HL incident on 2023-07-21 — TX

Operator
Plains Pipeline, L.p.
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$5,000
Incident datetime
2023-07-21 00:00 UTC
Report number
Location
TX
Narrative
Approximately 2 barrels of crude oil were released from low-pressure surge relief station piping at corpus christi west. The date and time of the release (part a q4) is indicative of the earliest possible time the release could have started as it was the last time the incident location had been visited and confirmed to be no release of crude oil. The cause of the release is attributed to internal corrosion and the investigation is ongoing into the sub-cause. To prevent future releases, the flange was removed from service and replaced. A supplemental report will be submitted pending further investigation into the sub-cause and additional preventative measures. Supplemental: the cause of the incident is attributed to microbiologically induced corrosion based on field examination. Additionally, a third-party analysis of the continuity at the facility was performed, which found that anodic/cathodic interference on one side of the failed flange increased the rate of corrosion. In addition to the previously mentioned preventative measures, isolating gaskets were removed to ensure continuity throughout the facility.
Detailed record list
Report Received Date
2023-07-21 00:00:00
Iyear
2023
Report Number
20230165
Supplemental Number
38732
Report Type
Supplemental Final
Operator Id
Name
Plains Pipeline, L.p.
Operator Street Address
333 Clay Street, Suite 1900
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
2
Recovered Bbls
2
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
No
Shutdown Explain
Facility Not Shutdown Or Isolated For Release Or Repairs; Pump Was Not Running
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Corpus Christi West
Segment Name
Low Pressure Surge Relief Station Piping
Onshore State Abbreviation
Tx
Onshore Postal Code
78409
Onshore City Name
Corpus Christi
Onshore County Name
Nueces
Designated Location
Milepost
Designated Name
0+00
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Other
Item Involved Details
12" Weld-Neck Portion Of Flange
Installation Year
2018
Manufactured Year
2018
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
70
Est Cost Prop Damage
5000
Est Cost Emergency
4000
Est Cost Environmental
0
Est Cost Other
0
Prpty
9070
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
20
Mop Psig
275
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
2018-09-06 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The release was below detectable limits.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Not Cut Open
Int Microbiological Ind
Yes
Int Other Corrosion Ind
Yes
Int Corrosion Type Details
Anodic/cathodic Interference
Int Field Exam Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
No
Corrosion Lining
No
Cleaning Dewatering
Not Applicable - Not Mainline Pipe
Corrosion Coupons
Not Applicable - Not Mainline Pipe
Preparer Name
N****** G*******
Preparer Title
Supervisor Hse-Regulatory Compliance
Preparer Email
N***************@p*****.com
Preparer Telephone
7136464376
Prepared Date
2023-11-01 00:00:00
Local Contact Name
N****** G*******
Local Contact Email
N***************@p*****.com
Local Contact Telephone
7136464376
Authorizer Name
N***** G*****
Authorizer Telephone
7136464336
Authorizer Title
Hse Mgr Director
Authorizer Email
N************@p*****.com
Narrative
Approximately 2 barrels of crude oil were released from low-pressure surge relief station piping at corpus christi west. The date and time of the release (part a q4) is indicative of the earliest possible time the release could have started as it was the last time the incident location had been visited and confirmed to be no release of crude oil. The cause of the release is attributed to internal corrosion and the investigation is ongoing into the sub-cause. To prevent future releases, the flange was removed from service and replaced. A supplemental report will be submitted pending further investigation into the sub-cause and additional preventative measures. Supplemental: the cause of the incident is attributed to microbiologically induced corrosion based on field examination. Additionally, a third-party analysis of the continuity at the facility was performed, which found that anodic/cathodic interference on one side of the failed flange increased the rate of corrosion. In addition to the previously mentioned preventative measures, isolating gaskets were removed to ensure continuity throughout the facility.
Report Received Date 2023-07-21 00:00:00
Iyear 2023
Report Number 20230165
Supplemental Number 38732
Report Type Supplemental Final
Operator Id 300 PHMSA Enforcement
Name Plains Pipeline, L.p.
Operator Street Address 333 Clay Street, Suite 1900
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Time Zone Central
Daylight Savings Ind Yes
Location Latitude 27.821954 Google Maps OpenStreetMap
Location Longitude -97.514374 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 2
Recovered Bbls 2
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
System Part Involved Onshore Terminal/tank Farm Equipment And Piping
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind No
Shutdown Explain Facility Not Shutdown Or Isolated For Release Or Repairs; Pump Was Not Running
Communication State Fed Ind Yes
Party Initiated Communication Operator
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Notify Qualified Indiv Ind Yes
Oil Spill Removal Org Ind No
Num Pub Evacuated 0
Pipe Fac Name Corpus Christi West
Segment Name Low Pressure Surge Relief Station Piping
Onshore State Abbreviation Tx
Onshore Postal Code 78409
Onshore City Name Corpus Christi
Onshore County Name Nueces
Designated Location Milepost
Designated Name 0+00
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Intrastate
Item Involved Other
Item Involved Details 12" Weld-Neck Portion Of Flange
Installation Year 2018
Manufactured Year 2018
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 70
Est Cost Prop Damage 5000
Est Cost Emergency 4000
Est Cost Environmental 0
Est Cost Other 0
Prpty 9070
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 20
Mop Psig 275
Mop Cfr Section Component Design Pressure �195.406(A)(2) View CFR 49 §192
Maop Established Date 2018-09-06 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details The release was below detectable limits.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details Internal Corrosion
Internal External Internal Corrosion
Int Visual Exam Results Not Cut Open
Int Microbiological Ind Yes
Int Other Corrosion Ind Yes
Int Corrosion Type Details Anodic/cathodic Interference
Int Field Exam Basis Ind Yes
Int Low Point Pipe Loc Ind Yes
Corrosion Inhibitors No
Corrosion Lining No
Cleaning Dewatering Not Applicable - Not Mainline Pipe
Corrosion Coupons Not Applicable - Not Mainline Pipe
Preparer Name N****** G*******
Preparer Title Supervisor Hse-Regulatory Compliance
Preparer Email N***************@p*****.com
Preparer Telephone 7136464376
Prepared Date 2023-11-01 00:00:00
Local Contact Name N****** G*******
Local Contact Email N***************@p*****.com
Local Contact Telephone 7136464376
Authorizer Name N***** G*****
Authorizer Telephone 7136464336
Authorizer Title Hse Mgr Director
Authorizer Email N************@p*****.com
Narrative Approximately 2 barrels of crude oil were released from low-pressure surge relief station piping at corpus christi west. The date and time of the release (part a q4) is indicative of the earliest possible time the release could have started as it was the last time the incident location had been visited and confirmed to be no release of crude oil. The cause of the release is attributed to internal corrosion and the investigation is ongoing into the sub-cause. To prevent future releases, the flange was removed from service and replaced. A supplemental report will be submitted pending further investigation into the sub-cause and additional preventative measures. Supplemental: the cause of the incident is attributed to microbiologically induced corrosion based on field examination. Additionally, a third-party analysis of the continuity at the facility was performed, which found that anodic/cathodic interference on one side of the failed flange increased the rate of corrosion. In addition to the previously mentioned preventative measures, isolating gaskets were removed to ensure continuity throughout the facility.

All rights reserved. Copyright © by ClearPHMSA