year | 2020 |
Geometry Rcnt Propul Method | Free Swimming |
Geometry Rcnt Resolution | High Resolution |
Geometrt Rcnt Measur Cups | Inside Ili Cups |
Geometry Previous Year | 2015 |
Geometry Prev Propul Method | Free Swimming |
Geometry Prev Resolution | High Resolution |
Geometrt Prev Measur Cups | Inside Ili Cups |
Has Hydrtst Conduc Before Ind | No |
Direct Asmnt Conducted | No |
Non Destructive Exam Ind | No |
Preparer Name | T*** N******* |
Preparer Title | Director - Dot Compliance |
Preparer Email | T************@e*************.com |
Preparer Telephone | 713-989-7126 |
Prepared Date | 2023-12-15 00:00:00 |
Authorizer Name | T*** N******* |
Authorizer Telephone | 713-989-7126 |
Authorizer Title | Director - Dot Compliance |
Authorizer Email | T************@e*************.com |
Narrative | On 7/13/23 at approximately 15:00, a mechanical tech identified product release at the big speed junction station on the 24" houston terminal pipeline. The line was already down per schedule. Mechanical tech isolated the valves on both sides of the line segment where the release occurred. Contractors and company support personnel were dispatched to excavate and locate the source of the release. Release was later identified on a station dead leg section of piping, approximately 6 ft. Underground, between big speed and little speed junctions. A clamp was installed on the line to isolate the release. Approximately, 20 barrels of crude oil was released. Product was cleaned up and contaminated soil removed. The cause of the accident is under investigation. Supplemental report: the failed section of pipe was cut out and replaced. 3rd party physical analysis determined cause to be internal corrosion due to microbial induced corrosion. Line segment has been treated with inhibitor and biocide for approximately one year. Internal treatment program will be adjusted as needed based on findings of the analysis of this failure. |