GTG incident on 2023-12-06 — NE

Operator
Northern Natural Gas Co
Cause
Material Failure Of Pipe Or Weld
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$1,990,000
Incident datetime
2023-12-06 00:00 UTC
Report number
Location
NE
Narrative
On november 7, 2023, a technician identified a grade 3 leak while performing a leak survey on a cased crossing. No ppm was measured in the atmosphere, but the technician was able to detect 580 ppm when the cap for the vent on the cased crossing was removed and a probe was inserted in the vent stack. On november 8, 2023, an ethane detector was used to confirm whether the ppm was natural gas or not. Ethane was confirmed and the ppm had increased to 3,037 inside the vent stack and 56 ppm at atmosphere due to an increase in flow from the previous day. A plan to isolate the segment was implemented while the engineering department started to develop a repair plan. On november 9, 2023, the engineering department concluded that repair costs would exceed the reporting threshold and the nrc was notified as soon as possible after that determination. The leak was stopped on november 22, 2023, after a line stop was installed downstream of the leak, to limit the amount of gas released to the environment. The crossing will be replaced with a new hdd and is scheduled to be completed mid-december 2023. Lab report indicates cracklike indications on the original 1948 construction sleeves and welds.
Detailed record list
Report Received Date
2023-12-06 00:00:00
Iyear
2023
Report Number
20230112
Supplemental Number
39279
Report Type
Supplemental Final
Operator Id
Name
Northern Natural Gas Co
Operator Street Address
1111 South 103rd Street
Operator City Name
Omaha
Operator State Abbreviation
NE
Operator Postal Code
68124
Time Zone
Central
Daylight Savings Ind
No
Location Latitude
Location Longitude
Nrc Rpt Num
Additional Nrc Report Numbers
1384001
Commodity Released Type
Natural Gas
Unintentional Release
10.7
Intentional Release
500
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Status When Identified
Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
No
Ignite Ind
No
Upstream Action Taken
Valve Closure
Downstream Action Taken
Valve Closure
Num Pub Evacuated
0
On Off Shore
Onshore
Onshore State Abbreviation
Ks
Onshore Postal Code
67109
Onshore City Name
Not Within A Municipality
Onshore County Name
Kiowa
Designated Location
Milepost
Designated Name
0.22
Pipe Fac Name
Mullinville To Macksville
Segment Name
M670b
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Other
Incident Area Details
Casing
Depth Of Cover
240
Other Underground Facilities
No
Crossing
Yes
Railroad Crossing Ind
Yes
Railroad Type
Cased
Pipe Facility Type
Interstate
System Part Involved
Onshore Pipeline, Including Valve Sites
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
24
Puddle Weld Ind
No
Pipe Wall Thickness
0.281
Pipe Smys
42000
Pipe Specification
Api 5lx
Pipe Seam Type
Longitudinal Erw - Unknown Frequency
Pipe Manufacturer
Ao Smith
Pipe Coating Type
Coal Tar
Coating Applied Ind
Yes
Installation Year
1948
Manufactured Year
1946
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Crack
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
466
Heat Damage Ind
No
Non Heat Damage Ind
No
Did Occur In Mca Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
18
Est Cost Intentional Release
852
Est Cost Prop Damage
1990000
Est Cost Emergency
0
Est Cost Other
0
Gas Cost In Mcf
1.704
Prpty
1990870
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Wildlife Impact Ind
No
Accident Psig
620
Gas Flow In Pipe In Mcf
8100
Mop Psig
708
Mop Cfr Section
192.619(A)(1)
Maop Established Date
1948-08-01 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Gas Required Odorized Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Length Segment Isolated
75404
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Design-, Construction-, Installation-, Or Fabrication-Related
Pwjf Failure Type
Design-, Construction-, Installation-, Or Fabrication-Related
Field Exam Ind
Yes
Metallurgical Ind
Yes
Other Factor
Yes
Other Factor Details
Original Construction, Girth Weld Reinforcement Crack
Additional Crack Ind
Yes
Post Constr Pressure Test Val
0
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Geometry Deformation Ind
Yes
Axial Recent Year
2020
Axial Rcnt Propul Method
Free Swimming
Axial Rcnt Attuned Detect
Metal Loss
Axial Rcnt Atnd Dtct Metal
High Resolution
Geometry Recent Year
2020
Geometry Rcnt Propul Method
Free Swimming
Geometry Rcnt Resolution
High Resolution
Geometrt Rcnt Measur Cups
No Cups
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
Yes, But The Point Of The Accident Was Not Identified As A Dig Site
Direct Asmnt Pnt Not Idntf Yr
2020
Asmnt Confirmatory Rcnt Year
2020
Asmnt Confirmatory Rcnt Ind
Yes
Non Destructive Exam Ind
No
Pwf Construction Ind
Yes
Pwf Installation Ind
Yes
Preparer Name
D**** C*******
Preparer Title
Sr. Engineer Ii
Preparer Email
D*************@n****.com
Preparer Telephone
4023987439
Authorizer Name
T** C******
Authorizer Telephone
4023987715
Authorizer Email
T*************@n****.com
Narrative
On november 7, 2023, a technician identified a grade 3 leak while performing a leak survey on a cased crossing. No ppm was measured in the atmosphere, but the technician was able to detect 580 ppm when the cap for the vent on the cased crossing was removed and a probe was inserted in the vent stack. On november 8, 2023, an ethane detector was used to confirm whether the ppm was natural gas or not. Ethane was confirmed and the ppm had increased to 3,037 inside the vent stack and 56 ppm at atmosphere due to an increase in flow from the previous day. A plan to isolate the segment was implemented while the engineering department started to develop a repair plan. On november 9, 2023, the engineering department concluded that repair costs would exceed the reporting threshold and the nrc was notified as soon as possible after that determination. The leak was stopped on november 22, 2023, after a line stop was installed downstream of the leak, to limit the amount of gas released to the environment. The crossing will be replaced with a new hdd and is scheduled to be completed mid-december 2023. Lab report indicates cracklike indications on the original 1948 construction sleeves and welds.
Report Received Date 2023-12-06 00:00:00
Iyear 2023
Report Number 20230112
Supplemental Number 39279
Report Type Supplemental Final
Operator Id 13750 PHMSA Enforcement
Name Northern Natural Gas Co
Operator Street Address 1111 South 103rd Street
Operator City Name Omaha
Operator State Abbreviation NE
Operator Postal Code 68124
Time Zone Central
Daylight Savings Ind No
Location Latitude 37.592543 Google Maps OpenStreetMap
Location Longitude -99.413753 Google Maps OpenStreetMap
Nrc Rpt Num 1383910 NRC Report How to search
Additional Nrc Report Numbers 1384001
Commodity Released Type Natural Gas
Unintentional Release 10.7
Intentional Release 500
Accompanying Liquid 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Status When Identified Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind Yes
Communication State Fed Ind No
Ignite Ind No
Upstream Action Taken Valve Closure
Downstream Action Taken Valve Closure
Num Pub Evacuated 0
On Off Shore Onshore
Onshore State Abbreviation Ks
Onshore Postal Code 67109
Onshore City Name Not Within A Municipality
Onshore County Name Kiowa
Designated Location Milepost
Designated Name 0.22
Pipe Fac Name Mullinville To Macksville
Segment Name M670b
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Other
Incident Area Details Casing
Depth Of Cover 240
Other Underground Facilities No
Crossing Yes
Railroad Crossing Ind Yes
Railroad Type Cased
Pipe Facility Type Interstate
System Part Involved Onshore Pipeline, Including Valve Sites
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 24
Puddle Weld Ind No
Pipe Wall Thickness 0.281
Pipe Smys 42000
Pipe Specification Api 5lx
Pipe Seam Type Longitudinal Erw - Unknown Frequency
Pipe Manufacturer Ao Smith
Pipe Coating Type Coal Tar
Coating Applied Ind Yes
Installation Year 1948
Manufactured Year 1946
Material Involved Carbon Steel
Release Type Leak
Leak Type Crack
Class Location Type Class 1 Location
Could Be Hca No
Pir Radius 466
Heat Damage Ind No
Non Heat Damage Ind No
Did Occur In Mca Ind No
Est Cost Oper Paid 0
Est Cost Unintentional Release 18
Est Cost Intentional Release 852
Est Cost Prop Damage 1990000
Est Cost Emergency 0
Est Cost Other 0
Gas Cost In Mcf 1.704
Prpty 1990870
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Wildlife Impact Ind No
Accident Psig 620
Gas Flow In Pipe In Mcf 8100
Mop Psig 708
Mop Cfr Section 192.619(A)(1) View CFR 49 §192
Maop Established Date 1948-08-01 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Maop
Pressure Restriction Ind No
Gas Required Odorized Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Length Segment Isolated 75404
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function Transmission System
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Material Failure Of Pipe Or Weld
Cause Details Design-, Construction-, Installation-, Or Fabrication-Related
Pwjf Failure Type Design-, Construction-, Installation-, Or Fabrication-Related
Field Exam Ind Yes
Metallurgical Ind Yes
Other Factor Yes
Other Factor Details Original Construction, Girth Weld Reinforcement Crack
Additional Crack Ind Yes
Post Constr Pressure Test Val 0
Collected Data Ind Yes
Axial Magnetic Flx Lkg Ind Yes
Geometry Deformation Ind Yes
Axial Recent Year 2020
Axial Rcnt Propul Method Free Swimming
Axial Rcnt Attuned Detect Metal Loss
Axial Rcnt Atnd Dtct Metal High Resolution
Geometry Recent Year 2020
Geometry Rcnt Propul Method Free Swimming
Geometry Rcnt Resolution High Resolution
Geometrt Rcnt Measur Cups No Cups
Has Hydrtst Conduc Before Ind No
Direct Asmnt Conducted Yes, But The Point Of The Accident Was Not Identified As A Dig Site
Direct Asmnt Pnt Not Idntf Yr 2020
Asmnt Confirmatory Rcnt Year 2020
Asmnt Confirmatory Rcnt Ind Yes
Non Destructive Exam Ind No
Pwf Construction Ind Yes
Pwf Installation Ind Yes
Preparer Name D**** C*******
Preparer Title Sr. Engineer Ii
Preparer Email D*************@n****.com
Preparer Telephone 4023987439
Authorizer Name T** C******
Authorizer Telephone 4023987715
Authorizer Email T*************@n****.com
Narrative On november 7, 2023, a technician identified a grade 3 leak while performing a leak survey on a cased crossing. No ppm was measured in the atmosphere, but the technician was able to detect 580 ppm when the cap for the vent on the cased crossing was removed and a probe was inserted in the vent stack. On november 8, 2023, an ethane detector was used to confirm whether the ppm was natural gas or not. Ethane was confirmed and the ppm had increased to 3,037 inside the vent stack and 56 ppm at atmosphere due to an increase in flow from the previous day. A plan to isolate the segment was implemented while the engineering department started to develop a repair plan. On november 9, 2023, the engineering department concluded that repair costs would exceed the reporting threshold and the nrc was notified as soon as possible after that determination. The leak was stopped on november 22, 2023, after a line stop was installed downstream of the leak, to limit the amount of gas released to the environment. The crossing will be replaced with a new hdd and is scheduled to be completed mid-december 2023. Lab report indicates cracklike indications on the original 1948 construction sleeves and welds.