GTG incident on 2023-11-13 — OK

Operator
Transcontinental Gas Pipe Line Company
Cause
Equipment Failure
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$2,500
Incident datetime
2023-11-13 00:00 UTC
Report number
Location
OK
Narrative
Timeline of incident 10/22/23: (all times cdt) pipeline control began to see gas build-up on system with no place for gas to go sta 60 was operating with one line in and one line out -approx 12:10pm person on call (poc) received call from gas control that pressure was rising (approx 796psi) and units were slowing down poc was asked by p/l ctrl to put another discharge line in service -approx 12:13pm main unit #2 psv lifted (this was found from pi vision/hmi trending data) -approx 12:30pm poc arrived at station and heard blowing from compressor building -approx 12:36pm poc shut down and isolated mu2 10/23/23: began troubleshooting psv to determine cause; found trash in pilot (likely cause of failure) 10/26/2023 mu#2 returned to service
Detailed record list
Report Received Date
2023-11-13 00:00:00
Iyear
2023
Report Number
20230105
Supplemental Number
38792
Report Type
Original Final
Operator Id
Name
Transcontinental Gas Pipe Line Company
Operator Street Address
One Williams Center Md 43-4
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74172
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Nrc Rpt Num
Additional Nrc Report Numbers
1382575
Commodity Released Type
Natural Gas
Unintentional Release
3080
Intentional Release
0
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Status When Identified
Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind
No
Shutdown Explain
Release Did Not Impact Pipeline Operations
Communication State Fed Ind
No
Ignite Ind
No
Num Pub Evacuated
0
On Off Shore
Onshore
Onshore State Abbreviation
La
Onshore Postal Code
70748
Onshore City Name
Jackson
Onshore County Name
East Feliciana
Designated Location
Milepost
Designated Name
588.62
Pipe Fac Name
Station 60
Segment Name
Main Unit #2
Federal
No
Location Type
Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
System Part Involved
Onshore Compressor Station Equipment And Piping
Item Involved
Compressor
Installation Year
Unknown
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Other
Release Type Details
Relief Valve Prematurely Lifted And Failed To Seat.
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
648
Heat Damage Ind
No
Non Heat Damage Ind
No
Did Occur In Mca Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
9178
Est Cost Intentional Release
0
Est Cost Prop Damage
2500
Est Cost Emergency
0
Est Cost Other
0
Gas Cost In Mcf
2.98
Prpty
11678
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Wildlife Impact Ind
No
Accident Psig
796
Gas Flow In Pipe In Mcf
8000
Mop Psig
800
Mop Cfr Section
192.619(A)(1)
Maop Established Date
2001-07-21 00:00:00
Maop Reversal Flow Ind
Yes
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Gas Required Odorized Ind
No
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The relief valve was prematurely lifted.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Malfunction Of Control/relief Equipment
Eq Failure Type
Malfunction Of Control/relief Equipment
Relief Valve Ind
Yes
Eq Additional Other Ind
Yes
Eq Additional Other Details
Pulsation In The Sensing Line. Did Not Re-Seat Due To Debris.
Preparer Name
E**** R********
Preparer Title
Regulatory Compliance Specialist Sr.
Preparer Email
E****************@w*******.com
Preparer Telephone
713-303-9956
Local Contact Name
B**** B***
Local Contact Email
B*********@w*******.com
Local Contact Telephone
985-859-5368
Authorizer Name
J*** B***
Authorizer Title
Manager Pipeline Safety
Authorizer Telephone
337-317-9145
Authorizer Email
J********@w*******.com
Narrative
Timeline of incident 10/22/23: (all times cdt) pipeline control began to see gas build-up on system with no place for gas to go sta 60 was operating with one line in and one line out -approx 12:10pm person on call (poc) received call from gas control that pressure was rising (approx 796psi) and units were slowing down poc was asked by p/l ctrl to put another discharge line in service -approx 12:13pm main unit #2 psv lifted (this was found from pi vision/hmi trending data) -approx 12:30pm poc arrived at station and heard blowing from compressor building -approx 12:36pm poc shut down and isolated mu2 10/23/23: began troubleshooting psv to determine cause; found trash in pilot (likely cause of failure) 10/26/2023 mu#2 returned to service
Report Received Date 2023-11-13 00:00:00
Iyear 2023
Report Number 20230105
Supplemental Number 38792
Report Type Original Final
Operator Id 19570 PHMSA Enforcement
Name Transcontinental Gas Pipe Line Company
Operator Street Address One Williams Center Md 43-4
Operator City Name Tulsa
Operator State Abbreviation OK
Operator Postal Code 74172
Time Zone Central
Daylight Savings Ind Yes
Location Latitude 30.744167 Google Maps OpenStreetMap
Location Longitude -91.266389 Google Maps OpenStreetMap
Nrc Rpt Num 1382424 NRC Report How to search
Additional Nrc Report Numbers 1382575
Commodity Released Type Natural Gas
Unintentional Release 3080
Intentional Release 0
Accompanying Liquid 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Status When Identified Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind No
Shutdown Explain Release Did Not Impact Pipeline Operations
Communication State Fed Ind No
Ignite Ind No
Num Pub Evacuated 0
On Off Shore Onshore
Onshore State Abbreviation La
Onshore Postal Code 70748
Onshore City Name Jackson
Onshore County Name East Feliciana
Designated Location Milepost
Designated Name 588.62
Pipe Fac Name Station 60
Segment Name Main Unit #2
Federal No
Location Type Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Interstate
System Part Involved Onshore Compressor Station Equipment And Piping
Item Involved Compressor
Installation Year Unknown
Manufactured Year Unknown
Material Involved Carbon Steel
Release Type Other
Release Type Details Relief Valve Prematurely Lifted And Failed To Seat.
Class Location Type Class 1 Location
Could Be Hca No
Pir Radius 648
Heat Damage Ind No
Non Heat Damage Ind No
Did Occur In Mca Ind No
Est Cost Oper Paid 0
Est Cost Unintentional Release 9178
Est Cost Intentional Release 0
Est Cost Prop Damage 2500
Est Cost Emergency 0
Est Cost Other 0
Gas Cost In Mcf 2.98
Prpty 11678
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Wildlife Impact Ind No
Accident Psig 796
Gas Flow In Pipe In Mcf 8000
Mop Psig 800
Mop Cfr Section 192.619(A)(1) View CFR 49 §192
Maop Established Date 2001-07-21 00:00:00
Maop Reversal Flow Ind Yes
Accident Pressure Pressure Did Not Exceed Maop
Pressure Restriction Ind No
Gas Required Odorized Ind No
Pipeline Function Transmission System
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details The relief valve was prematurely lifted.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Malfunction Of Control/relief Equipment
Eq Failure Type Malfunction Of Control/relief Equipment
Relief Valve Ind Yes
Eq Additional Other Ind Yes
Eq Additional Other Details Pulsation In The Sensing Line. Did Not Re-Seat Due To Debris.
Preparer Name E**** R********
Preparer Title Regulatory Compliance Specialist Sr.
Preparer Email E****************@w*******.com
Preparer Telephone 713-303-9956
Local Contact Name B**** B***
Local Contact Email B*********@w*******.com
Local Contact Telephone 985-859-5368
Authorizer Name J*** B***
Authorizer Title Manager Pipeline Safety
Authorizer Telephone 337-317-9145
Authorizer Email J********@w*******.com
Narrative Timeline of incident 10/22/23: (all times cdt) pipeline control began to see gas build-up on system with no place for gas to go sta 60 was operating with one line in and one line out -approx 12:10pm person on call (poc) received call from gas control that pressure was rising (approx 796psi) and units were slowing down poc was asked by p/l ctrl to put another discharge line in service -approx 12:13pm main unit #2 psv lifted (this was found from pi vision/hmi trending data) -approx 12:30pm poc arrived at station and heard blowing from compressor building -approx 12:36pm poc shut down and isolated mu2 10/23/23: began troubleshooting psv to determine cause; found trash in pilot (likely cause of failure) 10/26/2023 mu#2 returned to service