Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2022-09-14 — TX
Operator
Plains Pipeline, L.p.
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$250
Incident datetime
2022-09-14 19:05
Report number
Location
TX
Narrative
Approximately 4 barrels of crude oil were released from the 30" manifold piping at mccamey cactus ii station. The date/time of the release (part a q4) is indicative of the earliest possible time the release could have started, as it was the last time the station operator had visited the location and confirmed there was no release of crude oil. The cause of the release was attributed to internal corrosion and further information regarding this cause will be provided pending further investigations. Supplemental: the cause of the release is attributed to internal corrosion as a result of water drop-out/acid, as determined by visual examination of the release point and evaluation of the flow conditions of the line. To prevent future incidents, plains purged, air-gapped, and placed the failed section of pipe out of service. Supplemental (2): per the texas railroad commissions request to update this report, the supplemental narrative has been updated to include further preventative measures: following the incident, a review of all facility piping was completed to identify lines that have similar operating conditions to the line that failed. The 24" surge line was identified to have similar operating conditions to the line that failed: an ndt inspection was completed, and it was placed on a monitoring schedule. Further, changes were made to the flushing plan on the 24" surge line to reduce risk of similar incidents. The station piping has not been abandoned but is currently out-of-service, and there is no risk of release from this segment.
Detailed record list
Report Received Date
2022-10-14 00:00:00
Iyear
2022
Report Number
20220234
Supplemental Number
37886
Report Type
Supplemental Final
Operator Id
Name
Plains Pipeline, L.p.
Operator Street Address
333 Clay Street, Suite 1900
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2022-09-14 18:10:00
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
31.138649
Location Longitude
-102.182686
Commodity Released Type
Crude Oil
Unintentional Release Bbls
4
Recovered Bbls
4
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2022-09-14 19:05:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2022-09-14 19:20:00
Restart Datetime
2022-09-15 02:46:00
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Initial Responder Com Datetime
2022-09-14 20:00:00
On Site Datetime
2022-09-14 19:05:00
Confirmed Discovery Datetime
2022-09-14 19:05:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Notify Qualified Indiv Ind
Yes
Qualified Indiv Notif Datetime
2022-09-14 19:10:00
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Mccamey Cactus Ii
Segment Name
30inch Manifold Station Piping
Onshore State Abbreviation
Tx
Onshore Postal Code
79752
Onshore City Name
Mccamey
Onshore County Name
Upton
Designated Location
Milepost
Designated Name
0+00
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
30
Pipe Wall Thickness
0.375
Pipe Smys
52000
Pipe Specification
Api 5l
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Unknown
Pipe Coating Type
Paint
Coating Applied Ind
Yes
Installation Year
2019
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
340
Est Cost Prop Damage
250
Est Cost Emergency
18250
Est Cost Environmental
0
Est Cost Other
0
Prpty
18840
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
15
Mop Psig
285
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
2019-06-30 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Controller did not receive alarms indicating a release.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Not Cut Open
Int Water Acid Ind
Yes
Int Field Exam Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
No
Corrosion Lining
No
Cleaning Dewatering
Not Applicable - Not Mainline Pipe
Corrosion Coupons
Not Applicable - Not Mainline Pipe
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
N****** G*******
Preparer Title
Supervisor Hse Regulatory Compliance
Preparer Email
N*********@p****.com
Preparer Telephone
7136464376
Prepared Date
2023-03-29 00:00:00
Local Contact Name
N****** A G*******
Local Contact Email
N*********@p****.com
Local Contact Telephone
7136464376
Authorizer Name
N***** G*****
Authorizer Telephone
7136464336
Authorizer Title
Mgr Director Hse
Authorizer Email
N******@p****.com
Narrative
Approximately 4 barrels of crude oil were released from the 30" manifold piping at mccamey cactus ii station. The date/time of the release (part a q4) is indicative of the earliest possible time the release could have started, as it was the last time the station operator had visited the location and confirmed there was no release of crude oil. The cause of the release was attributed to internal corrosion and further information regarding this cause will be provided pending further investigations. Supplemental: the cause of the release is attributed to internal corrosion as a result of water drop-out/acid, as determined by visual examination of the release point and evaluation of the flow conditions of the line. To prevent future incidents, plains purged, air-gapped, and placed the failed section of pipe out of service. Supplemental (2): per the texas railroad commissions request to update this report, the supplemental narrative has been updated to include further preventative measures: following the incident, a review of all facility piping was completed to identify lines that have similar operating conditions to the line that failed. The 24" surge line was identified to have similar operating conditions to the line that failed: an ndt inspection was completed, and it was placed on a monitoring schedule. Further, changes were made to the flushing plan on the 24" surge line to reduce risk of similar incidents. The station piping has not been abandoned but is currently out-of-service, and there is no risk of release from this segment.
| Report Received Date | 2022-10-14 00:00:00 |
|---|---|
| Iyear | 2022 |
| Report Number | 20220234 |
| Supplemental Number | 37886 |
| Report Type | Supplemental Final |
| Operator Id | 300 PHMSA Enforcement |
| Name | Plains Pipeline, L.p. |
| Operator Street Address | 333 Clay Street, Suite 1900 |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2022-09-14 18:10:00 |
| Time Zone | Central |
| Daylight Savings Ind | Yes |
| Location Latitude | 31.138649 Google Maps OpenStreetMap |
| Location Longitude | -102.182686 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 4 |
| Recovered Bbls | 4 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2022-09-14 19:05:00 |
| System Part Involved | Onshore Terminal/tank Farm Equipment And Piping |
| On Off Shore | Onshore |
| Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2022-09-14 19:20:00 |
| Restart Datetime | 2022-09-15 02:46:00 |
| Communication State Fed Ind | Yes |
| Party Initiated Communication | Operator |
| Initial Responder Com Datetime | 2022-09-14 20:00:00 |
| On Site Datetime | 2022-09-14 19:05:00 |
| Confirmed Discovery Datetime | 2022-09-14 19:05:00 |
| Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
| Ignite Ind | No |
| Notify Qualified Indiv Ind | Yes |
| Qualified Indiv Notif Datetime | 2022-09-14 19:10:00 |
| Oil Spill Removal Org Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Mccamey Cactus Ii |
| Segment Name | 30inch Manifold Station Piping |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 79752 |
| Onshore City Name | Mccamey |
| Onshore County Name | Upton |
| Designated Location | Milepost |
| Designated Name | 0+00 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Puddle Weld Ind | No |
| Pipe Diameter | 30 |
| Pipe Wall Thickness | 0.375 |
| Pipe Smys | 52000 |
| Pipe Specification | Api 5l |
| Pipe Seam Type | Erw - High Frequency |
| Pipe Manufacturer | Unknown |
| Pipe Coating Type | Paint |
| Coating Applied Ind | Yes |
| Installation Year | 2019 |
| Manufactured Year | Unknown |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Pinhole |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 340 |
| Est Cost Prop Damage | 250 |
| Est Cost Emergency | 18250 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 18840 |
| Num Persons Hosp Not Ovnght | 0 |
| Num Injured Treated By Emt | 0 |
| Num Resident Building Affctd | 0 |
| Num Business Building Affctd | 0 |
| Accident Psig | 15 |
| Mop Psig | 285 |
| Mop Cfr Section | Component Design Pressure �195.406(A)(2) View CFR 49 §192 |
| Maop Established Date | 2019-06-30 00:00:00 |
| Maop Reversal Flow Ind | No |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Controller did not receive alarms indicating a release. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | Internal Corrosion |
| Internal External | Internal Corrosion |
| Int Visual Exam Results | Not Cut Open |
| Int Water Acid Ind | Yes |
| Int Field Exam Basis Ind | Yes |
| Int Low Point Pipe Loc Ind | Yes |
| Corrosion Inhibitors | No |
| Corrosion Lining | No |
| Cleaning Dewatering | Not Applicable - Not Mainline Pipe |
| Corrosion Coupons | Not Applicable - Not Mainline Pipe |
| Collected Data Ind | No |
| Has Hydrtst Conduc Before Ind | No |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | N****** G******* |
| Preparer Title | Supervisor Hse Regulatory Compliance |
| Preparer Email | N*********@p****.com |
| Preparer Telephone | 7136464376 |
| Prepared Date | 2023-03-29 00:00:00 |
| Local Contact Name | N****** A G******* |
| Local Contact Email | N*********@p****.com |
| Local Contact Telephone | 7136464376 |
| Authorizer Name | N***** G***** |
| Authorizer Telephone | 7136464336 |
| Authorizer Title | Mgr Director Hse |
| Authorizer Email | N******@p****.com |
| Narrative | Approximately 4 barrels of crude oil were released from the 30" manifold piping at mccamey cactus ii station. The date/time of the release (part a q4) is indicative of the earliest possible time the release could have started, as it was the last time the station operator had visited the location and confirmed there was no release of crude oil. The cause of the release was attributed to internal corrosion and further information regarding this cause will be provided pending further investigations. Supplemental: the cause of the release is attributed to internal corrosion as a result of water drop-out/acid, as determined by visual examination of the release point and evaluation of the flow conditions of the line. To prevent future incidents, plains purged, air-gapped, and placed the failed section of pipe out of service. Supplemental (2): per the texas railroad commissions request to update this report, the supplemental narrative has been updated to include further preventative measures: following the incident, a review of all facility piping was completed to identify lines that have similar operating conditions to the line that failed. The 24" surge line was identified to have similar operating conditions to the line that failed: an ndt inspection was completed, and it was placed on a monitoring schedule. Further, changes were made to the flushing plan on the 24" surge line to reduce risk of similar incidents. The station piping has not been abandoned but is currently out-of-service, and there is no risk of release from this segment. |