GD incident on 2023-06-16 — MI
Operator
Consumers Energy Co
Cause
Excavation Issue
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$100,491
Incident datetime
2023-06-16 00:00 UTC
Report number
Location
MI, MACOMB
Narrative
On may 20, 2023, at approximately 10:29 hours consumers energy received notification of a natural gas pipeline damage near the intersection of harper avenue and fierz street, clinton township (macomb county) michigan. The gas distribution supervisor was onsite at approximately 10:55 hours and a gas service worker (gsw) arrived onsite at approximately 11:02 hours. The gsw confirmed a third-party contractor damaged a 4-inch steel (medium pressure) pipeline while boring telecommunication conduit. The gsw began monitoring the area for gas migration and service personnel monitored the area until the gas was contained. Police and fire personnel were onsite and closed the road to ensure the safety of pedestrians and vehicle traffic. No fatalities or injuries occurred because of the damage and subsequent natural gas release. A distribution crew arrive onsite at approximately 12:12 hours and developed a plan to isolate and arrest the blowing gas. Because the pipeline depth was greater than 6-feet, shoring equipment was required to safely access the pipeline. The damaged segment was isolated at approximately 18:04 hours by squeezing the 6-inch s-mp pipeline to the north and south of the 4-inch s-mp pipeline where the damage occurred. Once gas was contained, control fittings were installed on the 6-inch s-mp pipeline and the two sections used during the squeezing operation were replaced. The section of the 4-inch s-mp pipeline where the initial damage occurred was replaced and normal operations resumed on may 21, 2023, at approximately 10:45 hours. Service restoration for all impacted customers began after the pipeline repair.
Detailed record list
Report Received Date
2023-06-16 00:00:00
Iyear
2023.0
Report Number
20230029.0
Supplemental Number
38184.0
Report Type
Original Final
Operator Id
2748
Name
Consumers Energy Co
Operator Street Address
One Energy Plaza
Operator City Name
Jackson
Operator State Abbreviation
MI
Operator Postal Code
49201.0
Time Zone
Eastern
Daylight Savings Ind
Yes
Location Street Address
Harper Avenue & Fierz Street
Location City Name
Clinton Town
Location County Name
Macomb
Location State Abbreviation
MI
Location Postal Code
48035.0
Location Latitude
42.5674
Location Longitude
-82.87167
Flow Cont Squeeze Off Ind
Yes
Nrc Rpt Num
1367814.0
Additional Nrc Report Numbers
1367873.0
Commodity Released Type
Natural Gas
Unintentional Release
3360.0
Intentional Release
0.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Num Pub Evacuated
0.0
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Federal
No
Location Type
Utility Right-Of-Way / Easement
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
72.0
Other Underground Facilities
No
Crossing
No
Pipe Facility Type
Investor Owned
System Part Involved
Main
Installation Year
1969.0
Pipe Diameter
4.0
Pipe Specification
Api 5l
Pipe Manufacturer
Unknown
Material Involved
Steel
Steel Seam Type
Seamless
Wt Steel
0.156
Release Type
Mechanical Puncture
Puncture Axial
4.0
Puncture Circum
9.6
Class Location Type
Class 3 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
100491.0
Est Cost Emergency
2435.0
Est Cost Other
0.0
Gas Cost In Mcf
2.19
Est Cost Unintentional Release
7358.0
Est Cost Intentional Release
0.0
Prpty
110284.0
Commercial Affected
1.0
Industrial Affected
0.0
Residences Affected
1.0
Num Persons Hosp Not Ovnght
0.0
Num Injured Treated By Emt
0.0
Num Resident Building Affctd
1.0
Num Business Building Affctd
1.0
Accident Psig
55.0
Normal Psig
54.0
Mop Psig
60.0
Mop Cfr Section
192.619(A)(2)
Maop Established Date
1969-10-03 00:00:00
Accident Pressure
Pressure Did Not Exceed Maop
Gas Odorized System Type
Injection Pump
Gas Odorized Lvl Not Msrd Ind
Yes
Scada In Place Ind
No
Accident Identifier
Notification From Third Party That Caused The Incident
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
Yes
One Call System Ind
Yes
State Law Exempt Ind
No
Notify Cga Dirt
Yes
Public Row Ind
Yes
Public Subtype
City Street
Excavator Type
Contractor
Excavator Equipment
Directional Drilling
Work Performed
Telecommunications
One Call Notified Ind
Yes
One Call Ticket Num
2023030000000.0
Locator Type
Contract Locator
Visible Marks
Yes
Service Interruption
Yes
Service Interruption Hours
24.0
Root Cause Category
Excavation Issue
Root Cause Type
Improper Excavation Practice Not Listed Above
Preparer Name
C******* Q* K***
Preparer Title
Principal Engineer Technical Analyst
Preparer Email
C************@c********.com
Preparer Telephone
989-280-2963
Local Contact Name
C******* Q* K***
Local Contact Email
C************@c********.com
Local Contact Telephone
989-280-2963
Authorizer Name
J**** E* P****
Authorizer Title
Senior Manager Engineering
Authorizer Telephone
989-598-5031
Authorizer Email
J**********@c********.com
Narrative
On may 20, 2023, at approximately 10:29 hours consumers energy received notification of a natural gas pipeline damage near the intersection of harper avenue and fierz street, clinton township (macomb county) michigan. The gas distribution supervisor was onsite at approximately 10:55 hours and a gas service worker (gsw) arrived onsite at approximately 11:02 hours. The gsw confirmed a third-party contractor damaged a 4-inch steel (medium pressure) pipeline while boring telecommunication conduit. The gsw began monitoring the area for gas migration and service personnel monitored the area until the gas was contained. Police and fire personnel were onsite and closed the road to ensure the safety of pedestrians and vehicle traffic. No fatalities or injuries occurred because of the damage and subsequent natural gas release. A distribution crew arrive onsite at approximately 12:12 hours and developed a plan to isolate and arrest the blowing gas. Because the pipeline depth was greater than 6-feet, shoring equipment was required to safely access the pipeline. The damaged segment was isolated at approximately 18:04 hours by squeezing the 6-inch s-mp pipeline to the north and south of the 4-inch s-mp pipeline where the damage occurred. Once gas was contained, control fittings were installed on the 6-inch s-mp pipeline and the two sections used during the squeezing operation were replaced. The section of the 4-inch s-mp pipeline where the initial damage occurred was replaced and normal operations resumed on may 21, 2023, at approximately 10:45 hours. Service restoration for all impacted customers began after the pipeline repair.
Report Received Date | 2023-06-16 00:00:00 |
---|---|
Iyear | 2023.0 |
Report Number | 20230029.0 |
Supplemental Number | 38184.0 |
Report Type | Original Final |
Operator Id | 2748 PHMSA Enforcement |
Name | Consumers Energy Co |
Operator Street Address | One Energy Plaza |
Operator City Name | Jackson |
Operator State Abbreviation | MI |
Operator Postal Code | 49201.0 |
Time Zone | Eastern |
Daylight Savings Ind | Yes |
Location Street Address | Harper Avenue & Fierz Street |
Location City Name | Clinton Town |
Location County Name | Macomb |
Location State Abbreviation | MI |
Location Postal Code | 48035.0 |
Location Latitude | 42.5674 Google Maps OpenStreetMap |
Location Longitude | -82.87167 Google Maps OpenStreetMap |
Flow Cont Squeeze Off Ind | Yes |
Nrc Rpt Num | 1367814.0 NRC Report How to search |
Additional Nrc Report Numbers | 1367873.0 |
Commodity Released Type | Natural Gas |
Unintentional Release | 3360.0 |
Intentional Release | 0.0 |
Fatality Ind | No |
Fatal | 0 |
Injury Ind | No |
Injure | 0 |
Ignite Ind | No |
Num Pub Evacuated | 0.0 |
Communication State Fed Ind | Yes |
Party Initiated Communication | Operator |
Federal | No |
Location Type | Utility Right-Of-Way / Easement |
Incident Area Type | Underground |
Incident Area Subtype | Under Soil |
Depth Of Cover | 72.0 |
Other Underground Facilities | No |
Crossing | No |
Pipe Facility Type | Investor Owned |
System Part Involved | Main |
Installation Year | 1969.0 |
Pipe Diameter | 4.0 |
Pipe Specification | Api 5l |
Pipe Manufacturer | Unknown |
Material Involved | Steel |
Steel Seam Type | Seamless |
Wt Steel | 0.156 |
Release Type | Mechanical Puncture |
Puncture Axial | 4.0 |
Puncture Circum | 9.6 |
Class Location Type | Class 3 Location |
Est Cost Oper Paid | 0.0 |
Est Cost Prop Damage | 100491.0 |
Est Cost Emergency | 2435.0 |
Est Cost Other | 0.0 |
Gas Cost In Mcf | 2.19 |
Est Cost Unintentional Release | 7358.0 |
Est Cost Intentional Release | 0.0 |
Prpty | 110284.0 |
Commercial Affected | 1.0 |
Industrial Affected | 0.0 |
Residences Affected | 1.0 |
Num Persons Hosp Not Ovnght | 0.0 |
Num Injured Treated By Emt | 0.0 |
Num Resident Building Affctd | 1.0 |
Num Business Building Affctd | 1.0 |
Accident Psig | 55.0 |
Normal Psig | 54.0 |
Mop Psig | 60.0 |
Mop Cfr Section | 192.619(A)(2) View CFR 49 §192 |
Maop Established Date | 1969-10-03 00:00:00 |
Accident Pressure | Pressure Did Not Exceed Maop |
Gas Odorized System Type | Injection Pump |
Gas Odorized Lvl Not Msrd Ind | Yes |
Scada In Place Ind | No |
Accident Identifier | Notification From Third Party That Caused The Incident |
Investigation Status | No, the facility was not monitored by a controller(s) at the time of the incident |
Employee Drug Test Ind | No |
Contractor Drug Test Ind | No |
Cause | Excavation Damage |
Cause Details | Excavation Damage By Third Party |
Ex Party Type | Excavation Damage By Third Party |
Prior Notification Ind | Yes |
One Call System Ind | Yes |
State Law Exempt Ind | No |
Notify Cga Dirt | Yes |
Public Row Ind | Yes |
Public Subtype | City Street |
Excavator Type | Contractor |
Excavator Equipment | Directional Drilling |
Work Performed | Telecommunications |
One Call Notified Ind | Yes |
One Call Ticket Num | 2023030000000.0 |
Locator Type | Contract Locator |
Visible Marks | Yes |
Service Interruption | Yes |
Service Interruption Hours | 24.0 |
Root Cause Category | Excavation Issue |
Root Cause Type | Improper Excavation Practice Not Listed Above |
Preparer Name | C******* Q* K*** |
Preparer Title | Principal Engineer Technical Analyst |
Preparer Email | C************@c********.com |
Preparer Telephone | 989-280-2963 |
Local Contact Name | C******* Q* K*** |
Local Contact Email | C************@c********.com |
Local Contact Telephone | 989-280-2963 |
Authorizer Name | J**** E* P**** |
Authorizer Title | Senior Manager Engineering |
Authorizer Telephone | 989-598-5031 |
Authorizer Email | J**********@c********.com |
Narrative | On may 20, 2023, at approximately 10:29 hours consumers energy received notification of a natural gas pipeline damage near the intersection of harper avenue and fierz street, clinton township (macomb county) michigan. The gas distribution supervisor was onsite at approximately 10:55 hours and a gas service worker (gsw) arrived onsite at approximately 11:02 hours. The gsw confirmed a third-party contractor damaged a 4-inch steel (medium pressure) pipeline while boring telecommunication conduit. The gsw began monitoring the area for gas migration and service personnel monitored the area until the gas was contained. Police and fire personnel were onsite and closed the road to ensure the safety of pedestrians and vehicle traffic. No fatalities or injuries occurred because of the damage and subsequent natural gas release. A distribution crew arrive onsite at approximately 12:12 hours and developed a plan to isolate and arrest the blowing gas. Because the pipeline depth was greater than 6-feet, shoring equipment was required to safely access the pipeline. The damaged segment was isolated at approximately 18:04 hours by squeezing the 6-inch s-mp pipeline to the north and south of the 4-inch s-mp pipeline where the damage occurred. Once gas was contained, control fittings were installed on the 6-inch s-mp pipeline and the two sections used during the squeezing operation were replaced. The section of the 4-inch s-mp pipeline where the initial damage occurred was replaced and normal operations resumed on may 21, 2023, at approximately 10:45 hours. Service restoration for all impacted customers began after the pipeline repair. |