Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2023-06-28 — OK
Operator
Deeprock Oil Operating, Llc
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$16,860
Incident datetime
2023-06-28 00:00 UTC
Report number
Location
OK
Narrative
Field personnel was on site for maintenance activities at meter skid 770 the morning of june 1st, 2023, and after these maintenance activities, manifold 2 piping and meter skid 760 were handed over to control center operator, to get volumes started outbound from the terminal to a third party customer. The control center operator began opening his flow path from header 2 (tank 7715) and through booster 1 and into the meter skid 760. During the flow path lineup, field personnel noticed a release of oil in the manifold 2 area, between booster pump 1 and booster pump 2, which was quickly investigated to determine the piping associated with the release. Immediately the control room was notified to isolate all valves associated with the area. Upon the isolation of the manifold valves, the flow of oil at the release area was slowed to a minimal amount from the short section of piping suspected to be the leak area. The vac truck that was on site for the meter skid 770 maintenance was quickly moved to the release area and began to evacuate the short section of pipe. During the excavation process, it was determined that this short section of dead leg piping could be un-flanged, removed, headers isolated (blinds), and would have no operational effects on terminal operations. The dead leg piping was removed, the headers were isolated, and the terminal was back to a normal operation state.
Detailed record list
Report Received Date
2023-06-28 00:00:00
Iyear
2023
Report Number
20230138
Supplemental Number
39185
Report Type
Supplemental Final
Operator Id
32575
Name
Deeprock Oil Operating, Llc
Operator Street Address
212 West 116th Street
Operator City Name
Perkins
Operator State Abbreviation
OK
Operator Postal Code
74059
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
36.01462
Location Longitude
-96.74583
Commodity Released Type
Crude Oil
Unintentional Release Bbls
5
Recovered Bbls
5
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Status When Identified
Post-Maintenance/repair
Communication State Fed Ind
No
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Notify Qualified Indiv Ind
No
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Deeprock Oil Operating, Inc
Segment Name
Manifold 2
Onshore State Abbreviation
Ok
Onshore Postal Code
74023
Onshore City Name
Not Within A Municipality
Onshore County Name
Payne
Designated Location
Survey Station No.
Designated Name
Station
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
36
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
20
Pipe Wall Thickness
0.375
Pipe Smys
52000
Pipe Specification
X52
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Husteel Co, Ltd
Pipe Coating Type
Fusion Bonded Epoxy(Fbe)
Coating Applied Ind
Yes
Installation Year
2011
Manufactured Year
2011
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
16860
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
13460
Est Cost Other Details
Outside Services Material Supplies Equipment
Prpty
30320
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
20
Mop Psig
285
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
2012-07-20 00:00:00
Maop Reversal Flow Ind
Bi-Directional
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
< 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The leak occurred during a maintenance activity (field operations) and controller had already released his authority to the field group
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Water Acid Ind
Yes
Int Field Exam Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Int Dead Leg Loc Ind
Yes
Corrosion Inhibitors
Yes
Corrosion Lining
No
Cleaning Dewatering
Not Applicable - Not Mainline Pipe
Corrosion Coupons
Yes
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Intrnl Cor Wtr Drpout Acid Ind
Yes
Preparer Name
C**** O******
Preparer Email
C************@d**************.com
Preparer Telephone
918-225-0503
Prepared Date
2024-02-13 00:00:00
Local Contact Name
M*** A*******
Local Contact Email
M***************@d**************.com
Local Contact Telephone
918-225-0503
Authorizer Name
G**** C*****
Authorizer Telephone
918-225-7100
Authorizer Title
President-Ceo
Authorizer Email
G****@d**************.com
Narrative
Field personnel was on site for maintenance activities at meter skid 770 the morning of june 1st, 2023, and after these maintenance activities, manifold 2 piping and meter skid 760 were handed over to control center operator, to get volumes started outbound from the terminal to a third party customer. The control center operator began opening his flow path from header 2 (tank 7715) and through booster 1 and into the meter skid 760. During the flow path lineup, field personnel noticed a release of oil in the manifold 2 area, between booster pump 1 and booster pump 2, which was quickly investigated to determine the piping associated with the release. Immediately the control room was notified to isolate all valves associated with the area. Upon the isolation of the manifold valves, the flow of oil at the release area was slowed to a minimal amount from the short section of piping suspected to be the leak area. The vac truck that was on site for the meter skid 770 maintenance was quickly moved to the release area and began to evacuate the short section of pipe. During the excavation process, it was determined that this short section of dead leg piping could be un-flanged, removed, headers isolated (blinds), and would have no operational effects on terminal operations. The dead leg piping was removed, the headers were isolated, and the terminal was back to a normal operation state.
Report Received Date | 2023-06-28 00:00:00 |
---|---|
Iyear | 2023 |
Report Number | 20230138 |
Supplemental Number | 39185 |
Report Type | Supplemental Final |
Operator Id | 32575 PHMSA Enforcement |
Name | Deeprock Oil Operating, Llc |
Operator Street Address | 212 West 116th Street |
Operator City Name | Perkins |
Operator State Abbreviation | OK |
Operator Postal Code | 74059 |
Time Zone | Central |
Daylight Savings Ind | Yes |
Location Latitude | 36.01462 Google Maps OpenStreetMap |
Location Longitude | -96.74583 Google Maps OpenStreetMap |
Commodity Released Type | Crude Oil |
Unintentional Release Bbls | 5 |
Recovered Bbls | 5 |
Fatality Ind | No |
Fatal | 0 |
Injury Ind | No |
Injure | 0 |
Accident Identifier | Local Operating Personnel, Including Contractors |
Operator Type | Operator Employee |
System Part Involved | Onshore Terminal/tank Farm Equipment And Piping |
On Off Shore | Onshore |
Status When Identified | Post-Maintenance/repair |
Communication State Fed Ind | No |
Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
Ignite Ind | No |
Notify Qualified Indiv Ind | No |
Oil Spill Removal Org Ind | No |
Num Pub Evacuated | 0 |
Pipe Fac Name | Deeprock Oil Operating, Inc |
Segment Name | Manifold 2 |
Onshore State Abbreviation | Ok |
Onshore Postal Code | 74023 |
Onshore City Name | Not Within A Municipality |
Onshore County Name | Payne |
Designated Location | Survey Station No. |
Designated Name | Station |
Federal | No |
Location Type | Totally Contained On Operator-Controlled Property |
Incident Area Type | Underground |
Incident Area Subtype | Under Soil |
Depth Of Cover | 36 |
Crossing | No |
Pipe Facility Type | Intrastate |
Item Involved | Pipe |
Pipe Type | Pipe Body |
Puddle Weld Ind | No |
Pipe Diameter | 20 |
Pipe Wall Thickness | 0.375 |
Pipe Smys | 52000 |
Pipe Specification | X52 |
Pipe Seam Type | Erw - High Frequency |
Pipe Manufacturer | Husteel Co, Ltd |
Pipe Coating Type | Fusion Bonded Epoxy(Fbe) |
Coating Applied Ind | Yes |
Installation Year | 2011 |
Manufactured Year | 2011 |
Material Involved | Carbon Steel |
Release Type | Leak |
Leak Type | Pinhole |
Wildlife Impact Ind | No |
Soil Contamination | Yes |
Long Term Assessment | No |
Remediation Ind | No |
Water Contam Ind | No |
Could Be Hca | No |
Commodity Reached Hca | No |
Est Cost Oper Paid | 0 |
Est Cost Gas Released | 0 |
Est Cost Prop Damage | 16860 |
Est Cost Emergency | 0 |
Est Cost Environmental | 0 |
Est Cost Other | 13460 |
Est Cost Other Details | Outside Services Material Supplies Equipment |
Prpty | 30320 |
Num Persons Hosp Not Ovnght | 0 |
Num Injured Treated By Emt | 0 |
Num Resident Building Affctd | 0 |
Num Business Building Affctd | 0 |
Accident Psig | 20 |
Mop Psig | 285 |
Mop Cfr Section | Component Design Pressure �195.406(A)(2) View CFR 49 §192 |
Maop Established Date | 2012-07-20 00:00:00 |
Maop Reversal Flow Ind | Bi-Directional |
Accident Pressure | Pressure Did Not Exceed Mop |
Pressure Restriction Ind | No |
Pipeline Function | < 20% Smys Regulated Transmission |
Scada In Place Ind | Yes |
Scada Operating Ind | Yes |
Scada Functional Ind | Yes |
Scada Detection Ind | No |
Scada Conf Ind | No |
Cpm In Place Ind | No |
Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
Investigation Status Details | The leak occurred during a maintenance activity (field operations) and controller had already released his authority to the field group |
Employee Drug Test Ind | No |
Contractor Drug Test Ind | No |
Cause | Corrosion Failure |
Cause Details | Internal Corrosion |
Internal External | Internal Corrosion |
Int Visual Exam Results | Localized Pitting |
Int Water Acid Ind | Yes |
Int Field Exam Basis Ind | Yes |
Int Low Point Pipe Loc Ind | Yes |
Int Dead Leg Loc Ind | Yes |
Corrosion Inhibitors | Yes |
Corrosion Lining | No |
Cleaning Dewatering | Not Applicable - Not Mainline Pipe |
Corrosion Coupons | Yes |
Collected Data Ind | No |
Has Hydrtst Conduc Before Ind | No |
Direct Asmnt Conducted | No |
Non Destructive Exam Ind | No |
Intrnl Cor Wtr Drpout Acid Ind | Yes |
Preparer Name | C**** O****** |
Preparer Email | C************@d**************.com |
Preparer Telephone | 918-225-0503 |
Prepared Date | 2024-02-13 00:00:00 |
Local Contact Name | M*** A******* |
Local Contact Email | M***************@d**************.com |
Local Contact Telephone | 918-225-0503 |
Authorizer Name | G**** C***** |
Authorizer Telephone | 918-225-7100 |
Authorizer Title | President-Ceo |
Authorizer Email | G****@d**************.com |
Narrative | Field personnel was on site for maintenance activities at meter skid 770 the morning of june 1st, 2023, and after these maintenance activities, manifold 2 piping and meter skid 760 were handed over to control center operator, to get volumes started outbound from the terminal to a third party customer. The control center operator began opening his flow path from header 2 (tank 7715) and through booster 1 and into the meter skid 760. During the flow path lineup, field personnel noticed a release of oil in the manifold 2 area, between booster pump 1 and booster pump 2, which was quickly investigated to determine the piping associated with the release. Immediately the control room was notified to isolate all valves associated with the area. Upon the isolation of the manifold valves, the flow of oil at the release area was slowed to a minimal amount from the short section of piping suspected to be the leak area. The vac truck that was on site for the meter skid 770 maintenance was quickly moved to the release area and began to evacuate the short section of pipe. During the excavation process, it was determined that this short section of dead leg piping could be un-flanged, removed, headers isolated (blinds), and would have no operational effects on terminal operations. The dead leg piping was removed, the headers were isolated, and the terminal was back to a normal operation state. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA