Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2022-11-08 — TX
Operator
Echo Canyon Pipeline, Llc
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$20,000
Incident datetime
2022-11-08 12:05
Report number
Location
TX
Narrative
At 12:05pm cst, the third party aerial patrol contracted by echo canyon called local operations to notify them of a release of crude oil. Operations notified the control center at 12:25pm and requested a shut in of the system upstream of the release site. Downstream manual valves were closed at 12:50 pm cst. Operations arrived at location at 12:59 pm and confirmed leak. A temporary clamp was applied to stop the release form further soil contamination. The pipeline was evacuated and remains shut in at this time. At first visual inspection, the leak appears to be caused by internal corrosion. A pipeline coupon was sent to the following for analysis: stress engineering services 13800 westfair east dr. Houston, tx 77041 based on the results of the lab analysis and rate of corrosion, echo canyon will be abandoning (removing) this segment of the pipeline. Removal of this segment will complete removal of the entire 12-inch pipeline iwhich has exhibited this mode of internal corrosion.
Detailed record list
Report Received Date
2022-12-08 00:00:00
Iyear
2022
Report Number
20220276
Supplemental Number
37937
Report Type
Supplemental Final
Operator Id
40138
Name
Echo Canyon Pipeline, Llc
Operator Street Address
P.o. Box 73
Operator City Name
Barnhart
Operator State Abbreviation
TX
Operator Postal Code
76930
Local Datetime
2022-11-08 12:37:00
Time Zone
Central
Daylight Savings Ind
No
Location Latitude
31.01938
Location Longitude
-101.28707
Commodity Released Type
Crude Oil
Unintentional Release Bbls
75
Recovered Bbls
70
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Air Patrol
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2022-11-08 12:05:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2022-11-08 12:25:00
Still Shutdown Ind
Yes
Communication State Fed Ind
No
On Site Datetime
2022-11-08 12:59:00
Confirmed Discovery Datetime
2022-11-08 12:59:00
Nrc Rpt Datetime
2022-11-08 13:31:00
Nrc Rpt Num
1352050
Additional Nrc Report Numbers
1352215
Ignite Ind
No
Upstream Action Taken
Operational Control
Upstream Oprtnl Cntrl Detail
Initial Action Was To Shut Down Pumps Upstream Of The Location Followed By Upstream Valve Closure
Downstream Action Taken
Valve Closure
Downstream Vlv Close Datetime
2022-11-08 12:50:00
Downstream Valve Type Ind
Manual
Notify Qualified Indiv Ind
Yes
Qualified Indiv Notif Datetime
2022-11-08 13:00:00
Oil Spill Removal Org Ind
Yes
Osro Activated Datetime
2022-11-08 13:00:00
Osro Arrived On Site Dt
11/8/2022 15:00
Num Pub Evacuated
0
Pipe Fac Name
Echo Canyon Pipeline
Segment Name
Junction To Cpf1 Tie-In Ns 12"
Onshore State Abbreviation
Tx
Onshore Postal Code
76930
Onshore City Name
Not Within A Municipality
Onshore County Name
Crockett
Designated Location
Milepost
Designated Name
10.02
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
48
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
12.75
Pipe Wall Thickness
0.25
Pipe Smys
52000
Pipe Specification
X52 Api 5l - 44th Ed - Iso
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Paragon
Pipe Coating Type
Fusion Bonded Epoxy(Fbe)
Coating Applied Ind
No
Installation Year
2013
Manufactured Year
2012
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
1000
Est Cost Gas Released
6884
Est Cost Prop Damage
20000
Est Cost Emergency
20000
Est Cost Environmental
175000
Est Cost Other
0
Prpty
222884
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
80
Mop Psig
1440
Mop Cfr Section
Subpart E Pressure Test �195.406(A)(3)
Maop Established Date
2013-02-28 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
Yes
Exceed Restriction Ind
No
Phmsa Restriction Ind
Not Mandated
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Not Cut Open
Int Microbiological Ind
Yes
Int Field Exam Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
Yes
Corrosion Lining
No
Cleaning Dewatering
Yes
Corrosion Coupons
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Axial Recent Year
2020
Axial Rcnt Propul Method
Free Swimming
Axial Rcnt Attuned Detect
Metal Loss
Axial Rcnt Atnd Dtct Metal
High Resolution
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
K****** C***
Preparer Title
Director Land And Compliance
Preparer Email
K****@m***********.com
Preparer Telephone
325-725-6582
Prepared Date
2023-04-13 00:00:00
Local Contact Name
L*** H*****
Local Contact Email
L******@m***********
Local Contact Telephone
(801) 556-9196
Authorizer Name
K****** C***
Authorizer Telephone
3257256582
Authorizer Title
Director Land And Compliance
Authorizer Email
K****@m***********.com
Narrative
At 12:05pm cst, the third party aerial patrol contracted by echo canyon called local operations to notify them of a release of crude oil. Operations notified the control center at 12:25pm and requested a shut in of the system upstream of the release site. Downstream manual valves were closed at 12:50 pm cst. Operations arrived at location at 12:59 pm and confirmed leak. A temporary clamp was applied to stop the release form further soil contamination. The pipeline was evacuated and remains shut in at this time. At first visual inspection, the leak appears to be caused by internal corrosion. A pipeline coupon was sent to the following for analysis: stress engineering services 13800 westfair east dr. Houston, tx 77041 based on the results of the lab analysis and rate of corrosion, echo canyon will be abandoning (removing) this segment of the pipeline. Removal of this segment will complete removal of the entire 12-inch pipeline iwhich has exhibited this mode of internal corrosion.
| Report Received Date | 2022-12-08 00:00:00 |
|---|---|
| Iyear | 2022 |
| Report Number | 20220276 |
| Supplemental Number | 37937 |
| Report Type | Supplemental Final |
| Operator Id | 40138 PHMSA Enforcement |
| Name | Echo Canyon Pipeline, Llc |
| Operator Street Address | P.o. Box 73 |
| Operator City Name | Barnhart |
| Operator State Abbreviation | TX |
| Operator Postal Code | 76930 |
| Local Datetime | 2022-11-08 12:37:00 |
| Time Zone | Central |
| Daylight Savings Ind | No |
| Location Latitude | 31.01938 Google Maps OpenStreetMap |
| Location Longitude | -101.28707 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 75 |
| Recovered Bbls | 70 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Air Patrol |
| Operator Type | Contractor Working For The Operator |
| Incident Identified Datetime | 2022-11-08 12:05:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2022-11-08 12:25:00 |
| Still Shutdown Ind | Yes |
| Communication State Fed Ind | No |
| On Site Datetime | 2022-11-08 12:59:00 |
| Confirmed Discovery Datetime | 2022-11-08 12:59:00 |
| Nrc Rpt Datetime | 2022-11-08 13:31:00 |
| Nrc Rpt Num | 1352050 NRC Report How to search |
| Additional Nrc Report Numbers | 1352215 |
| Ignite Ind | No |
| Upstream Action Taken | Operational Control |
| Upstream Oprtnl Cntrl Detail | Initial Action Was To Shut Down Pumps Upstream Of The Location Followed By Upstream Valve Closure |
| Downstream Action Taken | Valve Closure |
| Downstream Vlv Close Datetime | 2022-11-08 12:50:00 |
| Downstream Valve Type Ind | Manual |
| Notify Qualified Indiv Ind | Yes |
| Qualified Indiv Notif Datetime | 2022-11-08 13:00:00 |
| Oil Spill Removal Org Ind | Yes |
| Osro Activated Datetime | 2022-11-08 13:00:00 |
| Osro Arrived On Site Dt | 11/8/2022 15:00 |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Echo Canyon Pipeline |
| Segment Name | Junction To Cpf1 Tie-In Ns 12" |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 76930 |
| Onshore City Name | Not Within A Municipality |
| Onshore County Name | Crockett |
| Designated Location | Milepost |
| Designated Name | 10.02 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 48 |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Puddle Weld Ind | No |
| Pipe Diameter | 12.75 |
| Pipe Wall Thickness | 0.25 |
| Pipe Smys | 52000 |
| Pipe Specification | X52 Api 5l - 44th Ed - Iso |
| Pipe Seam Type | Erw - High Frequency |
| Pipe Manufacturer | Paragon |
| Pipe Coating Type | Fusion Bonded Epoxy(Fbe) |
| Coating Applied Ind | No |
| Installation Year | 2013 |
| Manufactured Year | 2012 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Pinhole |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 1000 |
| Est Cost Gas Released | 6884 |
| Est Cost Prop Damage | 20000 |
| Est Cost Emergency | 20000 |
| Est Cost Environmental | 175000 |
| Est Cost Other | 0 |
| Prpty | 222884 |
| Num Persons Hosp Not Ovnght | 0 |
| Num Injured Treated By Emt | 0 |
| Num Resident Building Affctd | 0 |
| Num Business Building Affctd | 0 |
| Accident Psig | 80 |
| Mop Psig | 1440 |
| Mop Cfr Section | Subpart E Pressure Test �195.406(A)(3) View CFR 49 §192 |
| Maop Established Date | 2013-02-28 00:00:00 |
| Maop Reversal Flow Ind | No |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | Yes |
| Exceed Restriction Ind | No |
| Phmsa Restriction Ind | Not Mandated |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest Schedule Ind | Yes |
| Invest No Control Room Ind | Yes |
| Invest No Controller Ind | Yes |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | Internal Corrosion |
| Internal External | Internal Corrosion |
| Int Visual Exam Results | Not Cut Open |
| Int Microbiological Ind | Yes |
| Int Field Exam Basis Ind | Yes |
| Int Low Point Pipe Loc Ind | Yes |
| Corrosion Inhibitors | Yes |
| Corrosion Lining | No |
| Cleaning Dewatering | Yes |
| Corrosion Coupons | Yes |
| Collected Data Ind | Yes |
| Axial Magnetic Flx Lkg Ind | Yes |
| Axial Recent Year | 2020 |
| Axial Rcnt Propul Method | Free Swimming |
| Axial Rcnt Attuned Detect | Metal Loss |
| Axial Rcnt Atnd Dtct Metal | High Resolution |
| Has Hydrtst Conduc Before Ind | No |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | K****** C*** |
| Preparer Title | Director Land And Compliance |
| Preparer Email | K****@m***********.com |
| Preparer Telephone | 325-725-6582 |
| Prepared Date | 2023-04-13 00:00:00 |
| Local Contact Name | L*** H***** |
| Local Contact Email | L******@m*********** |
| Local Contact Telephone | (801) 556-9196 |
| Authorizer Name | K****** C*** |
| Authorizer Telephone | 3257256582 |
| Authorizer Title | Director Land And Compliance |
| Authorizer Email | K****@m***********.com |
| Narrative | At 12:05pm cst, the third party aerial patrol contracted by echo canyon called local operations to notify them of a release of crude oil. Operations notified the control center at 12:25pm and requested a shut in of the system upstream of the release site. Downstream manual valves were closed at 12:50 pm cst. Operations arrived at location at 12:59 pm and confirmed leak. A temporary clamp was applied to stop the release form further soil contamination. The pipeline was evacuated and remains shut in at this time. At first visual inspection, the leak appears to be caused by internal corrosion. A pipeline coupon was sent to the following for analysis: stress engineering services 13800 westfair east dr. Houston, tx 77041 based on the results of the lab analysis and rate of corrosion, echo canyon will be abandoning (removing) this segment of the pipeline. Removal of this segment will complete removal of the entire 12-inch pipeline iwhich has exhibited this mode of internal corrosion. |