Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2023-06-09 — TX
Operator
Ccps Transportation, Llc
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$111,800
Incident datetime
2023-06-09 00:00 UTC
Report number
Location
TX
Narrative
On may 12, 2023, at approximately 7:36 am cdt, a pinhole leak developed on line 55 at mp 25.3071 after an integrity dig crew was sandblasting the area of pipe. The edmonton control center was immediately contacted, and the line was shut down at 7:39 am cdt. The excavation area was evacuated, and enbridge personnel and contractors were mobilized to the site for cleanup and repair. Approximately 2 barrels of crude oil was released and contained within the excavation area. The nrc was notified on may 12, 2023, at 8:42 am cdt (nrc# 1367051). A 48-hour update to the nrc was made on may 13, 2023, at 9:16 pm cdt (nrc# 1367191). The dig at mp 25.3 was issued on april 12, 2023, in response to a priority notification of a corrosion defect called by the december 2022 corrosion inline inspection. The pipe at mp 25.3 is located under a casing as it crosses interstate us39. A sleeve was installed on the pipe and the line was restarted on may 13, 2023, at 6:54 pm cdt. Approximately 53.18 tons of soil was removed from the release site and properly disposed of at an approved facility. A cut out was performed to aid in the investigation to determine a root cause. The results of the investigation indicated that the condensing atmosphere within the casing caused water to drip on the top of the carrier pipe, causing metal loss on the carrier pipe. This process was likely exacerbated by increased pipe operating temperature, as well as the formation of crevices between the pipe and the external coating that formed as corrosion progressed.
Detailed record list
Report Received Date
2023-06-09 00:00:00
Iyear
2023
Report Number
20230124
Supplemental Number
38672
Report Type
Supplemental Final
Operator Id
32080
Name
Ccps Transportation, Llc
Operator Street Address
915 N Eldridge Parkway, Suite 1100
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77079
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
40.74448695
Location Longitude
-89.03489181
Commodity Released Type
Crude Oil
Unintentional Release Bbls
2
Recovered Bbls
2
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
No
Nrc Rpt Num
1367051
Additional Nrc Report Numbers
1367191
Ignite Ind
No
Upstream Action Taken
Valve Closure
Upstream Valve Type Ind
Remotely Controlled
Downstream Action Taken
Valve Closure
Downstream Valve Type Ind
Remotely Controlled
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
Yes
Osro Arrived On Site Dt
5/12/2023 11:30
Num Pub Evacuated
0
Pipe Fac Name
Line 55
Segment Name
Mp 25.3
Onshore State Abbreviation
Il
Onshore Postal Code
61738
Onshore City Name
El Paso
Onshore County Name
Woodford
Designated Location
Milepost
Designated Name
25.3
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Depth Of Cover
54
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
22
Pipe Wall Thickness
0.312
Pipe Smys
46000
Pipe Specification
X46
Pipe Seam Type
Seamless
Pipe Manufacturer
National Tube
Pipe Coating Type
Coal Tar
Coating Applied Ind
No
Installation Year
1953
Manufactured Year
1953
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
150
Est Cost Prop Damage
111800
Est Cost Emergency
20000
Est Cost Environmental
191455
Est Cost Other
0
Prpty
323405
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
389
Mop Psig
939
Mop Cfr Section
Internal Design Pressure �195.406(A)(1)
Maop Established Date
2005-08-11 00:00:00
Maop Reversal Flow Ind
Yes
Surge Analysis Date
2022-04-28 00:00:00
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
Yes
Exceed Restriction Ind
No
Phmsa Restriction Ind
Not Mandated
Length Segment Isolated
209721
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
External Corrosion
Internal External
External Corrosion
Visual Exam Results
Other
Visual Exam Details
Pinhole
Atmosphere Corrosion Ind
Yes
Other Corrosion Ind
Yes
Corrosion Type Details
Inside Casing
Field Exam Basis Ind
Yes
Other Basis Ind
Yes
Corrosion Basis Details
Engineering Analysis And Lab Testing
Underground Location
No
Externally Coated
Yes
Prior Damage
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Ultrasonic Ind
Yes
Geometry Deformation Ind
Yes
Other Tool Tech Ind
Yes
Axial Recent Year
2022
Axial Rcnt Propul Method
Free Swimming
Axial Rcnt Attuned Detect
Metal Loss
Axial Rcnt Atnd Dtct Metal
High Resolution
Axial Previous Year
2018
Axial Prev Propul Method
Free Swimming
Axial Prev Attuned Detect
Metal Loss
Axial Prev Atnd Dtct Metal
High Resolution
Ultrasonic Recent Year
2013
Ultrasonic Rcnt Propul Method
Free Swimming
Ultrasonic Rcnt Attuned
Wall Measurement
Utra Rcnt Att Metl Resolution
Other
Utra Rcnt Att Metl Res Dtls
Ump - High Resolution Suitable To Detect Pitting
Geometry Recent Year
2022
Geometry Rcnt Propul Method
Free Swimming
Geometry Rcnt Resolution
High Resolution
Geometrt Rcnt Measur Cups
Inside Ili Cups
Geometry Previous Year
2018
Geometry Prev Propul Method
Free Swimming
Geometry Prev Resolution
High Resolution
Geometrt Prev Measur Cups
Inside Ili Cups
Other Tool
Ultrasonic Crack Ili
Other Recent Year
2019
Other Rcnt Propul Method
Free Swimming
Other Previous Year
2016
Other Prev Propul Method
Free Swimming
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2005
Hydrtst Most Rcnt Pressure
1213
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
S**** S****
Preparer Title
Advisor Regulatory Compliance
Preparer Email
S**********@e*******.com
Preparer Telephone
7153953620
Prepared Date
2023-10-17 00:00:00
Authorizer Name
L*** S**********
Authorizer Telephone
7153941584
Authorizer Title
Supervisor Regulatory Affairs Compliance
Authorizer Email
L***************@e*******.com
Narrative
On may 12, 2023, at approximately 7:36 am cdt, a pinhole leak developed on line 55 at mp 25.3071 after an integrity dig crew was sandblasting the area of pipe. The edmonton control center was immediately contacted, and the line was shut down at 7:39 am cdt. The excavation area was evacuated, and enbridge personnel and contractors were mobilized to the site for cleanup and repair. Approximately 2 barrels of crude oil was released and contained within the excavation area. The nrc was notified on may 12, 2023, at 8:42 am cdt (nrc# 1367051). A 48-hour update to the nrc was made on may 13, 2023, at 9:16 pm cdt (nrc# 1367191). The dig at mp 25.3 was issued on april 12, 2023, in response to a priority notification of a corrosion defect called by the december 2022 corrosion inline inspection. The pipe at mp 25.3 is located under a casing as it crosses interstate us39. A sleeve was installed on the pipe and the line was restarted on may 13, 2023, at 6:54 pm cdt. Approximately 53.18 tons of soil was removed from the release site and properly disposed of at an approved facility. A cut out was performed to aid in the investigation to determine a root cause. The results of the investigation indicated that the condensing atmosphere within the casing caused water to drip on the top of the carrier pipe, causing metal loss on the carrier pipe. This process was likely exacerbated by increased pipe operating temperature, as well as the formation of crevices between the pipe and the external coating that formed as corrosion progressed.
Report Received Date | 2023-06-09 00:00:00 |
---|---|
Iyear | 2023 |
Report Number | 20230124 |
Supplemental Number | 38672 |
Report Type | Supplemental Final |
Operator Id | 32080 PHMSA Enforcement |
Name | Ccps Transportation, Llc |
Operator Street Address | 915 N Eldridge Parkway, Suite 1100 |
Operator City Name | Houston |
Operator State Abbreviation | TX |
Operator Postal Code | 77079 |
Time Zone | Central |
Daylight Savings Ind | Yes |
Location Latitude | 40.74448695 Google Maps OpenStreetMap |
Location Longitude | -89.03489181 Google Maps OpenStreetMap |
Commodity Released Type | Crude Oil |
Unintentional Release Bbls | 2 |
Recovered Bbls | 2 |
Fatality Ind | No |
Fatal | 0 |
Injury Ind | No |
Injure | 0 |
Accident Identifier | Local Operating Personnel, Including Contractors |
Operator Type | Contractor Working For The Operator |
System Part Involved | Onshore Pipeline, Including Valve Sites |
On Off Shore | Onshore |
Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
Shutdown Due Accident Ind | Yes |
Communication State Fed Ind | No |
Nrc Rpt Num | 1367051 NRC Report How to search |
Additional Nrc Report Numbers | 1367191 |
Ignite Ind | No |
Upstream Action Taken | Valve Closure |
Upstream Valve Type Ind | Remotely Controlled |
Downstream Action Taken | Valve Closure |
Downstream Valve Type Ind | Remotely Controlled |
Notify Qualified Indiv Ind | Yes |
Oil Spill Removal Org Ind | Yes |
Osro Arrived On Site Dt | 5/12/2023 11:30 |
Num Pub Evacuated | 0 |
Pipe Fac Name | Line 55 |
Segment Name | Mp 25.3 |
Onshore State Abbreviation | Il |
Onshore Postal Code | 61738 |
Onshore City Name | El Paso |
Onshore County Name | Woodford |
Designated Location | Milepost |
Designated Name | 25.3 |
Federal | No |
Location Type | Pipeline Right-Of-Way |
Incident Area Type | Underground |
Incident Area Subtype | Exposed Due To Excavation |
Depth Of Cover | 54 |
Crossing | No |
Pipe Facility Type | Interstate |
Item Involved | Pipe |
Pipe Type | Pipe Body |
Puddle Weld Ind | No |
Pipe Diameter | 22 |
Pipe Wall Thickness | 0.312 |
Pipe Smys | 46000 |
Pipe Specification | X46 |
Pipe Seam Type | Seamless |
Pipe Manufacturer | National Tube |
Pipe Coating Type | Coal Tar |
Coating Applied Ind | No |
Installation Year | 1953 |
Manufactured Year | 1953 |
Material Involved | Carbon Steel |
Release Type | Leak |
Leak Type | Pinhole |
Wildlife Impact Ind | No |
Soil Contamination | Yes |
Long Term Assessment | No |
Remediation Ind | No |
Water Contam Ind | No |
Could Be Hca | Yes |
Commodity Reached Hca | No |
Est Cost Oper Paid | 0 |
Est Cost Gas Released | 150 |
Est Cost Prop Damage | 111800 |
Est Cost Emergency | 20000 |
Est Cost Environmental | 191455 |
Est Cost Other | 0 |
Prpty | 323405 |
Num Persons Hosp Not Ovnght | 0 |
Num Injured Treated By Emt | 0 |
Num Resident Building Affctd | 0 |
Num Business Building Affctd | 0 |
Accident Psig | 389 |
Mop Psig | 939 |
Mop Cfr Section | Internal Design Pressure �195.406(A)(1) View CFR 49 §192 |
Maop Established Date | 2005-08-11 00:00:00 |
Maop Reversal Flow Ind | Yes |
Surge Analysis Date | 2022-04-28 00:00:00 |
Accident Pressure | Pressure Did Not Exceed Mop |
Pressure Restriction Ind | Yes |
Exceed Restriction Ind | No |
Phmsa Restriction Ind | Not Mandated |
Length Segment Isolated | 209721 |
Internal Inspection Ind | Yes |
Operation Complications Ind | No |
Pipeline Function | > 20% Smys Regulated Transmission |
Scada In Place Ind | Yes |
Scada Operating Ind | Yes |
Scada Functional Ind | Yes |
Scada Detection Ind | No |
Scada Conf Ind | No |
Cpm In Place Ind | Yes |
Cpm Operating Ind | Yes |
Cpm Functional Ind | Yes |
Cpm Detection Ind | No |
Cpm Conf Ind | No |
Investigation Status | Yes, specify investigation result(s): (select all that apply) |
Invest No Control Room Ind | Yes |
Invest No Controller Ind | Yes |
Employee Drug Test Ind | No |
Contractor Drug Test Ind | No |
Cause | Corrosion Failure |
Cause Details | External Corrosion |
Internal External | External Corrosion |
Visual Exam Results | Other |
Visual Exam Details | Pinhole |
Atmosphere Corrosion Ind | Yes |
Other Corrosion Ind | Yes |
Corrosion Type Details | Inside Casing |
Field Exam Basis Ind | Yes |
Other Basis Ind | Yes |
Corrosion Basis Details | Engineering Analysis And Lab Testing |
Underground Location | No |
Externally Coated | Yes |
Prior Damage | Yes |
Collected Data Ind | Yes |
Axial Magnetic Flx Lkg Ind | Yes |
Ultrasonic Ind | Yes |
Geometry Deformation Ind | Yes |
Other Tool Tech Ind | Yes |
Axial Recent Year | 2022 |
Axial Rcnt Propul Method | Free Swimming |
Axial Rcnt Attuned Detect | Metal Loss |
Axial Rcnt Atnd Dtct Metal | High Resolution |
Axial Previous Year | 2018 |
Axial Prev Propul Method | Free Swimming |
Axial Prev Attuned Detect | Metal Loss |
Axial Prev Atnd Dtct Metal | High Resolution |
Ultrasonic Recent Year | 2013 |
Ultrasonic Rcnt Propul Method | Free Swimming |
Ultrasonic Rcnt Attuned | Wall Measurement |
Utra Rcnt Att Metl Resolution | Other |
Utra Rcnt Att Metl Res Dtls | Ump - High Resolution Suitable To Detect Pitting |
Geometry Recent Year | 2022 |
Geometry Rcnt Propul Method | Free Swimming |
Geometry Rcnt Resolution | High Resolution |
Geometrt Rcnt Measur Cups | Inside Ili Cups |
Geometry Previous Year | 2018 |
Geometry Prev Propul Method | Free Swimming |
Geometry Prev Resolution | High Resolution |
Geometrt Prev Measur Cups | Inside Ili Cups |
Other Tool | Ultrasonic Crack Ili |
Other Recent Year | 2019 |
Other Rcnt Propul Method | Free Swimming |
Other Previous Year | 2016 |
Other Prev Propul Method | Free Swimming |
Has Hydrtst Conduc Before Ind | Yes |
Hydrtst Most Rcnt Year | 2005 |
Hydrtst Most Rcnt Pressure | 1213 |
Direct Asmnt Conducted | No |
Non Destructive Exam Ind | No |
Preparer Name | S**** S**** |
Preparer Title | Advisor Regulatory Compliance |
Preparer Email | S**********@e*******.com |
Preparer Telephone | 7153953620 |
Prepared Date | 2023-10-17 00:00:00 |
Authorizer Name | L*** S********** |
Authorizer Telephone | 7153941584 |
Authorizer Title | Supervisor Regulatory Affairs Compliance |
Authorizer Email | L***************@e*******.com |
Narrative | On may 12, 2023, at approximately 7:36 am cdt, a pinhole leak developed on line 55 at mp 25.3071 after an integrity dig crew was sandblasting the area of pipe. The edmonton control center was immediately contacted, and the line was shut down at 7:39 am cdt. The excavation area was evacuated, and enbridge personnel and contractors were mobilized to the site for cleanup and repair. Approximately 2 barrels of crude oil was released and contained within the excavation area. The nrc was notified on may 12, 2023, at 8:42 am cdt (nrc# 1367051). A 48-hour update to the nrc was made on may 13, 2023, at 9:16 pm cdt (nrc# 1367191). The dig at mp 25.3 was issued on april 12, 2023, in response to a priority notification of a corrosion defect called by the december 2022 corrosion inline inspection. The pipe at mp 25.3 is located under a casing as it crosses interstate us39. A sleeve was installed on the pipe and the line was restarted on may 13, 2023, at 6:54 pm cdt. Approximately 53.18 tons of soil was removed from the release site and properly disposed of at an approved facility. A cut out was performed to aid in the investigation to determine a root cause. The results of the investigation indicated that the condensing atmosphere within the casing caused water to drip on the top of the carrier pipe, causing metal loss on the carrier pipe. This process was likely exacerbated by increased pipe operating temperature, as well as the formation of crevices between the pipe and the external coating that formed as corrosion progressed. |