HL incident on 2022-11-29 — TX

Operator
Ironwood Midstream Energy Partners, Llc
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$150
Incident datetime
2022-11-29 11:30
Report number
Location
TX
Narrative
On november 29, 2022, at approximately 11:00 am, ironwood local field operations was notified by a third-party operator that there was a leaking fitting on the pig receiver for the gray oak lateral. Ironwood operators were dispatched to the location to investigate the leak report and found the pressure indicator on the pig receiver leaking. The fitting was tightened, and the leak stopped. The operator then isolated the pig receiver from the pipeline and relieved the pressure on the receiver to allow them to remove the fitting and investigate the cause, it was determined that the o-ring failed due to ambient temperature changes. The o-ring was replaced, no repairs were made to the pipeline. The release volume was calculated to be 1.6 barrels. There were no injuries, fatalities, unintentional fires/explosions, evacuations, or road closures as a result of the leak. To prevent re-occurrence of the same type of accident ensured the correct type of o-rings are being used and inspected other sites with the same type of configuration.
Detailed record list
Report Received Date
2022-12-27 00:00:00
Iyear
2022
Report Number
20220293
Supplemental Number
37622
Report Type
Supplemental Final
Operator Id
Name
Ironwood Midstream Energy Partners, Llc
Operator Street Address
15727 Anthem Parkway, Suite 510
Operator City Name
San Antonio
Operator State Abbreviation
TX
Operator Postal Code
78249
Local Datetime
2022-11-29 12:39:00
Time Zone
Central
Daylight Savings Ind
No
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
1.6
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Other
Accident Details
Third-Party Operator
Incident Identified Datetime
2022-11-29 11:30:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
No
Shutdown Explain
Operator Tightened The Receiver Pressure Indicator And Stopped The Leak.
Communication State Fed Ind
No
On Site Datetime
2022-11-29 11:30:00
Confirmed Discovery Datetime
2022-11-29 12:39:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Upstream Action Taken
Operational Control
Upstream Oprtnl Cntrl Detail
Operator Tightened The Receiver Pressure Indicator And Stopped The Leak.
Downstream Action Taken
Operational Control
Downstream Oprtnl Cntrl Detail
Operator Tightened The Receiver Pressure Indicator And Stopped The Leak.
Notify Qualified Indiv Ind
No
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Gray Oak Lateral
Segment Name
Receiver
Onshore State Abbreviation
Tx
Onshore Postal Code
78118
Onshore City Name
Not Within A Municipality
Onshore County Name
Karnes
Designated Location
Milepost
Designated Name
Pig Receiver
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Other
Incident Area Details
Pig Receiver
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Scraper/pig Trap
Installation Year
2020
Manufactured Year
2020
Material Involved
Material Other Than Carbon Steel
Material Details
O-Ring
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
125
Est Cost Prop Damage
150
Est Cost Emergency
600
Est Cost Environmental
1250
Est Cost Other
0
Prpty
2125
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
52
Mop Psig
1440
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
2020-05-01 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
< 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
There was a small leak caused by an o-ring failure, no controller activity is associated with the leak.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Other Non Threaded Ind
O-Ring
Eq Additional Other Ind
Yes
Eq Additional Other Details
O-Ring Failure On Receiver Pressure Indicator.
Eqf Threaded Coupling Ind
Yes
Preparer Name
C**** W*******
Preparer Title
Regulatory Compliance Manager
Preparer Email
C*************@i****************.com
Preparer Telephone
8067596499
Prepared Date
2023-01-24 00:00:00
Local Contact Name
C**** W*******
Local Contact Email
C*************@i****************.com
Local Contact Telephone
8067596499
Authorizer Name
C**** W*******
Authorizer Telephone
8067596499
Authorizer Title
Regulatory Compliance Manager
Authorizer Email
C*************@i****************.com
Narrative
On november 29, 2022, at approximately 11:00 am, ironwood local field operations was notified by a third-party operator that there was a leaking fitting on the pig receiver for the gray oak lateral. Ironwood operators were dispatched to the location to investigate the leak report and found the pressure indicator on the pig receiver leaking. The fitting was tightened, and the leak stopped. The operator then isolated the pig receiver from the pipeline and relieved the pressure on the receiver to allow them to remove the fitting and investigate the cause, it was determined that the o-ring failed due to ambient temperature changes. The o-ring was replaced, no repairs were made to the pipeline. The release volume was calculated to be 1.6 barrels. There were no injuries, fatalities, unintentional fires/explosions, evacuations, or road closures as a result of the leak. To prevent re-occurrence of the same type of accident ensured the correct type of o-rings are being used and inspected other sites with the same type of configuration.
Report Received Date 2022-12-27 00:00:00
Iyear 2022
Report Number 20220293
Supplemental Number 37622
Report Type Supplemental Final
Operator Id 39649 PHMSA Enforcement
Name Ironwood Midstream Energy Partners, Llc
Operator Street Address 15727 Anthem Parkway, Suite 510
Operator City Name San Antonio
Operator State Abbreviation TX
Operator Postal Code 78249
Local Datetime 2022-11-29 12:39:00
Time Zone Central
Daylight Savings Ind No
Location Latitude 28.933308 Google Maps OpenStreetMap
Location Longitude -97.791171 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 1.6
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Other
Accident Details Third-Party Operator
Incident Identified Datetime 2022-11-29 11:30:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind No
Shutdown Explain Operator Tightened The Receiver Pressure Indicator And Stopped The Leak.
Communication State Fed Ind No
On Site Datetime 2022-11-29 11:30:00
Confirmed Discovery Datetime 2022-11-29 12:39:00
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Upstream Action Taken Operational Control
Upstream Oprtnl Cntrl Detail Operator Tightened The Receiver Pressure Indicator And Stopped The Leak.
Downstream Action Taken Operational Control
Downstream Oprtnl Cntrl Detail Operator Tightened The Receiver Pressure Indicator And Stopped The Leak.
Notify Qualified Indiv Ind No
Oil Spill Removal Org Ind No
Num Pub Evacuated 0
Pipe Fac Name Gray Oak Lateral
Segment Name Receiver
Onshore State Abbreviation Tx
Onshore Postal Code 78118
Onshore City Name Not Within A Municipality
Onshore County Name Karnes
Designated Location Milepost
Designated Name Pig Receiver
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Other
Incident Area Details Pig Receiver
Crossing No
Pipe Facility Type Intrastate
Item Involved Scraper/pig Trap
Installation Year 2020
Manufactured Year 2020
Material Involved Material Other Than Carbon Steel
Material Details O-Ring
Release Type Leak
Leak Type Seal Or Packing
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 125
Est Cost Prop Damage 150
Est Cost Emergency 600
Est Cost Environmental 1250
Est Cost Other 0
Prpty 2125
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 52
Mop Psig 1440
Mop Cfr Section Component Design Pressure �195.406(A)(2) View CFR 49 §192
Maop Established Date 2020-05-01 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function < 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details There was a small leak caused by an o-ring failure, no controller activity is associated with the leak.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Non-Threaded Connection Failure
Eq Failure Type Non-Threaded Connection Failure
Other Non Threaded Ind O-Ring
Eq Additional Other Ind Yes
Eq Additional Other Details O-Ring Failure On Receiver Pressure Indicator.
Eqf Threaded Coupling Ind Yes
Preparer Name C**** W*******
Preparer Title Regulatory Compliance Manager
Preparer Email C*************@i****************.com
Preparer Telephone 8067596499
Prepared Date 2023-01-24 00:00:00
Local Contact Name C**** W*******
Local Contact Email C*************@i****************.com
Local Contact Telephone 8067596499
Authorizer Name C**** W*******
Authorizer Telephone 8067596499
Authorizer Title Regulatory Compliance Manager
Authorizer Email C*************@i****************.com
Narrative On november 29, 2022, at approximately 11:00 am, ironwood local field operations was notified by a third-party operator that there was a leaking fitting on the pig receiver for the gray oak lateral. Ironwood operators were dispatched to the location to investigate the leak report and found the pressure indicator on the pig receiver leaking. The fitting was tightened, and the leak stopped. The operator then isolated the pig receiver from the pipeline and relieved the pressure on the receiver to allow them to remove the fitting and investigate the cause, it was determined that the o-ring failed due to ambient temperature changes. The o-ring was replaced, no repairs were made to the pipeline. The release volume was calculated to be 1.6 barrels. There were no injuries, fatalities, unintentional fires/explosions, evacuations, or road closures as a result of the leak. To prevent re-occurrence of the same type of accident ensured the correct type of o-rings are being used and inspected other sites with the same type of configuration.

All rights reserved. Copyright © by ClearPHMSA