HL incident on 2022-10-24 — TX
Operator
Energy Transfer Nederland Terminal Llc
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$23,000
Incident datetime
2022-10-24 09:30
Report number
Location
TX
Narrative
On 10/24/2022 at 09:30, a leak was discovered at the doe manifold. An estimated 2-3 barrels of crude oil was released based on site conditions at initial discovery. A contractor and local operations personnel were summoned to the site to begin cleanup and investigation. On 10/25, the investigation and excavation continued without locating the leak location. On 10/26, a wider area was excavated and an additional released product volume (50 bbls) was identified. Based on the discovery of increased volume of product and required soil remediation it was determined that costs would exceed $50k and the nrc was notified immediately following determination. On 10/27, excavation and cleanup continued. Leak site was identified. Visual examination determined that the release was caused by internal corrosion. A plidco mechanical repair clamp was installed. On 10/28, 48 hr. Nrc notification made. The line was returned to service on 11/1/22.
Detailed record list
Report Received Date
2022-11-22 00:00:00
Iyear
2022
Report Number
20220257
Supplemental Number
37375
Report Type
Supplemental Final
Operator Id
39706
Name
Energy Transfer Nederland Terminal Llc
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2022-10-24 09:30:00
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
29.997547
Location Longitude
-93.993622
Commodity Released Type
Crude Oil
Unintentional Release Bbls
50
Recovered Bbls
50
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2022-10-24 09:30:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2022-10-24 09:30:00
Restart Datetime
2022-11-01 09:00:00
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Initial Responder Com Datetime
2022-10-26 14:39:00
On Site Datetime
2022-10-24 09:30:00
Confirmed Discovery Datetime
2022-10-24 09:30:00
Nrc Rpt Datetime
2022-10-26 14:23:00
Nrc Rpt Num
1350926
Additional Nrc Report Numbers
1351116
Ignite Ind
No
Notify Qualified Indiv Ind
Yes
Qualified Indiv Notif Datetime
2022-10-24 09:45:00
Oil Spill Removal Org Ind
Yes
Osro Activated Datetime
2022-10-24 11:00:00
Osro Arrived On Site Dt
10/24/2022 12:00
Num Pub Evacuated
0
Pipe Fac Name
Nederland Terminal
Segment Name
Doe Manifold
Onshore State Abbreviation
Tx
Onshore Postal Code
77627
Onshore City Name
Nederland
Onshore County Name
Jefferson
Designated Location
Survey Station No.
Designated Name
0+00
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
72
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
36
Pipe Wall Thickness
0.375
Pipe Smys
24000
Pipe Specification
Api 5l
Pipe Seam Type
Furnace Butt Welded
Pipe Manufacturer
Unknown
Pipe Coating Type
Fusion Bonded Epoxy(Fbe)
Coating Applied Ind
Unknown
Installation Year
Unknown
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
4250
Est Cost Prop Damage
23000
Est Cost Emergency
10000
Est Cost Environmental
324000
Est Cost Other
0
Prpty
361250
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
80
Mop Psig
275
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
1980-01-01 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
A review of the accident determined that there were no control room actions that contributed to the event.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Water Acid Ind
Yes
Int Microbiological Ind
Yes
Int Field Exam Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
No
Corrosion Lining
No
Cleaning Dewatering
Not Applicable - Not Mainline Pipe
Corrosion Coupons
Not Applicable - Not Mainline Pipe
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
T*** N*******
Preparer Title
Director - Regulatory Compliance
Preparer Email
T************@e*************.com
Preparer Telephone
713-989-7126
Prepared Date
2022-11-22 00:00:00
Authorizer Name
T*** N*******
Authorizer Telephone
713-989-7126
Authorizer Title
Director - Regulatory Compliance
Authorizer Email
T************@e*************.com
Narrative
On 10/24/2022 at 09:30, a leak was discovered at the doe manifold. An estimated 2-3 barrels of crude oil was released based on site conditions at initial discovery. A contractor and local operations personnel were summoned to the site to begin cleanup and investigation. On 10/25, the investigation and excavation continued without locating the leak location. On 10/26, a wider area was excavated and an additional released product volume (50 bbls) was identified. Based on the discovery of increased volume of product and required soil remediation it was determined that costs would exceed $50k and the nrc was notified immediately following determination. On 10/27, excavation and cleanup continued. Leak site was identified. Visual examination determined that the release was caused by internal corrosion. A plidco mechanical repair clamp was installed. On 10/28, 48 hr. Nrc notification made. The line was returned to service on 11/1/22.
| Report Received Date | 2022-11-22 00:00:00 |
|---|---|
| Iyear | 2022 |
| Report Number | 20220257 |
| Supplemental Number | 37375 |
| Report Type | Supplemental Final |
| Operator Id | 39706 PHMSA Enforcement |
| Name | Energy Transfer Nederland Terminal Llc |
| Operator Street Address | 1300 Main Street |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2022-10-24 09:30:00 |
| Time Zone | Central |
| Daylight Savings Ind | Yes |
| Location Latitude | 29.997547 Google Maps OpenStreetMap |
| Location Longitude | -93.993622 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 50 |
| Recovered Bbls | 50 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2022-10-24 09:30:00 |
| System Part Involved | Onshore Terminal/tank Farm Equipment And Piping |
| On Off Shore | Onshore |
| Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2022-10-24 09:30:00 |
| Restart Datetime | 2022-11-01 09:00:00 |
| Communication State Fed Ind | Yes |
| Party Initiated Communication | Operator |
| Initial Responder Com Datetime | 2022-10-26 14:39:00 |
| On Site Datetime | 2022-10-24 09:30:00 |
| Confirmed Discovery Datetime | 2022-10-24 09:30:00 |
| Nrc Rpt Datetime | 2022-10-26 14:23:00 |
| Nrc Rpt Num | 1350926 NRC Report How to search |
| Additional Nrc Report Numbers | 1351116 |
| Ignite Ind | No |
| Notify Qualified Indiv Ind | Yes |
| Qualified Indiv Notif Datetime | 2022-10-24 09:45:00 |
| Oil Spill Removal Org Ind | Yes |
| Osro Activated Datetime | 2022-10-24 11:00:00 |
| Osro Arrived On Site Dt | 10/24/2022 12:00 |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Nederland Terminal |
| Segment Name | Doe Manifold |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 77627 |
| Onshore City Name | Nederland |
| Onshore County Name | Jefferson |
| Designated Location | Survey Station No. |
| Designated Name | 0+00 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 72 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Puddle Weld Ind | No |
| Pipe Diameter | 36 |
| Pipe Wall Thickness | 0.375 |
| Pipe Smys | 24000 |
| Pipe Specification | Api 5l |
| Pipe Seam Type | Furnace Butt Welded |
| Pipe Manufacturer | Unknown |
| Pipe Coating Type | Fusion Bonded Epoxy(Fbe) |
| Coating Applied Ind | Unknown |
| Installation Year | Unknown |
| Manufactured Year | Unknown |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Pinhole |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 4250 |
| Est Cost Prop Damage | 23000 |
| Est Cost Emergency | 10000 |
| Est Cost Environmental | 324000 |
| Est Cost Other | 0 |
| Prpty | 361250 |
| Num Persons Hosp Not Ovnght | 0 |
| Num Injured Treated By Emt | 0 |
| Num Resident Building Affctd | 0 |
| Num Business Building Affctd | 0 |
| Accident Psig | 80 |
| Mop Psig | 275 |
| Mop Cfr Section | Component Design Pressure �195.406(A)(2) View CFR 49 §192 |
| Maop Established Date | 1980-01-01 00:00:00 |
| Maop Reversal Flow Ind | No |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | A review of the accident determined that there were no control room actions that contributed to the event. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | Internal Corrosion |
| Internal External | Internal Corrosion |
| Int Visual Exam Results | Localized Pitting |
| Int Water Acid Ind | Yes |
| Int Microbiological Ind | Yes |
| Int Field Exam Basis Ind | Yes |
| Int Low Point Pipe Loc Ind | Yes |
| Corrosion Inhibitors | No |
| Corrosion Lining | No |
| Cleaning Dewatering | Not Applicable - Not Mainline Pipe |
| Corrosion Coupons | Not Applicable - Not Mainline Pipe |
| Collected Data Ind | No |
| Has Hydrtst Conduc Before Ind | No |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | T*** N******* |
| Preparer Title | Director - Regulatory Compliance |
| Preparer Email | T************@e*************.com |
| Preparer Telephone | 713-989-7126 |
| Prepared Date | 2022-11-22 00:00:00 |
| Authorizer Name | T*** N******* |
| Authorizer Telephone | 713-989-7126 |
| Authorizer Title | Director - Regulatory Compliance |
| Authorizer Email | T************@e*************.com |
| Narrative | On 10/24/2022 at 09:30, a leak was discovered at the doe manifold. An estimated 2-3 barrels of crude oil was released based on site conditions at initial discovery. A contractor and local operations personnel were summoned to the site to begin cleanup and investigation. On 10/25, the investigation and excavation continued without locating the leak location. On 10/26, a wider area was excavated and an additional released product volume (50 bbls) was identified. Based on the discovery of increased volume of product and required soil remediation it was determined that costs would exceed $50k and the nrc was notified immediately following determination. On 10/27, excavation and cleanup continued. Leak site was identified. Visual examination determined that the release was caused by internal corrosion. A plidco mechanical repair clamp was installed. On 10/28, 48 hr. Nrc notification made. The line was returned to service on 11/1/22. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA