GTG incident on 2023-02-22 — TX

Operator
Acadian Gas Pipeline System
Cause
Equipment Failure
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$325,000
Incident datetime
2023-02-22 00:00 UTC
Report number
Location
TX
Narrative
On january 26, 2023 at 11:00 central time (ct), enterprise operations received a call from a local fisherman of bubbles in little tensas bayou near our chico b pipeline in the atchafalaya basin. At 11:45 ct, operations personnel confirmed the bubbles in the water were near the chico b pipeline. On january 27, 2023 at 10:55 ct divers confirmed the leak from the chico b pipeline. The upstream and downstream manual valves were closed at 15:00 ct to isolate the leak area. Enterprise determined the event to be reportable to the nrc due to exceedance of repair cost on february 8, 2023 at 17:41 ct. An existing pipeline clamp was determined to be leaking. The clamp was removed and replaced with a new clamp. Revisions to part g6 equipment failure - sub-cause have been made changing from non-threaded connection to other equipment failure. Revisions to part h narrative have been made clarifying waterway with little tensas bayou.
Detailed record list
Report Received Date
2023-02-22 00:00:00
Iyear
2023
Report Number
20230020
Supplemental Number
37889
Report Type
Supplemental Final
Operator Id
Name
Acadian Gas Pipeline System
Operator Street Address
1100 Louisiana St.
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Time Zone
Central
Daylight Savings Ind
No
Location Latitude
Location Longitude
Nrc Rpt Num
Additional Nrc Report Numbers
1359742
Commodity Released Type
Natural Gas
Unintentional Release
67
Intentional Release
21000
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Status When Identified
Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind
Yes
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Ignite Ind
No
Upstream Action Taken
Valve Closure
Downstream Action Taken
Valve Closure
Num Pub Evacuated
0
On Off Shore
Onshore
Onshore State Abbreviation
La
Onshore Postal Code
70538
Onshore City Name
Belle River
Onshore County Name
St. Martin
Designated Location
Survey Station No.
Designated Name
1619+81
Pipe Fac Name
Chico B
Segment Name
307-0100
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
12
Other Underground Facilities
No
Crossing
No
Pipe Facility Type
Intrastate
System Part Involved
Onshore Pipeline, Including Valve Sites
Item Involved
Repair Sleeve Or Clamp
Installation Year
2013
Manufactured Year
2013
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Seal Or Packing
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
430
Heat Damage Ind
No
Non Heat Damage Ind
No
Did Occur In Mca Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
206
Est Cost Intentional Release
64680
Est Cost Prop Damage
325000
Est Cost Emergency
2000
Est Cost Other
0
Gas Cost In Mcf
3.08
Prpty
391886
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Wildlife Impact Ind
No
Accident Psig
840
Gas Flow In Pipe In Mcf
70
Mop Psig
970
Mop Cfr Section
192.619(A)(2)
Maop Established Date
1966-08-17 00:00:00
Maop Reversal Flow Ind
Bi-Directional
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Gas Required Odorized Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Length Segment Isolated
89760
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Notification From Public
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The controller(s) or control room were not contributing factors in this incident, this was a leaking clamp on the pipeline.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Other Equipment Failure
Eq Failure Type
Other Equipment Failure
Eq Failure Details
Plidco Clamp End Seal Failure.
Eq Additional Other Ind
Yes
Eq Additional Other Details
Plidco Clamp End Seal Failure
Preparer Name
N***** G***
Preparer Title
Senior Pipeline Compliance Specialist
Preparer Email
N****@e****.com
Preparer Telephone
985-493-4629
Local Contact Name
N***** G***
Local Contact Email
N****@e****.com
Local Contact Telephone
985-493-4629
Authorizer Name
N*** T*****
Authorizer Title
Senior Compliance Manager
Authorizer Telephone
713-381-2493
Authorizer Email
N*******@e****.com
Narrative
On january 26, 2023 at 11:00 central time (ct), enterprise operations received a call from a local fisherman of bubbles in little tensas bayou near our chico b pipeline in the atchafalaya basin. At 11:45 ct, operations personnel confirmed the bubbles in the water were near the chico b pipeline. On january 27, 2023 at 10:55 ct divers confirmed the leak from the chico b pipeline. The upstream and downstream manual valves were closed at 15:00 ct to isolate the leak area. Enterprise determined the event to be reportable to the nrc due to exceedance of repair cost on february 8, 2023 at 17:41 ct. An existing pipeline clamp was determined to be leaking. The clamp was removed and replaced with a new clamp. Revisions to part g6 equipment failure - sub-cause have been made changing from non-threaded connection to other equipment failure. Revisions to part h narrative have been made clarifying waterway with little tensas bayou.
Report Received Date 2023-02-22 00:00:00
Iyear 2023
Report Number 20230020
Supplemental Number 37889
Report Type Supplemental Final
Operator Id 3 PHMSA Enforcement
Name Acadian Gas Pipeline System
Operator Street Address 1100 Louisiana St.
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Time Zone Central
Daylight Savings Ind No
Location Latitude 29.896266 Google Maps OpenStreetMap
Location Longitude -91.322753 Google Maps OpenStreetMap
Nrc Rpt Num 1359602 NRC Report How to search
Additional Nrc Report Numbers 1359742
Commodity Released Type Natural Gas
Unintentional Release 67
Intentional Release 21000
Accompanying Liquid 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Status When Identified Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind Yes
Communication State Fed Ind Yes
Party Initiated Communication Operator
Ignite Ind No
Upstream Action Taken Valve Closure
Downstream Action Taken Valve Closure
Num Pub Evacuated 0
On Off Shore Onshore
Onshore State Abbreviation La
Onshore Postal Code 70538
Onshore City Name Belle River
Onshore County Name St. Martin
Designated Location Survey Station No.
Designated Name 1619+81
Pipe Fac Name Chico B
Segment Name 307-0100
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 12
Other Underground Facilities No
Crossing No
Pipe Facility Type Intrastate
System Part Involved Onshore Pipeline, Including Valve Sites
Item Involved Repair Sleeve Or Clamp
Installation Year 2013
Manufactured Year 2013
Material Involved Carbon Steel
Release Type Leak
Leak Type Seal Or Packing
Class Location Type Class 1 Location
Could Be Hca No
Pir Radius 430
Heat Damage Ind No
Non Heat Damage Ind No
Did Occur In Mca Ind No
Est Cost Oper Paid 0
Est Cost Unintentional Release 206
Est Cost Intentional Release 64680
Est Cost Prop Damage 325000
Est Cost Emergency 2000
Est Cost Other 0
Gas Cost In Mcf 3.08
Prpty 391886
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Wildlife Impact Ind No
Accident Psig 840
Gas Flow In Pipe In Mcf 70
Mop Psig 970
Mop Cfr Section 192.619(A)(2) View CFR 49 §192
Maop Established Date 1966-08-17 00:00:00
Maop Reversal Flow Ind Bi-Directional
Accident Pressure Pressure Did Not Exceed Maop
Pressure Restriction Ind No
Gas Required Odorized Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Length Segment Isolated 89760
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function Transmission System
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Accident Identifier Notification From Public
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details The controller(s) or control room were not contributing factors in this incident, this was a leaking clamp on the pipeline.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Other Equipment Failure
Eq Failure Type Other Equipment Failure
Eq Failure Details Plidco Clamp End Seal Failure.
Eq Additional Other Ind Yes
Eq Additional Other Details Plidco Clamp End Seal Failure
Preparer Name N***** G***
Preparer Title Senior Pipeline Compliance Specialist
Preparer Email N****@e****.com
Preparer Telephone 985-493-4629
Local Contact Name N***** G***
Local Contact Email N****@e****.com
Local Contact Telephone 985-493-4629
Authorizer Name N*** T*****
Authorizer Title Senior Compliance Manager
Authorizer Telephone 713-381-2493
Authorizer Email N*******@e****.com
Narrative On january 26, 2023 at 11:00 central time (ct), enterprise operations received a call from a local fisherman of bubbles in little tensas bayou near our chico b pipeline in the atchafalaya basin. At 11:45 ct, operations personnel confirmed the bubbles in the water were near the chico b pipeline. On january 27, 2023 at 10:55 ct divers confirmed the leak from the chico b pipeline. The upstream and downstream manual valves were closed at 15:00 ct to isolate the leak area. Enterprise determined the event to be reportable to the nrc due to exceedance of repair cost on february 8, 2023 at 17:41 ct. An existing pipeline clamp was determined to be leaking. The clamp was removed and replaced with a new clamp. Revisions to part g6 equipment failure - sub-cause have been made changing from non-threaded connection to other equipment failure. Revisions to part h narrative have been made clarifying waterway with little tensas bayou.

All rights reserved. Copyright © by ClearPHMSA