HL incident on 2023-08-10 — LA

Operator
Imtt-Bayonne
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$10,000
Incident datetime
2023-08-10 00:00 UTC
Report number
Location
LA
Narrative
At approximately 0730 on 7/29/23 imtt-bayonne field operators were setting a transfer from tk 8564 to 8571, while checking the other tanks in the yard shut an operator noticed the piping/nipple to the prv on tk 8560 leaking. They immediately called the imtt bayonne supervisors who responded to the scene. When the supervisor arrived on scene the operator was in the process of shutting the valve to the prv piping to stop the leak. We notified auchter industrial to come in and start remediating the area. The imtt-bayonne maintenance department was called to the site to change the prv piping. When maintenance removed the piping they noticed a slight fracture along the pipe threads, causing the leak to occur. Approximately 40 bbls were released, approximately 25bbls were recovered via vacuum truck. All released gasoline was contained inside the imtt bayonne facility. Imtt-bayonne will complete an environmental remediation investigation and act appropriately when the investigation is complete. Nipple was originally schedule 80 replacement nipple installed is schedule 160
Detailed record list
Report Received Date
2023-08-10 00:00:00
Iyear
2023
Report Number
20230183
Supplemental Number
38374
Report Type
Original Final
Operator Id
Name
Imtt-Bayonne
Operator Street Address
400 Poydras Street Suite 3000
Operator City Name
New Orleans
Operator State Abbreviation
LA
Operator Postal Code
70130
Time Zone
Eastern
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
40
Recovered Bbls
25
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
No
Shutdown Explain
Segment Was In Service, But Was Not Currently In Use.
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Nrc Rpt Num
Additional Nrc Report Numbers
1374734
Ignite Ind
No
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Imtt-Bayonne Yard 8
Segment Name
Yd 8 Segment 36
Onshore State Abbreviation
Nj
Onshore Postal Code
07002
Onshore City Name
Bayonne
Onshore County Name
Hudson
Designated Location
Survey Station No.
Designated Name
Yd8seg36br C
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Relief Line And Relief Equipment
Installation Year
2009
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Crack
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
Yes
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
5000
Est Cost Prop Damage
10000
Est Cost Emergency
3500
Est Cost Environmental
150000
Est Cost Other
0
Prpty
168500
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
125
Mop Psig
175
Mop Cfr Section
Subpart E Pressure Test �195.406(A)(3)
Maop Established Date
2016-06-03 00:00:00
Maop Reversal Flow Ind
Bi-Directional
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
< 20% Smys Regulated Transmission
Scada In Place Ind
No
Cpm In Place Ind
No
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Threaded Connection/coupling Failure
Eq Failure Type
Threaded Connection/coupling Failure
Other Stripped Ind
Pipe Nipple
Additional Vibration Ind
Yes
Preparer Name
R***** M**********
Preparer Title
Imtt Pipeline Manager
Preparer Email
R****************@i***.com
Preparer Telephone
2014372200
Prepared Date
2023-08-02 00:00:00
Local Contact Name
R***** M**********
Local Contact Email
R****************@i***.com
Local Contact Telephone
2014372200
Authorizer Name
R****** A*******
Authorizer Telephone
2014372200
Authorizer Title
Director Of Operations
Authorizer Email
R***********@i***.com
Narrative
At approximately 0730 on 7/29/23 imtt-bayonne field operators were setting a transfer from tk 8564 to 8571, while checking the other tanks in the yard shut an operator noticed the piping/nipple to the prv on tk 8560 leaking. They immediately called the imtt bayonne supervisors who responded to the scene. When the supervisor arrived on scene the operator was in the process of shutting the valve to the prv piping to stop the leak. We notified auchter industrial to come in and start remediating the area. The imtt-bayonne maintenance department was called to the site to change the prv piping. When maintenance removed the piping they noticed a slight fracture along the pipe threads, causing the leak to occur. Approximately 40 bbls were released, approximately 25bbls were recovered via vacuum truck. All released gasoline was contained inside the imtt bayonne facility. Imtt-bayonne will complete an environmental remediation investigation and act appropriately when the investigation is complete. Nipple was originally schedule 80 replacement nipple installed is schedule 160
Report Received Date 2023-08-10 00:00:00
Iyear 2023
Report Number 20230183
Supplemental Number 38374
Report Type Original Final
Operator Id 39149 PHMSA Enforcement
Name Imtt-Bayonne
Operator Street Address 400 Poydras Street Suite 3000
Operator City Name New Orleans
Operator State Abbreviation LA
Operator Postal Code 70130
Time Zone Eastern
Daylight Savings Ind Yes
Location Latitude 40.656517 Google Maps OpenStreetMap
Location Longitude -74.093464 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Gasoline (Non-Ethanol)
Unintentional Release Bbls 40
Recovered Bbls 25
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
System Part Involved Onshore Terminal/tank Farm Equipment And Piping
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind No
Shutdown Explain Segment Was In Service, But Was Not Currently In Use.
Communication State Fed Ind Yes
Party Initiated Communication Operator
Nrc Rpt Num 1374569 NRC Report How to search
Additional Nrc Report Numbers 1374734
Ignite Ind No
Notify Qualified Indiv Ind Yes
Oil Spill Removal Org Ind No
Num Pub Evacuated 0
Pipe Fac Name Imtt-Bayonne Yard 8
Segment Name Yd 8 Segment 36
Onshore State Abbreviation Nj
Onshore Postal Code 07002
Onshore City Name Bayonne
Onshore County Name Hudson
Designated Location Survey Station No.
Designated Name Yd8seg36br C
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Interstate
Item Involved Relief Line And Relief Equipment
Installation Year 2009
Manufactured Year Unknown
Material Involved Carbon Steel
Release Type Leak
Leak Type Crack
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment Yes
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 5000
Est Cost Prop Damage 10000
Est Cost Emergency 3500
Est Cost Environmental 150000
Est Cost Other 0
Prpty 168500
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 125
Mop Psig 175
Mop Cfr Section Subpart E Pressure Test �195.406(A)(3) View CFR 49 §192
Maop Established Date 2016-06-03 00:00:00
Maop Reversal Flow Ind Bi-Directional
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function < 20% Smys Regulated Transmission
Scada In Place Ind No
Cpm In Place Ind No
Investigation Status No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Threaded Connection/coupling Failure
Eq Failure Type Threaded Connection/coupling Failure
Other Stripped Ind Pipe Nipple
Additional Vibration Ind Yes
Preparer Name R***** M**********
Preparer Title Imtt Pipeline Manager
Preparer Email R****************@i***.com
Preparer Telephone 2014372200
Prepared Date 2023-08-02 00:00:00
Local Contact Name R***** M**********
Local Contact Email R****************@i***.com
Local Contact Telephone 2014372200
Authorizer Name R****** A*******
Authorizer Telephone 2014372200
Authorizer Title Director Of Operations
Authorizer Email R***********@i***.com
Narrative At approximately 0730 on 7/29/23 imtt-bayonne field operators were setting a transfer from tk 8564 to 8571, while checking the other tanks in the yard shut an operator noticed the piping/nipple to the prv on tk 8560 leaking. They immediately called the imtt bayonne supervisors who responded to the scene. When the supervisor arrived on scene the operator was in the process of shutting the valve to the prv piping to stop the leak. We notified auchter industrial to come in and start remediating the area. The imtt-bayonne maintenance department was called to the site to change the prv piping. When maintenance removed the piping they noticed a slight fracture along the pipe threads, causing the leak to occur. Approximately 40 bbls were released, approximately 25bbls were recovered via vacuum truck. All released gasoline was contained inside the imtt bayonne facility. Imtt-bayonne will complete an environmental remediation investigation and act appropriately when the investigation is complete. Nipple was originally schedule 80 replacement nipple installed is schedule 160