HL incident on 2022-11-14 — CO
Operator
Fundare Resources Operating Company, Llc
Cause
Natural Force Damage
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$5,000
Incident datetime
2022-11-14 12:38
Report number
Location
CO
Narrative
On november 14, 2022 a three-inch valve froze and split at the seat causing the valve to fail. The leak was discovered during routine maintenance. Oil was released out of the failed valve onto the location. All the released product was contained on the location and there was no threat to surface water, groundwater, or wildlife. The total amount released was 28.19bbls (1,183.98 gallons) and the total amount recovered was 25.5bbl (1,071 gallons). Clean-up and excavation commenced immediately, and soil samples have been collected. The valve was replaced, and the site was returned to service at 16:15. The 48 hour notice was not submitted as rule 195.52 did not apply to this incident. The notice that was submitted was submitted per the previous operator's pipeline spill and emergency response plan which is currently being edited. During colder weather events the valves will be checked more frequently for freezing conditions.
Detailed record list
Report Received Date
2022-11-29 00:00:00
Iyear
2022
Report Number
20220264
Supplemental Number
37462
Report Type
Supplemental Final
Operator Id
40295
Name
Fundare Resources Operating Company, Llc
Operator Street Address
5251 Dtc Pkwy Ste #950
Operator City Name
Greenwood Village
Operator State Abbreviation
CO
Operator Postal Code
80111
Local Datetime
2022-11-14 10:00:00
Time Zone
Mountain
Daylight Savings Ind
Yes
Location Latitude
40.78112
Location Longitude
-103.9448
Commodity Released Type
Crude Oil
Unintentional Release Bbls
28.19
Recovered Bbls
25.5
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2022-11-14 12:38:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2022-11-14 12:42:00
Restart Datetime
2022-11-14 16:15:00
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Initial Responder Com Datetime
2022-11-15 08:00:00
On Site Datetime
2022-11-14 12:55:00
Confirmed Discovery Datetime
2022-11-14 12:38:00
Nrc Rpt Datetime
2022-11-21 13:15:00
Nrc Rpt Num
1353138
Ignite Ind
No
Notify Qualified Indiv Ind
Yes
Qualified Indiv Notif Datetime
2022-11-14 06:33:00
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Redtail Gas Gathering System
Segment Name
Cr 110 East
Onshore State Abbreviation
Co
Onshore Postal Code
80742
Onshore City Name
New Raymer
Onshore County Name
Weld
Designated Location
Milepost
Designated Name
10.5
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Valve
Valve Type
Auxiliary Or Other Valve
Installation Year
2015
Manufactured Year
2014
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Connection Failure
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
245
Est Cost Prop Damage
5000
Est Cost Emergency
0
Est Cost Environmental
20000
Est Cost Other
0
Prpty
25245
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
125
Mop Psig
375
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
2015-03-08 00:00:00
Maop Reversal Flow Ind
Bi-Directional
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
< 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The cause of the release was determined to be due to a frozen valve upon discovery of the release.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Natural Force Damage
Cause Details
Temperature
Natural Force Type
Temperature
Temperature Subtype
Frozen Components
Nf Extreme Weather Ind
No
Preparer Name
S***** S****
Preparer Title
Director Ehsr
Preparer Email
S*****@f***************.com
Preparer Telephone
13039104511
Prepared Date
2022-12-13 00:00:00
Local Contact Name
S***** S****
Local Contact Email
S*****@f***************.com
Local Contact Telephone
13039104511
Authorizer Name
S***** S****
Authorizer Telephone
13039104511
Authorizer Title
Director Ehsr
Authorizer Email
S*****@f***************.com
Narrative
On november 14, 2022 a three-inch valve froze and split at the seat causing the valve to fail. The leak was discovered during routine maintenance. Oil was released out of the failed valve onto the location. All the released product was contained on the location and there was no threat to surface water, groundwater, or wildlife. The total amount released was 28.19bbls (1,183.98 gallons) and the total amount recovered was 25.5bbl (1,071 gallons). Clean-up and excavation commenced immediately, and soil samples have been collected. The valve was replaced, and the site was returned to service at 16:15. The 48 hour notice was not submitted as rule 195.52 did not apply to this incident. The notice that was submitted was submitted per the previous operator's pipeline spill and emergency response plan which is currently being edited. During colder weather events the valves will be checked more frequently for freezing conditions.
| Report Received Date | 2022-11-29 00:00:00 |
|---|---|
| Iyear | 2022 |
| Report Number | 20220264 |
| Supplemental Number | 37462 |
| Report Type | Supplemental Final |
| Operator Id | 40295 PHMSA Enforcement |
| Name | Fundare Resources Operating Company, Llc |
| Operator Street Address | 5251 Dtc Pkwy Ste #950 |
| Operator City Name | Greenwood Village |
| Operator State Abbreviation | CO |
| Operator Postal Code | 80111 |
| Local Datetime | 2022-11-14 10:00:00 |
| Time Zone | Mountain |
| Daylight Savings Ind | Yes |
| Location Latitude | 40.78112 Google Maps OpenStreetMap |
| Location Longitude | -103.9448 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 28.19 |
| Recovered Bbls | 25.5 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Contractor Working For The Operator |
| Incident Identified Datetime | 2022-11-14 12:38:00 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2022-11-14 12:42:00 |
| Restart Datetime | 2022-11-14 16:15:00 |
| Communication State Fed Ind | Yes |
| Party Initiated Communication | Operator |
| Initial Responder Com Datetime | 2022-11-15 08:00:00 |
| On Site Datetime | 2022-11-14 12:55:00 |
| Confirmed Discovery Datetime | 2022-11-14 12:38:00 |
| Nrc Rpt Datetime | 2022-11-21 13:15:00 |
| Nrc Rpt Num | 1353138 NRC Report How to search |
| Ignite Ind | No |
| Notify Qualified Indiv Ind | Yes |
| Qualified Indiv Notif Datetime | 2022-11-14 06:33:00 |
| Oil Spill Removal Org Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Redtail Gas Gathering System |
| Segment Name | Cr 110 East |
| Onshore State Abbreviation | Co |
| Onshore Postal Code | 80742 |
| Onshore City Name | New Raymer |
| Onshore County Name | Weld |
| Designated Location | Milepost |
| Designated Name | 10.5 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Valve |
| Valve Type | Auxiliary Or Other Valve |
| Installation Year | 2015 |
| Manufactured Year | 2014 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Connection Failure |
| Wildlife Impact Ind | No |
| Soil Contamination | No |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 245 |
| Est Cost Prop Damage | 5000 |
| Est Cost Emergency | 0 |
| Est Cost Environmental | 20000 |
| Est Cost Other | 0 |
| Prpty | 25245 |
| Num Persons Hosp Not Ovnght | 0 |
| Num Injured Treated By Emt | 0 |
| Num Resident Building Affctd | 0 |
| Num Business Building Affctd | 0 |
| Accident Psig | 125 |
| Mop Psig | 375 |
| Mop Cfr Section | Component Design Pressure �195.406(A)(2) View CFR 49 §192 |
| Maop Established Date | 2015-03-08 00:00:00 |
| Maop Reversal Flow Ind | Bi-Directional |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | < 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | The cause of the release was determined to be due to a frozen valve upon discovery of the release. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Natural Force Damage |
| Cause Details | Temperature |
| Natural Force Type | Temperature |
| Temperature Subtype | Frozen Components |
| Nf Extreme Weather Ind | No |
| Preparer Name | S***** S**** |
| Preparer Title | Director Ehsr |
| Preparer Email | S*****@f***************.com |
| Preparer Telephone | 13039104511 |
| Prepared Date | 2022-12-13 00:00:00 |
| Local Contact Name | S***** S**** |
| Local Contact Email | S*****@f***************.com |
| Local Contact Telephone | 13039104511 |
| Authorizer Name | S***** S**** |
| Authorizer Telephone | 13039104511 |
| Authorizer Title | Director Ehsr |
| Authorizer Email | S*****@f***************.com |
| Narrative | On november 14, 2022 a three-inch valve froze and split at the seat causing the valve to fail. The leak was discovered during routine maintenance. Oil was released out of the failed valve onto the location. All the released product was contained on the location and there was no threat to surface water, groundwater, or wildlife. The total amount released was 28.19bbls (1,183.98 gallons) and the total amount recovered was 25.5bbl (1,071 gallons). Clean-up and excavation commenced immediately, and soil samples have been collected. The valve was replaced, and the site was returned to service at 16:15. The 48 hour notice was not submitted as rule 195.52 did not apply to this incident. The notice that was submitted was submitted per the previous operator's pipeline spill and emergency response plan which is currently being edited. During colder weather events the valves will be checked more frequently for freezing conditions. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA