HL incident on 2022-11-14 — TX
Operator
Exxonmobil Pipeline Company Llc
Cause
Incorrect Operation
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$65
Incident datetime
2022-11-14 11:11
Report number
Location
TX
Narrative
Incident description: tank 2177 was being commissioned after repairs. The suction fill line (tank leg) is a 40" line with a 40" shell valve. The shell valve was removed to air gap the tank to allow for safe confined space work. After repairs were completed, the shell valve was reinstalled. Commissioning commenced on 11/14 at 10:44 a.M. Empco llc personnel and a contractor crew were staged at the tank valve along with containment tub under the valve to capture any potential drips. At 11:11 a.M., 27 minutes into the commissioning personnel noticed a drip at the bottom of the flange. Empco llc. Immediately instructed operations to shut down the delivery. Within one minute of the drip starting, gasoline began to release from the bottom of the flange into the containment tub. (4 o'clock to 8 o'clock position bottom of the flange) at 11:12 a.M. Operations manually closed the delivery valve. At that same time empco drove to the manifold to open a 6" water drain valve to remove all product from tank leg. Delivery valve was fully closed around 11:15 a.M. At approximately 11:46 product stopped leaking from flange. Root cause: adhesive was utilized to maintain gasket alignment but due to the tight spacing, the gar-loc gasket slipped out of alignment on the top of the flange during installation of the 40" valve. This caused the release of product from the top of the flange. Immediate corrective actions were taken to isolate and drain down the tank line. The root cause of this incident was that the installation technician did not use a self-centering gasket. Prevention of re-occurrence: below are the actions empco has taken to prevent the incident from happening again: -the bolt up procedure for this valve was updated to utilize a self-centering gasket. -gar-loc gasket maker will provide additional training to assist with self-centering gasket options for tight spaces. Updates to the initial report: -updated the time accident criteria was met -updated the time the qi was notified -updated the root cause of the incident -updated the costs for emergency response and environmental remediation -updated the narrative
Detailed record list
Report Received Date
2022-12-12 00:00:00
Iyear
2022
Report Number
20220282
Supplemental Number
37550
Report Type
Supplemental Final
Operator Id
4906
Name
Exxonmobil Pipeline Company Llc
Operator Street Address
22777 Springwoods Village Parkway E2.2b-Emp
Operator City Name
Spring
Operator State Abbreviation
TX
Operator Postal Code
77389
Local Datetime
2022-11-14 11:11:00
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
29.717072
Location Longitude
-95.163308
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
17
Recovered Bbls
14
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2022-11-14 11:11:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Status When Identified
Post-Maintenance/repair
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Initial Responder Com Datetime
2022-11-14 11:11:00
On Site Datetime
2022-11-14 11:11:00
Confirmed Discovery Datetime
2022-11-14 14:05:00
Nrc Rpt Datetime
2022-11-14 14:43:00
Nrc Rpt Num
1352552
Additional Nrc Report Numbers
1352700
Ignite Ind
No
Notify Qualified Indiv Ind
Yes
Qualified Indiv Notif Datetime
2022-11-14 11:15:00
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Pasadena Station
Segment Name
Tank #2177 Fill Line
Onshore State Abbreviation
Tx
Onshore Postal Code
77503
Onshore City Name
Pasadena
Onshore County Name
Harris
Designated Location
Milepost
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Depth Of Cover
48
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Valve
Valve Type
Auxiliary Or Other Valve
Installation Year
2022
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Connection Failure
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
1870
Est Cost Prop Damage
65
Est Cost Emergency
15000
Est Cost Environmental
18000
Est Cost Other
0
Prpty
34935
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
1
Mop Psig
125
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
1975-01-01 00:00:00
Maop Reversal Flow Ind
Bi-Directional
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
< 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Control room actions were not a contributing factor to the release.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Incorrect Operation
Cause Details
Equipment Not Installed Properly
Operation Type
Equipment Not Installed Properly
Related Inadequate Proc Ind
Yes
Category Type
Other Maintenance
Operator Qualification Ind
No
Eqf Non Threaded Ind
Yes
Preparer Name
R***** P S**********
Preparer Title
Pipeline Safety Advisor
Preparer Email
R*******************@e*********.com
Preparer Telephone
618-267-9641
Prepared Date
2023-01-06 00:00:00
Local Contact Name
R***** P S**********
Local Contact Email
R*******************@e*********.com
Local Contact Telephone
618-267-9641
Authorizer Name
T****** H* B*****
Authorizer Telephone
713-819-9504
Authorizer Title
Regulatory Compliance Supervisor
Authorizer Email
T***************@e*********.com
Narrative
Incident description: tank 2177 was being commissioned after repairs. The suction fill line (tank leg) is a 40" line with a 40" shell valve. The shell valve was removed to air gap the tank to allow for safe confined space work. After repairs were completed, the shell valve was reinstalled. Commissioning commenced on 11/14 at 10:44 a.M. Empco llc personnel and a contractor crew were staged at the tank valve along with containment tub under the valve to capture any potential drips. At 11:11 a.M., 27 minutes into the commissioning personnel noticed a drip at the bottom of the flange. Empco llc. Immediately instructed operations to shut down the delivery. Within one minute of the drip starting, gasoline began to release from the bottom of the flange into the containment tub. (4 o'clock to 8 o'clock position bottom of the flange) at 11:12 a.M. Operations manually closed the delivery valve. At that same time empco drove to the manifold to open a 6" water drain valve to remove all product from tank leg. Delivery valve was fully closed around 11:15 a.M. At approximately 11:46 product stopped leaking from flange. Root cause: adhesive was utilized to maintain gasket alignment but due to the tight spacing, the gar-loc gasket slipped out of alignment on the top of the flange during installation of the 40" valve. This caused the release of product from the top of the flange. Immediate corrective actions were taken to isolate and drain down the tank line. The root cause of this incident was that the installation technician did not use a self-centering gasket. Prevention of re-occurrence: below are the actions empco has taken to prevent the incident from happening again: -the bolt up procedure for this valve was updated to utilize a self-centering gasket. -gar-loc gasket maker will provide additional training to assist with self-centering gasket options for tight spaces. Updates to the initial report: -updated the time accident criteria was met -updated the time the qi was notified -updated the root cause of the incident -updated the costs for emergency response and environmental remediation -updated the narrative
| Report Received Date | 2022-12-12 00:00:00 |
|---|---|
| Iyear | 2022 |
| Report Number | 20220282 |
| Supplemental Number | 37550 |
| Report Type | Supplemental Final |
| Operator Id | 4906 PHMSA Enforcement |
| Name | Exxonmobil Pipeline Company Llc |
| Operator Street Address | 22777 Springwoods Village Parkway E2.2b-Emp |
| Operator City Name | Spring |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77389 |
| Local Datetime | 2022-11-14 11:11:00 |
| Time Zone | Central |
| Daylight Savings Ind | Yes |
| Location Latitude | 29.717072 Google Maps OpenStreetMap |
| Location Longitude | -95.163308 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Gasoline (Non-Ethanol) |
| Unintentional Release Bbls | 17 |
| Recovered Bbls | 14 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2022-11-14 11:11:00 |
| System Part Involved | Onshore Terminal/tank Farm Equipment And Piping |
| On Off Shore | Onshore |
| Status When Identified | Post-Maintenance/repair |
| Communication State Fed Ind | Yes |
| Party Initiated Communication | Operator |
| Initial Responder Com Datetime | 2022-11-14 11:11:00 |
| On Site Datetime | 2022-11-14 11:11:00 |
| Confirmed Discovery Datetime | 2022-11-14 14:05:00 |
| Nrc Rpt Datetime | 2022-11-14 14:43:00 |
| Nrc Rpt Num | 1352552 NRC Report How to search |
| Additional Nrc Report Numbers | 1352700 |
| Ignite Ind | No |
| Notify Qualified Indiv Ind | Yes |
| Qualified Indiv Notif Datetime | 2022-11-14 11:15:00 |
| Oil Spill Removal Org Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Pasadena Station |
| Segment Name | Tank #2177 Fill Line |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 77503 |
| Onshore City Name | Pasadena |
| Onshore County Name | Harris |
| Designated Location | Milepost |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Underground |
| Incident Area Subtype | Exposed Due To Excavation |
| Depth Of Cover | 48 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Valve |
| Valve Type | Auxiliary Or Other Valve |
| Installation Year | 2022 |
| Manufactured Year | Unknown |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Connection Failure |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| High Pop Ind | Yes |
| High Pop Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 1870 |
| Est Cost Prop Damage | 65 |
| Est Cost Emergency | 15000 |
| Est Cost Environmental | 18000 |
| Est Cost Other | 0 |
| Prpty | 34935 |
| Num Persons Hosp Not Ovnght | 0 |
| Num Injured Treated By Emt | 0 |
| Num Resident Building Affctd | 0 |
| Num Business Building Affctd | 0 |
| Accident Psig | 1 |
| Mop Psig | 125 |
| Mop Cfr Section | Component Design Pressure �195.406(A)(2) View CFR 49 §192 |
| Maop Established Date | 1975-01-01 00:00:00 |
| Maop Reversal Flow Ind | Bi-Directional |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | < 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Control room actions were not a contributing factor to the release. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Incorrect Operation |
| Cause Details | Equipment Not Installed Properly |
| Operation Type | Equipment Not Installed Properly |
| Related Inadequate Proc Ind | Yes |
| Category Type | Other Maintenance |
| Operator Qualification Ind | No |
| Eqf Non Threaded Ind | Yes |
| Preparer Name | R***** P S********** |
| Preparer Title | Pipeline Safety Advisor |
| Preparer Email | R*******************@e*********.com |
| Preparer Telephone | 618-267-9641 |
| Prepared Date | 2023-01-06 00:00:00 |
| Local Contact Name | R***** P S********** |
| Local Contact Email | R*******************@e*********.com |
| Local Contact Telephone | 618-267-9641 |
| Authorizer Name | T****** H* B***** |
| Authorizer Telephone | 713-819-9504 |
| Authorizer Title | Regulatory Compliance Supervisor |
| Authorizer Email | T***************@e*********.com |
| Narrative | Incident description: tank 2177 was being commissioned after repairs. The suction fill line (tank leg) is a 40" line with a 40" shell valve. The shell valve was removed to air gap the tank to allow for safe confined space work. After repairs were completed, the shell valve was reinstalled. Commissioning commenced on 11/14 at 10:44 a.M. Empco llc personnel and a contractor crew were staged at the tank valve along with containment tub under the valve to capture any potential drips. At 11:11 a.M., 27 minutes into the commissioning personnel noticed a drip at the bottom of the flange. Empco llc. Immediately instructed operations to shut down the delivery. Within one minute of the drip starting, gasoline began to release from the bottom of the flange into the containment tub. (4 o'clock to 8 o'clock position bottom of the flange) at 11:12 a.M. Operations manually closed the delivery valve. At that same time empco drove to the manifold to open a 6" water drain valve to remove all product from tank leg. Delivery valve was fully closed around 11:15 a.M. At approximately 11:46 product stopped leaking from flange. Root cause: adhesive was utilized to maintain gasket alignment but due to the tight spacing, the gar-loc gasket slipped out of alignment on the top of the flange during installation of the 40" valve. This caused the release of product from the top of the flange. Immediate corrective actions were taken to isolate and drain down the tank line. The root cause of this incident was that the installation technician did not use a self-centering gasket. Prevention of re-occurrence: below are the actions empco has taken to prevent the incident from happening again: -the bolt up procedure for this valve was updated to utilize a self-centering gasket. -gar-loc gasket maker will provide additional training to assist with self-centering gasket options for tight spaces. Updates to the initial report: -updated the time accident criteria was met -updated the time the qi was notified -updated the root cause of the incident -updated the costs for emergency response and environmental remediation -updated the narrative |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA