HL incident on 2023-05-12 — CO

Operator
Tallgrass Powder River Gateway, Llc
Cause
Incorrect Operation
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$8,198
Incident datetime
2023-05-12 00:00 UTC
Report number
Location
CO
Narrative
5/12/2023 original narrative on april 13, 2023, operator personnel were opening vaults containing valves ahead of bi-annual valve maintenance. When the vault for mov-613 at the guernsey north terminal was opened, crude oil was observed. The facility was in a pause between batches and mov-613 was isolated to contain the leak. After the vault was cleaned and cleared for entry, the ansi 150 flange was found to have failed at the at the 8:00 o'clock position on downstream side of the valve in relation to flow. No damage was found on the isolation gasket that would indicate a failure. An investigation is still underway to determine apparent cause and a supplemental report will be submitted once the investigation is complete. Until tallgrass concludes its investigation, it has implemented certain interim measures including opening the vaults at the terminal and visually inspecting them with increased frequency. The crude oil release was confined completely to the vault containing mov-613. There is no impact to the terminal outside of the concrete vault. Another valve in the terminal, installed in a similar fashion as mov-613, was inspected as a preventative measure. Tallgrass will also implement the interim measures discussed above at the other valve vault on the terminal. 5/16/2024 update part g apparent cause updated to g7 incorrect operation the investigation determined that the flange was not properly torqued which resulted in an improper gasket seal causing product to be released into the fully contained concrete vault. The uneven torque placed upon the flange caused an uneven loading of the flange face. Once the flange bolts were tightened to 600 ft/lbs utilising a proper torque sequence the release terminated. The gasket was replaced at the time of the event. Tallgrass has developed site-specific procedure to include periodic inspections of the valves in vaults on a weekly basis.
Detailed record list
Report Received Date
2023-05-12 00:00:00
Iyear
2023
Report Number
20230097
Supplemental Number
39558
Report Type
Supplemental Final
Operator Id
Name
Tallgrass Powder River Gateway, Llc
Operator Street Address
370 Van Gordon Street
Operator City Name
Lakewood
Operator State Abbreviation
CO
Operator Postal Code
80228
Time Zone
Mountain
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
21
Recovered Bbls
21
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
No
Shutdown Explain
Tank And Associated Piping Was Isolated From Pipeline
Communication State Fed Ind
No
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Notify Qualified Indiv Ind
Yes
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Guernsey North
Segment Name
Mov 613
Onshore State Abbreviation
Wy
Onshore Postal Code
82214
Onshore City Name
Not Within A Municipality
Onshore County Name
Platte
Designated Location
Milepost
Designated Name
Facility
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
In Underground Enclosed Space (E.g. Vault)
Depth Of Cover
72
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Valve
Valve Type
Auxiliary Or Other Valve
Installation Year
2015
Manufactured Year
Unknown
Material Involved
Material Other Than Carbon Steel
Material Details
Cast Steel
Release Type
Leak
Leak Type
Connection Failure
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
1726
Est Cost Prop Damage
8198
Est Cost Emergency
4434
Est Cost Environmental
0
Est Cost Other
0
Prpty
14358
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
2.4
Mop Psig
285
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
2015-12-13 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
No
Cpm In Place Ind
No
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Incorrect Operation
Cause Details
Equipment Not Installed Properly
Operation Type
Equipment Not Installed Properly
Related Other Ind
Yes
Operation Related Details
Installation Done By Prior Operator
Category Type
Construction
Operator Qualification Ind
No
Preparer Name
K****** M********
Preparer Title
Sr. Compliance Coordinator
Preparer Email
K****************@t********.com
Preparer Telephone
303-763-3408
Prepared Date
2024-05-16 00:00:00
Authorizer Name
D******* S*******
Authorizer Telephone
7137250147
Authorizer Title
Director Phmsa Compliance
Authorizer Email
D****************@t********.com
Narrative
5/12/2023 original narrative on april 13, 2023, operator personnel were opening vaults containing valves ahead of bi-annual valve maintenance. When the vault for mov-613 at the guernsey north terminal was opened, crude oil was observed. The facility was in a pause between batches and mov-613 was isolated to contain the leak. After the vault was cleaned and cleared for entry, the ansi 150 flange was found to have failed at the at the 8:00 o'clock position on downstream side of the valve in relation to flow. No damage was found on the isolation gasket that would indicate a failure. An investigation is still underway to determine apparent cause and a supplemental report will be submitted once the investigation is complete. Until tallgrass concludes its investigation, it has implemented certain interim measures including opening the vaults at the terminal and visually inspecting them with increased frequency. The crude oil release was confined completely to the vault containing mov-613. There is no impact to the terminal outside of the concrete vault. Another valve in the terminal, installed in a similar fashion as mov-613, was inspected as a preventative measure. Tallgrass will also implement the interim measures discussed above at the other valve vault on the terminal. 5/16/2024 update part g apparent cause updated to g7 incorrect operation the investigation determined that the flange was not properly torqued which resulted in an improper gasket seal causing product to be released into the fully contained concrete vault. The uneven torque placed upon the flange caused an uneven loading of the flange face. Once the flange bolts were tightened to 600 ft/lbs utilising a proper torque sequence the release terminated. The gasket was replaced at the time of the event. Tallgrass has developed site-specific procedure to include periodic inspections of the valves in vaults on a weekly basis.
Report Received Date 2023-05-12 00:00:00
Iyear 2023
Report Number 20230097
Supplemental Number 39558
Report Type Supplemental Final
Operator Id 39963 PHMSA Enforcement
Name Tallgrass Powder River Gateway, Llc
Operator Street Address 370 Van Gordon Street
Operator City Name Lakewood
Operator State Abbreviation CO
Operator Postal Code 80228
Time Zone Mountain
Daylight Savings Ind Yes
Location Latitude 42.254454 Google Maps OpenStreetMap
Location Longitude -104.669554 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 21
Recovered Bbls 21
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
System Part Involved Onshore Terminal/tank Farm Equipment And Piping
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind No
Shutdown Explain Tank And Associated Piping Was Isolated From Pipeline
Communication State Fed Ind No
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Notify Qualified Indiv Ind Yes
Oil Spill Removal Org Ind No
Num Pub Evacuated 0
Pipe Fac Name Guernsey North
Segment Name Mov 613
Onshore State Abbreviation Wy
Onshore Postal Code 82214
Onshore City Name Not Within A Municipality
Onshore County Name Platte
Designated Location Milepost
Designated Name Facility
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Underground
Incident Area Subtype In Underground Enclosed Space (E.g. Vault)
Depth Of Cover 72
Crossing No
Pipe Facility Type Interstate
Item Involved Valve
Valve Type Auxiliary Or Other Valve
Installation Year 2015
Manufactured Year Unknown
Material Involved Material Other Than Carbon Steel
Material Details Cast Steel
Release Type Leak
Leak Type Connection Failure
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 1726
Est Cost Prop Damage 8198
Est Cost Emergency 4434
Est Cost Environmental 0
Est Cost Other 0
Prpty 14358
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 2.4
Mop Psig 285
Mop Cfr Section Component Design Pressure �195.406(A)(2) View CFR 49 §192
Maop Established Date 2015-12-13 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind No
Cpm In Place Ind No
Investigation Status No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Incorrect Operation
Cause Details Equipment Not Installed Properly
Operation Type Equipment Not Installed Properly
Related Other Ind Yes
Operation Related Details Installation Done By Prior Operator
Category Type Construction
Operator Qualification Ind No
Preparer Name K****** M********
Preparer Title Sr. Compliance Coordinator
Preparer Email K****************@t********.com
Preparer Telephone 303-763-3408
Prepared Date 2024-05-16 00:00:00
Authorizer Name D******* S*******
Authorizer Telephone 7137250147
Authorizer Title Director Phmsa Compliance
Authorizer Email D****************@t********.com
Narrative 5/12/2023 original narrative on april 13, 2023, operator personnel were opening vaults containing valves ahead of bi-annual valve maintenance. When the vault for mov-613 at the guernsey north terminal was opened, crude oil was observed. The facility was in a pause between batches and mov-613 was isolated to contain the leak. After the vault was cleaned and cleared for entry, the ansi 150 flange was found to have failed at the at the 8:00 o'clock position on downstream side of the valve in relation to flow. No damage was found on the isolation gasket that would indicate a failure. An investigation is still underway to determine apparent cause and a supplemental report will be submitted once the investigation is complete. Until tallgrass concludes its investigation, it has implemented certain interim measures including opening the vaults at the terminal and visually inspecting them with increased frequency. The crude oil release was confined completely to the vault containing mov-613. There is no impact to the terminal outside of the concrete vault. Another valve in the terminal, installed in a similar fashion as mov-613, was inspected as a preventative measure. Tallgrass will also implement the interim measures discussed above at the other valve vault on the terminal. 5/16/2024 update part g apparent cause updated to g7 incorrect operation the investigation determined that the flange was not properly torqued which resulted in an improper gasket seal causing product to be released into the fully contained concrete vault. The uneven torque placed upon the flange caused an uneven loading of the flange face. Once the flange bolts were tightened to 600 ft/lbs utilising a proper torque sequence the release terminated. The gasket was replaced at the time of the event. Tallgrass has developed site-specific procedure to include periodic inspections of the valves in vaults on a weekly basis.