HL incident on 2022-10-06 — TX

Operator
Chevron Pipe Line Co
Cause
Material Failure Of Pipe Or Weld
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$130,000
Incident datetime
2022-10-06 11:19
Report number
Location
TX
Narrative
At approx. 0930 cdt on 06oct22, a construction company working on the right-of-way of garner rd in la belle, tx, lel monitor detected chemicals in the atmosphere. This company notified the cpp area controller about the discovery, and upon arrival, it was discovered that dead grass and vapors were escaping from the ground above the pp mix pipeline. It is unknown how much product or what caused the release. Osro is enroute to assist in the remediation and repairs of the line, and a third-party company is on site to conduct ongoing air monitoring. 1st update: at approx. 1119 cdt on 06oct22 sample results confirmed the product to be pp mix. Prior to the report of the analysis, the system was isolated, and the pressure lowered to expedite the decommissioning of the system. N2 is in route and plans to decommission the system are in progress. 2nd update: at approx. 1759 cdt on 07oct22, it was initially estimated that a total of 9,136.4 lbs of pp mix had been released to the atmosphere. The pipeline system was decommissioned and purged with nitrogen. Plans for excavation and repairs are underway. Investigation is ongoing. 3rd update 01nov22, following the 3rd party metallurgical lab analysis, the pinhole was measured to be 0.25mm (~8 times smaller than initially estimated). Using the actual diameter of the pinhole resulted in an updated, estimated release volume of ~0.84 bbls (154 lbs).
Detailed record list
Report Received Date
2022-11-02 00:00:00
Iyear
2022
Report Number
20220248
Supplemental Number
37461
Report Type
Supplemental Final
Operator Id
Name
Chevron Pipe Line Co
Operator Street Address
1400 Smith Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2022-10-06 11:19:00
Time Zone
Central
Daylight Savings Ind
No
Location Latitude
Location Longitude
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Other Hvl
Commodity Details
Propylene-Propane Mix
Unintentional Release Bbls
0.84
Intentional Release Bbls
2558
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Ground Patrol By Operator Or Its Contractor
Operator Type
Operator Employee
Incident Identified Datetime
2022-10-06 11:19:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2022-10-06 23:45:00
Restart Datetime
2022-10-11 09:23:00
Communication State Fed Ind
Yes
Party Initiated Communication
Local/state/federal Emergency Responder
Initial Responder Com Datetime
2022-10-06 09:39:00
On Site Datetime
2022-10-06 08:43:00
Confirmed Discovery Datetime
2022-10-06 11:19:00
Nrc Rpt Datetime
2022-10-06 11:21:00
Nrc Rpt Num
Additional Nrc Report Numbers
1349307
Ignite Ind
No
Upstream Action Taken
Valve Closure
Upstream Valve Close Datetime
2022-10-06 10:42:00
Upstream Valve Type Ind
Automatic
Downstream Action Taken
Valve Closure
Downstream Vlv Close Datetime
2022-10-06 11:12:00
Downstream Valve Type Ind
Remotely Controlled
Num Pub Evacuated
0
Pipe Fac Name
8" Fannet To Port Acres
Segment Name
Txl0028
Onshore State Abbreviation
Tx
Onshore Postal Code
77705
Onshore City Name
Labelle
Onshore County Name
Jefferson
Designated Location
Survey Station No.
Designated Name
516+31 Mp9.77
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
34
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
8.625
Pipe Wall Thickness
0.25
Pipe Smys
42000
Pipe Specification
Api5l
Pipe Seam Type
Seamless
Pipe Manufacturer
Unknown
Pipe Coating Type
Coal Tar
Coating Applied Ind
No
Installation Year
1958
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
130000
Est Cost Emergency
20500
Est Cost Environmental
0
Est Cost Other
0
Prpty
150500
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
800
Mop Psig
1461
Mop Cfr Section
Internal Design Pressure �195.406(A)(1)
Maop Established Date
2016-11-05 00:00:00
Maop Reversal Flow Ind
Bi-Directional
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
39891
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Pinhole leak had no correlation to control-room operations
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Design-, Construction-, Installation-, Or Fabrication-Related
Field Exam Ind
Yes
Other Analysis Ind
Yes
Other Analysis Details
Vt&rt By Ndt/destructive By Element Lab
Failure Type
Design-, Construction-, Installation-, Or Fabrication-Related
Other Factor
Yes
Other Factor Details
Pinhole Leak On Weld
Pwf Additional Other Ind
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Axial Recent Year
2020
Axial Rcnt Propul Method
Free Swimming
Axial Rcnt Attuned Detect
Metal Loss
Axial Rcnt Atnd Dtct Metal
High Resolution
Axial Previous Year
2016
Axial Prev Propul Method
Free Swimming
Axial Prev Attuned Detect
Metal Loss
Axial Prev Atnd Dtct Metal
High Resolution
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2016
Hydrtst Most Rcnt Pressure
1942
Direct Asmnt Conducted
No
Non Destructive Exam Ind
Yes
Exm Other Type
Smart Tool 2016..2020 Mfl Tool
Exm Other Rcnt Year
2020
Exm Other Rcnt Ind
Yes
Preparer Name
F******* D* L* O***
Preparer Title
Lead Regulatory Specialist
Preparer Email
F********@c******.com
Preparer Telephone
310 245-8538
Prepared Date
2022-12-13 00:00:00
Authorizer Name
F******* D* L* O***
Authorizer Telephone
310 245-8538
Authorizer Title
Lead Regulatory Specialist
Authorizer Email
F********@c******.com
Narrative
At approx. 0930 cdt on 06oct22, a construction company working on the right-of-way of garner rd in la belle, tx, lel monitor detected chemicals in the atmosphere. This company notified the cpp area controller about the discovery, and upon arrival, it was discovered that dead grass and vapors were escaping from the ground above the pp mix pipeline. It is unknown how much product or what caused the release. Osro is enroute to assist in the remediation and repairs of the line, and a third-party company is on site to conduct ongoing air monitoring. 1st update: at approx. 1119 cdt on 06oct22 sample results confirmed the product to be pp mix. Prior to the report of the analysis, the system was isolated, and the pressure lowered to expedite the decommissioning of the system. N2 is in route and plans to decommission the system are in progress. 2nd update: at approx. 1759 cdt on 07oct22, it was initially estimated that a total of 9,136.4 lbs of pp mix had been released to the atmosphere. The pipeline system was decommissioned and purged with nitrogen. Plans for excavation and repairs are underway. Investigation is ongoing. 3rd update 01nov22, following the 3rd party metallurgical lab analysis, the pinhole was measured to be 0.25mm (~8 times smaller than initially estimated). Using the actual diameter of the pinhole resulted in an updated, estimated release volume of ~0.84 bbls (154 lbs).
Report Received Date 2022-11-02 00:00:00
Iyear 2022
Report Number 20220248
Supplemental Number 37461
Report Type Supplemental Final
Operator Id 2731 PHMSA Enforcement
Name Chevron Pipe Line Co
Operator Street Address 1400 Smith Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2022-10-06 11:19:00
Time Zone Central
Daylight Savings Ind No
Location Latitude 29.901979 Google Maps OpenStreetMap
Location Longitude -94.127949 Google Maps OpenStreetMap
Commodity Released Type Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype Other Hvl
Commodity Details Propylene-Propane Mix
Unintentional Release Bbls 0.84
Intentional Release Bbls 2558
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Ground Patrol By Operator Or Its Contractor
Operator Type Operator Employee
Incident Identified Datetime 2022-10-06 11:19:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind Yes
Shutdown Datetime 2022-10-06 23:45:00
Restart Datetime 2022-10-11 09:23:00
Communication State Fed Ind Yes
Party Initiated Communication Local/state/federal Emergency Responder
Initial Responder Com Datetime 2022-10-06 09:39:00
On Site Datetime 2022-10-06 08:43:00
Confirmed Discovery Datetime 2022-10-06 11:19:00
Nrc Rpt Datetime 2022-10-06 11:21:00
Nrc Rpt Num 1349182 NRC Report How to search
Additional Nrc Report Numbers 1349307
Ignite Ind No
Upstream Action Taken Valve Closure
Upstream Valve Close Datetime 2022-10-06 10:42:00
Upstream Valve Type Ind Automatic
Downstream Action Taken Valve Closure
Downstream Vlv Close Datetime 2022-10-06 11:12:00
Downstream Valve Type Ind Remotely Controlled
Num Pub Evacuated 0
Pipe Fac Name 8" Fannet To Port Acres
Segment Name Txl0028
Onshore State Abbreviation Tx
Onshore Postal Code 77705
Onshore City Name Labelle
Onshore County Name Jefferson
Designated Location Survey Station No.
Designated Name 516+31 Mp9.77
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 34
Crossing No
Pipe Facility Type Intrastate
Item Involved Pipe
Pipe Type Pipe Body
Puddle Weld Ind No
Pipe Diameter 8.625
Pipe Wall Thickness 0.25
Pipe Smys 42000
Pipe Specification Api5l
Pipe Seam Type Seamless
Pipe Manufacturer Unknown
Pipe Coating Type Coal Tar
Coating Applied Ind No
Installation Year 1958
Manufactured Year Unknown
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 0
Est Cost Prop Damage 130000
Est Cost Emergency 20500
Est Cost Environmental 0
Est Cost Other 0
Prpty 150500
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 800
Mop Psig 1461
Mop Cfr Section Internal Design Pressure �195.406(A)(1) View CFR 49 §192
Maop Established Date 2016-11-05 00:00:00
Maop Reversal Flow Ind Bi-Directional
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 39891
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Pinhole leak had no correlation to control-room operations
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Material Failure Of Pipe Or Weld
Cause Details Design-, Construction-, Installation-, Or Fabrication-Related
Field Exam Ind Yes
Other Analysis Ind Yes
Other Analysis Details Vt&rt By Ndt/destructive By Element Lab
Failure Type Design-, Construction-, Installation-, Or Fabrication-Related
Other Factor Yes
Other Factor Details Pinhole Leak On Weld
Pwf Additional Other Ind Yes
Collected Data Ind Yes
Axial Magnetic Flx Lkg Ind Yes
Axial Recent Year 2020
Axial Rcnt Propul Method Free Swimming
Axial Rcnt Attuned Detect Metal Loss
Axial Rcnt Atnd Dtct Metal High Resolution
Axial Previous Year 2016
Axial Prev Propul Method Free Swimming
Axial Prev Attuned Detect Metal Loss
Axial Prev Atnd Dtct Metal High Resolution
Has Hydrtst Conduc Before Ind Yes
Hydrtst Most Rcnt Year 2016
Hydrtst Most Rcnt Pressure 1942
Direct Asmnt Conducted No
Non Destructive Exam Ind Yes
Exm Other Type Smart Tool 2016..2020 Mfl Tool
Exm Other Rcnt Year 2020
Exm Other Rcnt Ind Yes
Preparer Name F******* D* L* O***
Preparer Title Lead Regulatory Specialist
Preparer Email F********@c******.com
Preparer Telephone 310 245-8538
Prepared Date 2022-12-13 00:00:00
Authorizer Name F******* D* L* O***
Authorizer Telephone 310 245-8538
Authorizer Title Lead Regulatory Specialist
Authorizer Email F********@c******.com
Narrative At approx. 0930 cdt on 06oct22, a construction company working on the right-of-way of garner rd in la belle, tx, lel monitor detected chemicals in the atmosphere. This company notified the cpp area controller about the discovery, and upon arrival, it was discovered that dead grass and vapors were escaping from the ground above the pp mix pipeline. It is unknown how much product or what caused the release. Osro is enroute to assist in the remediation and repairs of the line, and a third-party company is on site to conduct ongoing air monitoring. 1st update: at approx. 1119 cdt on 06oct22 sample results confirmed the product to be pp mix. Prior to the report of the analysis, the system was isolated, and the pressure lowered to expedite the decommissioning of the system. N2 is in route and plans to decommission the system are in progress. 2nd update: at approx. 1759 cdt on 07oct22, it was initially estimated that a total of 9,136.4 lbs of pp mix had been released to the atmosphere. The pipeline system was decommissioned and purged with nitrogen. Plans for excavation and repairs are underway. Investigation is ongoing. 3rd update 01nov22, following the 3rd party metallurgical lab analysis, the pinhole was measured to be 0.25mm (~8 times smaller than initially estimated). Using the actual diameter of the pinhole resulted in an updated, estimated release volume of ~0.84 bbls (154 lbs).