Incident details
Operator, cause, commodity and consequences with raw source fields.
GTG incident on 2023-09-05 — TX
Operator
Kinder Morgan Tejas Pipeline
Cause
Other Outside Force Damage
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$72,149
Incident datetime
2023-09-05 00:00 UTC
Report number
Location
TX
Narrative
On 8/7/2023 at 10:25 am, a third party contractor contacted kinder morgan tejas gas control regarding a line strike. At 10:30 am tejas operations dispatched tejas personnel to the site to investigate the line strike. The employee arrived onsite at 11:05 am and confirmed the third party line strike. The operator immediately began isolating the line with the downstream valve being closed at 12:47 pm and the upstream valve being closed at 1 pm. The line strike was caused by a third party contractor who was completing mowing in the ditch line. Upon further investigation, it was discovered the pipe was exposed at the point where the line strike occurred. Additionally, it was identified that there were line markers 5 feet from the line strike. In order to prevent reoccurrence, the repaired line was buried with 3 ft. Of cover. Following repairs, the line was returned to service on 8/12/2023 at 12:10 pm.
Detailed record list
Report Received Date
2023-09-05 00:00:00
Iyear
2023
Report Number
20230085
Supplemental Number
38505
Report Type
Original Final
Operator Id
4900
Name
Kinder Morgan Tejas Pipeline
Operator Street Address
1001 Louisiana St, Suite 1000
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Time Zone
Central
Daylight Savings Ind
No
Location Latitude
28.592239
Location Longitude
-96.688508
Nrc Rpt Num
1375452
Additional Nrc Report Numbers
1375595
Commodity Released Type
Natural Gas
Unintentional Release
4777
Intentional Release
1958.7
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Status When Identified
Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Ignite Ind
No
Upstream Action Taken
Valve Closure
Downstream Action Taken
Valve Closure
Num Pub Evacuated
0
On Off Shore
Onshore
Onshore State Abbreviation
Tx
Onshore Postal Code
77979
Onshore City Name
Port Lavaca
Onshore County Name
Calhoun County
Designated Location
Milepost
Designated Name
Milepost 10
Pipe Fac Name
S Longmott Field Line
Segment Name
Index 39-23-1
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Loss Of Cover
Depth Of Cover
3
Other Underground Facilities
No
Crossing
No
Pipe Facility Type
Intrastate
System Part Involved
Onshore Pipeline, Including Valve Sites
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
10.75
Puddle Weld Ind
No
Pipe Wall Thickness
0.279
Pipe Smys
42000
Pipe Specification
Api-5lx
Pipe Seam Type
Seamless
Pipe Manufacturer
National
Pipe Coating Type
Coal Tar
Coating Applied Ind
Unknown
Installation Year
1952
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Mechanical Puncture
Puncture Axial
1
Puncture Circum
2.5
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
221
Heat Damage Ind
No
Non Heat Damage Ind
No
Did Occur In Mca Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
12181
Est Cost Intentional Release
4995
Est Cost Prop Damage
72149
Est Cost Emergency
0
Est Cost Other
0
Gas Cost In Mcf
2.55
Prpty
89325
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Wildlife Impact Ind
No
Accident Psig
780
Gas Flow In Pipe In Mcf
200
Mop Psig
885
Mop Cfr Section
192.619(C)
Maop Established Date
1970-07-01 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Gas Required Odorized Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Length Segment Isolated
13
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Notification From Third Party That Caused The Incident
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Other Outside Force Damage
Cause Details
Other Outside Force Damage
Outside Force Type
Other Outside Force Damage
Osf Other Details
A Third Party, In A Tractor, Working For The Local County Struck Index 39-23-1 While Mowing In A Ditch.
Preparer Name
B***** C******
Preparer Title
Pipeline Engineer
Preparer Email
B*************@k***********.com
Preparer Telephone
8329202845
Authorizer Name
J**** H********
Authorizer Title
Director - Codes And Standards
Authorizer Telephone
7133699443
Authorizer Email
J**************@k***********.com
Narrative
On 8/7/2023 at 10:25 am, a third party contractor contacted kinder morgan tejas gas control regarding a line strike. At 10:30 am tejas operations dispatched tejas personnel to the site to investigate the line strike. The employee arrived onsite at 11:05 am and confirmed the third party line strike. The operator immediately began isolating the line with the downstream valve being closed at 12:47 pm and the upstream valve being closed at 1 pm. The line strike was caused by a third party contractor who was completing mowing in the ditch line. Upon further investigation, it was discovered the pipe was exposed at the point where the line strike occurred. Additionally, it was identified that there were line markers 5 feet from the line strike. In order to prevent reoccurrence, the repaired line was buried with 3 ft. Of cover. Following repairs, the line was returned to service on 8/12/2023 at 12:10 pm.
Report Received Date | 2023-09-05 00:00:00 |
---|---|
Iyear | 2023 |
Report Number | 20230085 |
Supplemental Number | 38505 |
Report Type | Original Final |
Operator Id | 4900 PHMSA Enforcement |
Name | Kinder Morgan Tejas Pipeline |
Operator Street Address | 1001 Louisiana St, Suite 1000 |
Operator City Name | Houston |
Operator State Abbreviation | TX |
Operator Postal Code | 77002 |
Time Zone | Central |
Daylight Savings Ind | No |
Location Latitude | 28.592239 Google Maps OpenStreetMap |
Location Longitude | -96.688508 Google Maps OpenStreetMap |
Nrc Rpt Num | 1375452 NRC Report How to search |
Additional Nrc Report Numbers | 1375595 |
Commodity Released Type | Natural Gas |
Unintentional Release | 4777 |
Intentional Release | 1958.7 |
Accompanying Liquid | 0 |
Fatality Ind | No |
Fatal | 0 |
Injury Ind | No |
Injure | 0 |
Status When Identified | Normal Operation, Includes Pauses During Maintenance |
Shutdown Due Accident Ind | Yes |
Communication State Fed Ind | Yes |
Party Initiated Communication | Operator |
Ignite Ind | No |
Upstream Action Taken | Valve Closure |
Downstream Action Taken | Valve Closure |
Num Pub Evacuated | 0 |
On Off Shore | Onshore |
Onshore State Abbreviation | Tx |
Onshore Postal Code | 77979 |
Onshore City Name | Port Lavaca |
Onshore County Name | Calhoun County |
Designated Location | Milepost |
Designated Name | Milepost 10 |
Pipe Fac Name | S Longmott Field Line |
Segment Name | Index 39-23-1 |
Federal | No |
Location Type | Pipeline Right-Of-Way |
Incident Area Type | Underground |
Incident Area Subtype | Exposed Due To Loss Of Cover |
Depth Of Cover | 3 |
Other Underground Facilities | No |
Crossing | No |
Pipe Facility Type | Intrastate |
System Part Involved | Onshore Pipeline, Including Valve Sites |
Item Involved | Pipe |
Pipe Type | Pipe Body |
Pipe Diameter | 10.75 |
Puddle Weld Ind | No |
Pipe Wall Thickness | 0.279 |
Pipe Smys | 42000 |
Pipe Specification | Api-5lx |
Pipe Seam Type | Seamless |
Pipe Manufacturer | National |
Pipe Coating Type | Coal Tar |
Coating Applied Ind | Unknown |
Installation Year | 1952 |
Manufactured Year | Unknown |
Material Involved | Carbon Steel |
Release Type | Mechanical Puncture |
Puncture Axial | 1 |
Puncture Circum | 2.5 |
Class Location Type | Class 1 Location |
Could Be Hca | No |
Pir Radius | 221 |
Heat Damage Ind | No |
Non Heat Damage Ind | No |
Did Occur In Mca Ind | No |
Est Cost Oper Paid | 0 |
Est Cost Unintentional Release | 12181 |
Est Cost Intentional Release | 4995 |
Est Cost Prop Damage | 72149 |
Est Cost Emergency | 0 |
Est Cost Other | 0 |
Gas Cost In Mcf | 2.55 |
Prpty | 89325 |
Num Persons Hosp Not Ovnght | 0 |
Num Injured Treated By Emt | 0 |
Num Resident Building Affctd | 0 |
Num Business Building Affctd | 0 |
Wildlife Impact Ind | No |
Accident Psig | 780 |
Gas Flow In Pipe In Mcf | 200 |
Mop Psig | 885 |
Mop Cfr Section | 192.619(C) View CFR 49 §192 |
Maop Established Date | 1970-07-01 00:00:00 |
Maop Reversal Flow Ind | No |
Accident Pressure | Pressure Did Not Exceed Maop |
Pressure Restriction Ind | No |
Gas Required Odorized Ind | No |
Upstream Valve Type Ind | Manual |
Downstream Valve Type Ind | Manual |
Length Segment Isolated | 13 |
Internal Inspection Ind | Yes |
Operation Complications Ind | No |
Pipeline Function | Transmission System |
Scada In Place Ind | Yes |
Scada Operating Ind | Yes |
Scada Functional Ind | Yes |
Scada Detection Ind | No |
Scada Conf Ind | No |
Accident Identifier | Notification From Third Party That Caused The Incident |
Investigation Status | Yes, specify investigation result(s): (select all that apply) |
Invest Schedule Ind | Yes |
Invest No Control Room Ind | Yes |
Invest No Controller Ind | Yes |
Employee Drug Test Ind | No |
Contractor Drug Test Ind | No |
Cause | Other Outside Force Damage |
Cause Details | Other Outside Force Damage |
Outside Force Type | Other Outside Force Damage |
Osf Other Details | A Third Party, In A Tractor, Working For The Local County Struck Index 39-23-1 While Mowing In A Ditch. |
Preparer Name | B***** C****** |
Preparer Title | Pipeline Engineer |
Preparer Email | B*************@k***********.com |
Preparer Telephone | 8329202845 |
Authorizer Name | J**** H******** |
Authorizer Title | Director - Codes And Standards |
Authorizer Telephone | 7133699443 |
Authorizer Email | J**************@k***********.com |
Narrative | On 8/7/2023 at 10:25 am, a third party contractor contacted kinder morgan tejas gas control regarding a line strike. At 10:30 am tejas operations dispatched tejas personnel to the site to investigate the line strike. The employee arrived onsite at 11:05 am and confirmed the third party line strike. The operator immediately began isolating the line with the downstream valve being closed at 12:47 pm and the upstream valve being closed at 1 pm. The line strike was caused by a third party contractor who was completing mowing in the ditch line. Upon further investigation, it was discovered the pipe was exposed at the point where the line strike occurred. Additionally, it was identified that there were line markers 5 feet from the line strike. In order to prevent reoccurrence, the repaired line was buried with 3 ft. Of cover. Following repairs, the line was returned to service on 8/12/2023 at 12:10 pm. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA