HL incident on 2022-11-08 — TX

Operator
Echo Canyon Pipeline, Llc
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$20,000
Incident datetime
2022-11-08 12:05
Report number
Location
TX
Narrative
At 12:05pm cst, the third party aerial patrol contracted by echo canyon called local operations to notify them of a release of crude oil. Operations notified the control center at 12:25pm and requested a shut in of the system upstream of the release site. Downstream manual valves were closed at 12:50 pm cst. Operations arrived at location at 12:59 pm and confirmed leak. A temporary clamp was applied to stop the release form further soil contamination. The pipeline was evacuated and remains shut in at this time. At first visual inspection, the leak appears to be caused by internal corrosion. A pipeline coupon was sent to the following for analysis: stress engineering services 13800 westfair east dr. Houston, tx 77041 based on the results of the lab analysis and rate of corrosion, echo canyon will be abandoning (removing) this segment of the pipeline. Removal of this segment will complete removal of the entire 12-inch pipeline iwhich has exhibited this mode of internal corrosion.
Detailed record list
Report Received Date
2022-12-08 00:00:00
Iyear
2022
Report Number
20220276
Supplemental Number
37937
Report Type
Supplemental Final
Operator Id
Name
Echo Canyon Pipeline, Llc
Operator Street Address
P.o. Box 73
Operator City Name
Barnhart
Operator State Abbreviation
TX
Operator Postal Code
76930
Local Datetime
2022-11-08 12:37:00
Time Zone
Central
Daylight Savings Ind
No
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
75
Recovered Bbls
70
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Air Patrol
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2022-11-08 12:05:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2022-11-08 12:25:00
Still Shutdown Ind
Yes
Communication State Fed Ind
No
On Site Datetime
2022-11-08 12:59:00
Confirmed Discovery Datetime
2022-11-08 12:59:00
Nrc Rpt Datetime
2022-11-08 13:31:00
Nrc Rpt Num
Additional Nrc Report Numbers
1352215
Ignite Ind
No
Upstream Action Taken
Operational Control
Upstream Oprtnl Cntrl Detail
Initial Action Was To Shut Down Pumps Upstream Of The Location Followed By Upstream Valve Closure
Downstream Action Taken
Valve Closure
Downstream Vlv Close Datetime
2022-11-08 12:50:00
Downstream Valve Type Ind
Manual
Notify Qualified Indiv Ind
Yes
Qualified Indiv Notif Datetime
2022-11-08 13:00:00
Oil Spill Removal Org Ind
Yes
Osro Activated Datetime
2022-11-08 13:00:00
Osro Arrived On Site Dt
11/8/2022 15:00
Num Pub Evacuated
0
Pipe Fac Name
Echo Canyon Pipeline
Segment Name
Junction To Cpf1 Tie-In Ns 12"
Onshore State Abbreviation
Tx
Onshore Postal Code
76930
Onshore City Name
Not Within A Municipality
Onshore County Name
Crockett
Designated Location
Milepost
Designated Name
10.02
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
48
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
12.75
Pipe Wall Thickness
0.25
Pipe Smys
52000
Pipe Specification
X52 Api 5l - 44th Ed - Iso
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Paragon
Pipe Coating Type
Fusion Bonded Epoxy(Fbe)
Coating Applied Ind
No
Installation Year
2013
Manufactured Year
2012
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
1000
Est Cost Gas Released
6884
Est Cost Prop Damage
20000
Est Cost Emergency
20000
Est Cost Environmental
175000
Est Cost Other
0
Prpty
222884
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
80
Mop Psig
1440
Mop Cfr Section
Subpart E Pressure Test �195.406(A)(3)
Maop Established Date
2013-02-28 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
Yes
Exceed Restriction Ind
No
Phmsa Restriction Ind
Not Mandated
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Not Cut Open
Int Microbiological Ind
Yes
Int Field Exam Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
Yes
Corrosion Lining
No
Cleaning Dewatering
Yes
Corrosion Coupons
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Axial Recent Year
2020
Axial Rcnt Propul Method
Free Swimming
Axial Rcnt Attuned Detect
Metal Loss
Axial Rcnt Atnd Dtct Metal
High Resolution
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
K****** C***
Preparer Title
Director Land And Compliance
Preparer Email
K****@m***********.com
Preparer Telephone
325-725-6582
Prepared Date
2023-04-13 00:00:00
Local Contact Name
L*** H*****
Local Contact Email
L******@m***********
Local Contact Telephone
(801) 556-9196
Authorizer Name
K****** C***
Authorizer Telephone
3257256582
Authorizer Title
Director Land And Compliance
Authorizer Email
K****@m***********.com
Narrative
At 12:05pm cst, the third party aerial patrol contracted by echo canyon called local operations to notify them of a release of crude oil. Operations notified the control center at 12:25pm and requested a shut in of the system upstream of the release site. Downstream manual valves were closed at 12:50 pm cst. Operations arrived at location at 12:59 pm and confirmed leak. A temporary clamp was applied to stop the release form further soil contamination. The pipeline was evacuated and remains shut in at this time. At first visual inspection, the leak appears to be caused by internal corrosion. A pipeline coupon was sent to the following for analysis: stress engineering services 13800 westfair east dr. Houston, tx 77041 based on the results of the lab analysis and rate of corrosion, echo canyon will be abandoning (removing) this segment of the pipeline. Removal of this segment will complete removal of the entire 12-inch pipeline iwhich has exhibited this mode of internal corrosion.
Report Received Date 2022-12-08 00:00:00
Iyear 2022
Report Number 20220276
Supplemental Number 37937
Report Type Supplemental Final
Operator Id 40138 PHMSA Enforcement
Name Echo Canyon Pipeline, Llc
Operator Street Address P.o. Box 73
Operator City Name Barnhart
Operator State Abbreviation TX
Operator Postal Code 76930
Local Datetime 2022-11-08 12:37:00
Time Zone Central
Daylight Savings Ind No
Location Latitude 31.01938 Google Maps OpenStreetMap
Location Longitude -101.28707 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 75
Recovered Bbls 70
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Air Patrol
Operator Type Contractor Working For The Operator
Incident Identified Datetime 2022-11-08 12:05:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind Yes
Shutdown Datetime 2022-11-08 12:25:00
Still Shutdown Ind Yes
Communication State Fed Ind No
On Site Datetime 2022-11-08 12:59:00
Confirmed Discovery Datetime 2022-11-08 12:59:00
Nrc Rpt Datetime 2022-11-08 13:31:00
Nrc Rpt Num 1352050 NRC Report How to search
Additional Nrc Report Numbers 1352215
Ignite Ind No
Upstream Action Taken Operational Control
Upstream Oprtnl Cntrl Detail Initial Action Was To Shut Down Pumps Upstream Of The Location Followed By Upstream Valve Closure
Downstream Action Taken Valve Closure
Downstream Vlv Close Datetime 2022-11-08 12:50:00
Downstream Valve Type Ind Manual
Notify Qualified Indiv Ind Yes
Qualified Indiv Notif Datetime 2022-11-08 13:00:00
Oil Spill Removal Org Ind Yes
Osro Activated Datetime 2022-11-08 13:00:00
Osro Arrived On Site Dt 11/8/2022 15:00
Num Pub Evacuated 0
Pipe Fac Name Echo Canyon Pipeline
Segment Name Junction To Cpf1 Tie-In Ns 12"
Onshore State Abbreviation Tx
Onshore Postal Code 76930
Onshore City Name Not Within A Municipality
Onshore County Name Crockett
Designated Location Milepost
Designated Name 10.02
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 48
Crossing No
Pipe Facility Type Intrastate
Item Involved Pipe
Pipe Type Pipe Body
Puddle Weld Ind No
Pipe Diameter 12.75
Pipe Wall Thickness 0.25
Pipe Smys 52000
Pipe Specification X52 Api 5l - 44th Ed - Iso
Pipe Seam Type Erw - High Frequency
Pipe Manufacturer Paragon
Pipe Coating Type Fusion Bonded Epoxy(Fbe)
Coating Applied Ind No
Installation Year 2013
Manufactured Year 2012
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 1000
Est Cost Gas Released 6884
Est Cost Prop Damage 20000
Est Cost Emergency 20000
Est Cost Environmental 175000
Est Cost Other 0
Prpty 222884
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 80
Mop Psig 1440
Mop Cfr Section Subpart E Pressure Test �195.406(A)(3) View CFR 49 §192
Maop Established Date 2013-02-28 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind Yes
Exceed Restriction Ind No
Phmsa Restriction Ind Not Mandated
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind Yes
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details Internal Corrosion
Internal External Internal Corrosion
Int Visual Exam Results Not Cut Open
Int Microbiological Ind Yes
Int Field Exam Basis Ind Yes
Int Low Point Pipe Loc Ind Yes
Corrosion Inhibitors Yes
Corrosion Lining No
Cleaning Dewatering Yes
Corrosion Coupons Yes
Collected Data Ind Yes
Axial Magnetic Flx Lkg Ind Yes
Axial Recent Year 2020
Axial Rcnt Propul Method Free Swimming
Axial Rcnt Attuned Detect Metal Loss
Axial Rcnt Atnd Dtct Metal High Resolution
Has Hydrtst Conduc Before Ind No
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name K****** C***
Preparer Title Director Land And Compliance
Preparer Email K****@m***********.com
Preparer Telephone 325-725-6582
Prepared Date 2023-04-13 00:00:00
Local Contact Name L*** H*****
Local Contact Email L******@m***********
Local Contact Telephone (801) 556-9196
Authorizer Name K****** C***
Authorizer Telephone 3257256582
Authorizer Title Director Land And Compliance
Authorizer Email K****@m***********.com
Narrative At 12:05pm cst, the third party aerial patrol contracted by echo canyon called local operations to notify them of a release of crude oil. Operations notified the control center at 12:25pm and requested a shut in of the system upstream of the release site. Downstream manual valves were closed at 12:50 pm cst. Operations arrived at location at 12:59 pm and confirmed leak. A temporary clamp was applied to stop the release form further soil contamination. The pipeline was evacuated and remains shut in at this time. At first visual inspection, the leak appears to be caused by internal corrosion. A pipeline coupon was sent to the following for analysis: stress engineering services 13800 westfair east dr. Houston, tx 77041 based on the results of the lab analysis and rate of corrosion, echo canyon will be abandoning (removing) this segment of the pipeline. Removal of this segment will complete removal of the entire 12-inch pipeline iwhich has exhibited this mode of internal corrosion.

All rights reserved. Copyright © by ClearPHMSA