Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2022-11-15 — TX
Operator
Phillips 66 Pipeline Llc
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$105,038
Incident datetime
2022-11-15 07:20
Report number
Location
TX
Narrative
Phillips 66 employee arrived on site to buffalo station along the glacier pipeline system and discovered crude oil on the ground within the manifold area for the station. Employee notified the p66 control center in bartlesville ok. And had the glacier pipeline system shutdown and isolated with closure of valves into and out of the station. Employee made internal notifications, this initiated notifications to external stakeholders. Employee initiated phillips 66 response plan and cleanup process. Supplemental report - 2-13-23 - (updated current costs of spend and failure of prv) awaiting final cleanup and repair costs for final report. Pressure relief valve (prv) failure- the valve that failed is a balanced bellows seal style prv. This style prv requires a vent on the bonnet to prevent atmospheric pressure to build up inside the bonnet and bellows for the prv's proper functionality. Moisture from the environment (rain/snow) entered into the bonnet & bellows seal, the moisture froze causing the bellows seal to expand and distort inside the prv creating the failure of the bellows seal. Upon the bellows seal failing in the valve, crude oil entered the bonnet of the valve and then exited through the open bonnet vent to atmosphere. The prv is being replaced with a conventional prv valve (non bellows style requiring a vent) via the phillips 66 moc process. 8-10-2023 final costs for release updated on part d- final report update final 8/28/2023
Detailed record list
Report Received Date
2022-12-09 00:00:00
Iyear
2022
Report Number
20220278
Supplemental Number
38461
Report Type
Supplemental Final
Operator Id
31684
Name
Phillips 66 Pipeline Llc
Operator Street Address
2331 Citywest Blvd
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77042
Local Datetime
2022-11-15 07:20:00
Time Zone
Mountain
Daylight Savings Ind
No
Location Latitude
46.812296
Location Longitude
-109.765009
Commodity Released Type
Crude Oil
Unintentional Release Bbls
5.7
Recovered Bbls
5.7
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2022-11-15 07:20:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2022-11-15 07:21:00
Restart Datetime
2022-11-16 12:30:00
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Initial Responder Com Datetime
2022-11-15 08:11:00
On Site Datetime
2022-11-15 07:30:00
Confirmed Discovery Datetime
2022-11-15 07:20:00
Nrc Rpt Datetime
2022-11-15 08:26:00
Nrc Rpt Num
1352606
Additional Nrc Report Numbers
1352708
Ignite Ind
No
Notify Qualified Indiv Ind
Yes
Qualified Indiv Notif Datetime
2022-11-15 07:15:00
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Glacier Pipeline System - Buffalo Station
Segment Name
Gl-09
Onshore State Abbreviation
Mt
Onshore Postal Code
59418
Onshore City Name
Not Within A Municipality
Onshore County Name
Fergus
Designated Location
Milepost
Designated Name
189.5
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Relief Line And Relief Equipment
Installation Year
2019
Manufactured Year
2019
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
600
Est Cost Prop Damage
105038
Est Cost Emergency
32128
Est Cost Environmental
0
Est Cost Other
0
Est Cost Other Details
Final Costs For Emergency Response, Property Damage And Repairs. 8-10-2023
Prpty
137766
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
100
Mop Psig
275
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
2019-12-02 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Controller operations did not contribute to this incident.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Malfunction Of Control/relief Equipment
Eq Failure Type
Malfunction Of Control/relief Equipment
Relief Valve Ind
Yes
Additional Thermal Ind
Yes
Nf Temperature Ind
Yes
Eqf Equipment Body Ind
Yes
Preparer Name
M****** K****
Preparer Title
Dot Coordinator
Preparer Email
M**************@p**.com
Preparer Telephone
406-441-4749
Prepared Date
2023-08-28 00:00:00
Local Contact Name
M****** K****
Local Contact Email
M**************@p**.com
Local Contact Telephone
406-441-4749
Authorizer Name
T*** F****
Authorizer Telephone
832-765-1632
Authorizer Title
Director Of Dot Operations Compliance
Authorizer Email
T***********@p**.com
Narrative
Phillips 66 employee arrived on site to buffalo station along the glacier pipeline system and discovered crude oil on the ground within the manifold area for the station. Employee notified the p66 control center in bartlesville ok. And had the glacier pipeline system shutdown and isolated with closure of valves into and out of the station. Employee made internal notifications, this initiated notifications to external stakeholders. Employee initiated phillips 66 response plan and cleanup process. Supplemental report - 2-13-23 - (updated current costs of spend and failure of prv) awaiting final cleanup and repair costs for final report. Pressure relief valve (prv) failure- the valve that failed is a balanced bellows seal style prv. This style prv requires a vent on the bonnet to prevent atmospheric pressure to build up inside the bonnet and bellows for the prv's proper functionality. Moisture from the environment (rain/snow) entered into the bonnet & bellows seal, the moisture froze causing the bellows seal to expand and distort inside the prv creating the failure of the bellows seal. Upon the bellows seal failing in the valve, crude oil entered the bonnet of the valve and then exited through the open bonnet vent to atmosphere. The prv is being replaced with a conventional prv valve (non bellows style requiring a vent) via the phillips 66 moc process. 8-10-2023 final costs for release updated on part d- final report update final 8/28/2023
| Report Received Date | 2022-12-09 00:00:00 |
|---|---|
| Iyear | 2022 |
| Report Number | 20220278 |
| Supplemental Number | 38461 |
| Report Type | Supplemental Final |
| Operator Id | 31684 PHMSA Enforcement |
| Name | Phillips 66 Pipeline Llc |
| Operator Street Address | 2331 Citywest Blvd |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77042 |
| Local Datetime | 2022-11-15 07:20:00 |
| Time Zone | Mountain |
| Daylight Savings Ind | No |
| Location Latitude | 46.812296 Google Maps OpenStreetMap |
| Location Longitude | -109.765009 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 5.7 |
| Recovered Bbls | 5.7 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2022-11-15 07:20:00 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2022-11-15 07:21:00 |
| Restart Datetime | 2022-11-16 12:30:00 |
| Communication State Fed Ind | Yes |
| Party Initiated Communication | Operator |
| Initial Responder Com Datetime | 2022-11-15 08:11:00 |
| On Site Datetime | 2022-11-15 07:30:00 |
| Confirmed Discovery Datetime | 2022-11-15 07:20:00 |
| Nrc Rpt Datetime | 2022-11-15 08:26:00 |
| Nrc Rpt Num | 1352606 NRC Report How to search |
| Additional Nrc Report Numbers | 1352708 |
| Ignite Ind | No |
| Notify Qualified Indiv Ind | Yes |
| Qualified Indiv Notif Datetime | 2022-11-15 07:15:00 |
| Oil Spill Removal Org Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Glacier Pipeline System - Buffalo Station |
| Segment Name | Gl-09 |
| Onshore State Abbreviation | Mt |
| Onshore Postal Code | 59418 |
| Onshore City Name | Not Within A Municipality |
| Onshore County Name | Fergus |
| Designated Location | Milepost |
| Designated Name | 189.5 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Relief Line And Relief Equipment |
| Installation Year | 2019 |
| Manufactured Year | 2019 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Seal Or Packing |
| Wildlife Impact Ind | No |
| Soil Contamination | No |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 600 |
| Est Cost Prop Damage | 105038 |
| Est Cost Emergency | 32128 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Est Cost Other Details | Final Costs For Emergency Response, Property Damage And Repairs. 8-10-2023 |
| Prpty | 137766 |
| Num Persons Hosp Not Ovnght | 0 |
| Num Injured Treated By Emt | 0 |
| Num Resident Building Affctd | 0 |
| Num Business Building Affctd | 0 |
| Accident Psig | 100 |
| Mop Psig | 275 |
| Mop Cfr Section | Component Design Pressure �195.406(A)(2) View CFR 49 §192 |
| Maop Established Date | 2019-12-02 00:00:00 |
| Maop Reversal Flow Ind | No |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Controller operations did not contribute to this incident. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Malfunction Of Control/relief Equipment |
| Eq Failure Type | Malfunction Of Control/relief Equipment |
| Relief Valve Ind | Yes |
| Additional Thermal Ind | Yes |
| Nf Temperature Ind | Yes |
| Eqf Equipment Body Ind | Yes |
| Preparer Name | M****** K**** |
| Preparer Title | Dot Coordinator |
| Preparer Email | M**************@p**.com |
| Preparer Telephone | 406-441-4749 |
| Prepared Date | 2023-08-28 00:00:00 |
| Local Contact Name | M****** K**** |
| Local Contact Email | M**************@p**.com |
| Local Contact Telephone | 406-441-4749 |
| Authorizer Name | T*** F**** |
| Authorizer Telephone | 832-765-1632 |
| Authorizer Title | Director Of Dot Operations Compliance |
| Authorizer Email | T***********@p**.com |
| Narrative | Phillips 66 employee arrived on site to buffalo station along the glacier pipeline system and discovered crude oil on the ground within the manifold area for the station. Employee notified the p66 control center in bartlesville ok. And had the glacier pipeline system shutdown and isolated with closure of valves into and out of the station. Employee made internal notifications, this initiated notifications to external stakeholders. Employee initiated phillips 66 response plan and cleanup process. Supplemental report - 2-13-23 - (updated current costs of spend and failure of prv) awaiting final cleanup and repair costs for final report. Pressure relief valve (prv) failure- the valve that failed is a balanced bellows seal style prv. This style prv requires a vent on the bonnet to prevent atmospheric pressure to build up inside the bonnet and bellows for the prv's proper functionality. Moisture from the environment (rain/snow) entered into the bonnet & bellows seal, the moisture froze causing the bellows seal to expand and distort inside the prv creating the failure of the bellows seal. Upon the bellows seal failing in the valve, crude oil entered the bonnet of the valve and then exited through the open bonnet vent to atmosphere. The prv is being replaced with a conventional prv valve (non bellows style requiring a vent) via the phillips 66 moc process. 8-10-2023 final costs for release updated on part d- final report update final 8/28/2023 |