HL incident on 2022-10-24 — TX

Operator
Energy Transfer Nederland Terminal Llc
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$23,000
Incident datetime
2022-10-24 09:30
Report number
Location
TX
Narrative
On 10/24/2022 at 09:30, a leak was discovered at the doe manifold. An estimated 2-3 barrels of crude oil was released based on site conditions at initial discovery. A contractor and local operations personnel were summoned to the site to begin cleanup and investigation. On 10/25, the investigation and excavation continued without locating the leak location. On 10/26, a wider area was excavated and an additional released product volume (50 bbls) was identified. Based on the discovery of increased volume of product and required soil remediation it was determined that costs would exceed $50k and the nrc was notified immediately following determination. On 10/27, excavation and cleanup continued. Leak site was identified. Visual examination determined that the release was caused by internal corrosion. A plidco mechanical repair clamp was installed. On 10/28, 48 hr. Nrc notification made. The line was returned to service on 11/1/22.
Detailed record list
Report Received Date
2022-11-22 00:00:00
Iyear
2022
Report Number
20220257
Supplemental Number
37375
Report Type
Supplemental Final
Operator Id
Name
Energy Transfer Nederland Terminal Llc
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2022-10-24 09:30:00
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
50
Recovered Bbls
50
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2022-10-24 09:30:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2022-10-24 09:30:00
Restart Datetime
2022-11-01 09:00:00
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Initial Responder Com Datetime
2022-10-26 14:39:00
On Site Datetime
2022-10-24 09:30:00
Confirmed Discovery Datetime
2022-10-24 09:30:00
Nrc Rpt Datetime
2022-10-26 14:23:00
Nrc Rpt Num
Additional Nrc Report Numbers
1351116
Ignite Ind
No
Notify Qualified Indiv Ind
Yes
Qualified Indiv Notif Datetime
2022-10-24 09:45:00
Oil Spill Removal Org Ind
Yes
Osro Activated Datetime
2022-10-24 11:00:00
Osro Arrived On Site Dt
10/24/2022 12:00
Num Pub Evacuated
0
Pipe Fac Name
Nederland Terminal
Segment Name
Doe Manifold
Onshore State Abbreviation
Tx
Onshore Postal Code
77627
Onshore City Name
Nederland
Onshore County Name
Jefferson
Designated Location
Survey Station No.
Designated Name
0+00
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
72
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
36
Pipe Wall Thickness
0.375
Pipe Smys
24000
Pipe Specification
Api 5l
Pipe Seam Type
Furnace Butt Welded
Pipe Manufacturer
Unknown
Pipe Coating Type
Fusion Bonded Epoxy(Fbe)
Coating Applied Ind
Unknown
Installation Year
Unknown
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
4250
Est Cost Prop Damage
23000
Est Cost Emergency
10000
Est Cost Environmental
324000
Est Cost Other
0
Prpty
361250
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
80
Mop Psig
275
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
1980-01-01 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
A review of the accident determined that there were no control room actions that contributed to the event.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Water Acid Ind
Yes
Int Microbiological Ind
Yes
Int Field Exam Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
No
Corrosion Lining
No
Cleaning Dewatering
Not Applicable - Not Mainline Pipe
Corrosion Coupons
Not Applicable - Not Mainline Pipe
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
T*** N*******
Preparer Title
Director - Regulatory Compliance
Preparer Email
T************@e*************.com
Preparer Telephone
713-989-7126
Prepared Date
2022-11-22 00:00:00
Authorizer Name
T*** N*******
Authorizer Telephone
713-989-7126
Authorizer Title
Director - Regulatory Compliance
Authorizer Email
T************@e*************.com
Narrative
On 10/24/2022 at 09:30, a leak was discovered at the doe manifold. An estimated 2-3 barrels of crude oil was released based on site conditions at initial discovery. A contractor and local operations personnel were summoned to the site to begin cleanup and investigation. On 10/25, the investigation and excavation continued without locating the leak location. On 10/26, a wider area was excavated and an additional released product volume (50 bbls) was identified. Based on the discovery of increased volume of product and required soil remediation it was determined that costs would exceed $50k and the nrc was notified immediately following determination. On 10/27, excavation and cleanup continued. Leak site was identified. Visual examination determined that the release was caused by internal corrosion. A plidco mechanical repair clamp was installed. On 10/28, 48 hr. Nrc notification made. The line was returned to service on 11/1/22.
Report Received Date 2022-11-22 00:00:00
Iyear 2022
Report Number 20220257
Supplemental Number 37375
Report Type Supplemental Final
Operator Id 39706 PHMSA Enforcement
Name Energy Transfer Nederland Terminal Llc
Operator Street Address 1300 Main Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2022-10-24 09:30:00
Time Zone Central
Daylight Savings Ind Yes
Location Latitude 29.997547 Google Maps OpenStreetMap
Location Longitude -93.993622 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 50
Recovered Bbls 50
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2022-10-24 09:30:00
System Part Involved Onshore Terminal/tank Farm Equipment And Piping
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind Yes
Shutdown Datetime 2022-10-24 09:30:00
Restart Datetime 2022-11-01 09:00:00
Communication State Fed Ind Yes
Party Initiated Communication Operator
Initial Responder Com Datetime 2022-10-26 14:39:00
On Site Datetime 2022-10-24 09:30:00
Confirmed Discovery Datetime 2022-10-24 09:30:00
Nrc Rpt Datetime 2022-10-26 14:23:00
Nrc Rpt Num 1350926 NRC Report How to search
Additional Nrc Report Numbers 1351116
Ignite Ind No
Notify Qualified Indiv Ind Yes
Qualified Indiv Notif Datetime 2022-10-24 09:45:00
Oil Spill Removal Org Ind Yes
Osro Activated Datetime 2022-10-24 11:00:00
Osro Arrived On Site Dt 10/24/2022 12:00
Num Pub Evacuated 0
Pipe Fac Name Nederland Terminal
Segment Name Doe Manifold
Onshore State Abbreviation Tx
Onshore Postal Code 77627
Onshore City Name Nederland
Onshore County Name Jefferson
Designated Location Survey Station No.
Designated Name 0+00
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 72
Crossing No
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Body
Puddle Weld Ind No
Pipe Diameter 36
Pipe Wall Thickness 0.375
Pipe Smys 24000
Pipe Specification Api 5l
Pipe Seam Type Furnace Butt Welded
Pipe Manufacturer Unknown
Pipe Coating Type Fusion Bonded Epoxy(Fbe)
Coating Applied Ind Unknown
Installation Year Unknown
Manufactured Year Unknown
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 4250
Est Cost Prop Damage 23000
Est Cost Emergency 10000
Est Cost Environmental 324000
Est Cost Other 0
Prpty 361250
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 80
Mop Psig 275
Mop Cfr Section Component Design Pressure �195.406(A)(2) View CFR 49 §192
Maop Established Date 1980-01-01 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details A review of the accident determined that there were no control room actions that contributed to the event.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details Internal Corrosion
Internal External Internal Corrosion
Int Visual Exam Results Localized Pitting
Int Water Acid Ind Yes
Int Microbiological Ind Yes
Int Field Exam Basis Ind Yes
Int Low Point Pipe Loc Ind Yes
Corrosion Inhibitors No
Corrosion Lining No
Cleaning Dewatering Not Applicable - Not Mainline Pipe
Corrosion Coupons Not Applicable - Not Mainline Pipe
Collected Data Ind No
Has Hydrtst Conduc Before Ind No
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name T*** N*******
Preparer Title Director - Regulatory Compliance
Preparer Email T************@e*************.com
Preparer Telephone 713-989-7126
Prepared Date 2022-11-22 00:00:00
Authorizer Name T*** N*******
Authorizer Telephone 713-989-7126
Authorizer Title Director - Regulatory Compliance
Authorizer Email T************@e*************.com
Narrative On 10/24/2022 at 09:30, a leak was discovered at the doe manifold. An estimated 2-3 barrels of crude oil was released based on site conditions at initial discovery. A contractor and local operations personnel were summoned to the site to begin cleanup and investigation. On 10/25, the investigation and excavation continued without locating the leak location. On 10/26, a wider area was excavated and an additional released product volume (50 bbls) was identified. Based on the discovery of increased volume of product and required soil remediation it was determined that costs would exceed $50k and the nrc was notified immediately following determination. On 10/27, excavation and cleanup continued. Leak site was identified. Visual examination determined that the release was caused by internal corrosion. A plidco mechanical repair clamp was installed. On 10/28, 48 hr. Nrc notification made. The line was returned to service on 11/1/22.