HL incident on 2023-07-28 — GA

Operator
Colonial Pipeline Co
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$3,500
Incident datetime
2023-07-28 00:00 UTC
Report number
Location
GA
Narrative
On 7/10/23, an employee at allentown station was conducting a station check. While walking through the yard the employee identified product at approximately 09:30 am near unit 3's suction and discharge valves. It was determined at 10:35 am the product discovered was an active release. The unit 3 discharge valve was found to be weeping through 3 bolts on the bonnet. The osro was already at the station performing alternative work at the time the release was discovered. Nrc was notified once it was determined the $50k threshold was going to be exceeded. Subsequent analysis determined that the release started on 6/30/23 the cause of the failure is under investigation. Update 9/20/23 - an investigation determined the release was coming from three bolts on the unit 3 discharge valve bonnet as per visual confirmation of the same. The bonnet was separated to investigate and repair and reassemble with a new o-ring. The removed o-ring was examined and found to be in a good condition without visual damage or defects and without evidence of being pinched or displaced from the sealing groove in the installation. The bonnet and valve body sealing surfaces were inspected and confirmed to have adequate surface quality for desired seal performance. As a preemptive measure, the sealing surfaces were cleaned again before repair. The same bolting procedure was followed to the same torque values. A specific failure mode could not be identified as the o-ring and sealing surfaces were in good condition and the recommended assembly and torque methods were followed.
Detailed record list
Report Received Date
2023-07-28 00:00:00
Iyear
2023
Report Number
20230173
Supplemental Number
38579
Report Type
Supplemental Final
Operator Id
Name
Colonial Pipeline Co
Operator Street Address
1000 Lake St.
Operator City Name
Alpharetta
Operator State Abbreviation
GA
Operator Postal Code
30009
Time Zone
Eastern
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
-74.65859531
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
0.82
Recovered Bbls
0.82
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Nrc Rpt Num
Additional Nrc Report Numbers
1372745
Ignite Ind
No
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
Yes
Osro Arrived On Site Dt
7/10/2023 10:35
Num Pub Evacuated
0
Pipe Fac Name
Colonial Pipeline Company/allentown Station
Segment Name
Line 03
Onshore State Abbreviation
Nj
Onshore Postal Code
08505
Onshore City Name
Bordentown
Onshore County Name
Burlington
Designated Location
Milepost
Designated Name
446.5
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
24
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Valve
Valve Type
Mainline
Valve Mainline Type
Gate
Valve Manufacturer
Wkm
Installation Year
1963
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Usa Drinking Ind
Yes
Usa Drinking Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
210
Est Cost Prop Damage
3500
Est Cost Emergency
99000
Est Cost Environmental
16000
Est Cost Other
0
Prpty
118710
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
557
Mop Psig
920
Mop Cfr Section
Subpart E Pressure Test �195.406(A)(3)
Maop Established Date
1963-01-01 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The controller(s) or control room actions were not the cause of or a contributing factor to the accident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Other Non Threaded Ind
O-Ring
Eq Additional Other Ind
Yes
Eq Additional Other Details
Unable To Determine
Preparer Name
A**** T***** S****
Preparer Title
Senior Compliance Specialist
Preparer Email
A******@c******.com
Preparer Telephone
703 405 5501
Prepared Date
2023-09-22 00:00:00
Authorizer Name
Q****** F******
Authorizer Telephone
770 687 9672
Authorizer Title
Director Pipeline Compliance
Authorizer Email
Q*******@c******.com
Narrative
On 7/10/23, an employee at allentown station was conducting a station check. While walking through the yard the employee identified product at approximately 09:30 am near unit 3's suction and discharge valves. It was determined at 10:35 am the product discovered was an active release. The unit 3 discharge valve was found to be weeping through 3 bolts on the bonnet. The osro was already at the station performing alternative work at the time the release was discovered. Nrc was notified once it was determined the $50k threshold was going to be exceeded. Subsequent analysis determined that the release started on 6/30/23 the cause of the failure is under investigation. Update 9/20/23 - an investigation determined the release was coming from three bolts on the unit 3 discharge valve bonnet as per visual confirmation of the same. The bonnet was separated to investigate and repair and reassemble with a new o-ring. The removed o-ring was examined and found to be in a good condition without visual damage or defects and without evidence of being pinched or displaced from the sealing groove in the installation. The bonnet and valve body sealing surfaces were inspected and confirmed to have adequate surface quality for desired seal performance. As a preemptive measure, the sealing surfaces were cleaned again before repair. The same bolting procedure was followed to the same torque values. A specific failure mode could not be identified as the o-ring and sealing surfaces were in good condition and the recommended assembly and torque methods were followed.
Report Received Date 2023-07-28 00:00:00
Iyear 2023
Report Number 20230173
Supplemental Number 38579
Report Type Supplemental Final
Operator Id 2552 PHMSA Enforcement
Name Colonial Pipeline Co
Operator Street Address 1000 Lake St.
Operator City Name Alpharetta
Operator State Abbreviation GA
Operator Postal Code 30009
Time Zone Eastern
Daylight Savings Ind Yes
Location Latitude 40.15365176 Google Maps OpenStreetMap
Location Longitude -74.65859531 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls 0.82
Recovered Bbls 0.82
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind Yes
Communication State Fed Ind Yes
Party Initiated Communication Operator
Nrc Rpt Num 1372649 NRC Report How to search
Additional Nrc Report Numbers 1372745
Ignite Ind No
Notify Qualified Indiv Ind Yes
Oil Spill Removal Org Ind Yes
Osro Arrived On Site Dt 7/10/2023 10:35
Num Pub Evacuated 0
Pipe Fac Name Colonial Pipeline Company/allentown Station
Segment Name Line 03
Onshore State Abbreviation Nj
Onshore Postal Code 08505
Onshore City Name Bordentown
Onshore County Name Burlington
Designated Location Milepost
Designated Name 446.5
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 24
Crossing No
Pipe Facility Type Interstate
Item Involved Valve
Valve Type Mainline
Valve Mainline Type Gate
Valve Manufacturer Wkm
Installation Year 1963
Manufactured Year Unknown
Material Involved Carbon Steel
Release Type Leak
Leak Type Seal Or Packing
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
Usa Drinking Ind Yes
Usa Drinking Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 210
Est Cost Prop Damage 3500
Est Cost Emergency 99000
Est Cost Environmental 16000
Est Cost Other 0
Prpty 118710
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 557
Mop Psig 920
Mop Cfr Section Subpart E Pressure Test �195.406(A)(3) View CFR 49 §192
Maop Established Date 1963-01-01 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details The controller(s) or control room actions were not the cause of or a contributing factor to the accident
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Non-Threaded Connection Failure
Eq Failure Type Non-Threaded Connection Failure
Other Non Threaded Ind O-Ring
Eq Additional Other Ind Yes
Eq Additional Other Details Unable To Determine
Preparer Name A**** T***** S****
Preparer Title Senior Compliance Specialist
Preparer Email A******@c******.com
Preparer Telephone 703 405 5501
Prepared Date 2023-09-22 00:00:00
Authorizer Name Q****** F******
Authorizer Telephone 770 687 9672
Authorizer Title Director Pipeline Compliance
Authorizer Email Q*******@c******.com
Narrative On 7/10/23, an employee at allentown station was conducting a station check. While walking through the yard the employee identified product at approximately 09:30 am near unit 3's suction and discharge valves. It was determined at 10:35 am the product discovered was an active release. The unit 3 discharge valve was found to be weeping through 3 bolts on the bonnet. The osro was already at the station performing alternative work at the time the release was discovered. Nrc was notified once it was determined the $50k threshold was going to be exceeded. Subsequent analysis determined that the release started on 6/30/23 the cause of the failure is under investigation. Update 9/20/23 - an investigation determined the release was coming from three bolts on the unit 3 discharge valve bonnet as per visual confirmation of the same. The bonnet was separated to investigate and repair and reassemble with a new o-ring. The removed o-ring was examined and found to be in a good condition without visual damage or defects and without evidence of being pinched or displaced from the sealing groove in the installation. The bonnet and valve body sealing surfaces were inspected and confirmed to have adequate surface quality for desired seal performance. As a preemptive measure, the sealing surfaces were cleaned again before repair. The same bolting procedure was followed to the same torque values. A specific failure mode could not be identified as the o-ring and sealing surfaces were in good condition and the recommended assembly and torque methods were followed.