HL incident on 2022-09-11 — GA
Operator
Colonial Pipeline Co
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$0
Incident datetime
2022-09-11 04:09
Report number
Location
GA
Narrative
On 9/11/2022 at 0409 et the line 01 controller received a high booster station sump alarm for the line 01 booster station at atlanta junction. The controller called local operations, and a local operator went to the booster station to check the sump. A mist of product was observed coming from the booster station check valve leak detection jar located near unit 4, between the suction and discharge valve. Local operations notified the control center. The booster station was by-passed, and the suction and discharge valves were manually closed to isolate the booster station. Contract crews were dispatched to excavate the surrounding gravel and soil. The check valve was repaired by replacing the packing, and the booster station was returned to normal operations. Update: internal accident investigation was completed and confirmed equipment failure as the cause.
Detailed record list
Report Received Date
2022-10-11 00:00:00
Iyear
2022
Report Number
20220230
Supplemental Number
37483
Report Type
Supplemental Final
Operator Id
2552
Name
Colonial Pipeline Co
Operator Street Address
1000 Lake St.
Operator City Name
Alpharetta
Operator State Abbreviation
GA
Operator Postal Code
30009
Local Datetime
2022-09-11 04:09:00
Time Zone
Eastern
Daylight Savings Ind
No
Location Latitude
33.85604
Location Longitude
-84.629372
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
1.19
Recovered Bbls
0.71
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Or Pack Calculations)
Incident Identified Datetime
2022-09-11 04:09:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
No
Shutdown Explain
Only Needed To Isolate The Booster Station.
Communication State Fed Ind
No
On Site Datetime
2022-09-11 04:09:00
Confirmed Discovery Datetime
2022-09-11 04:09:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Notify Qualified Indiv Ind
No
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Atlanta Junction
Segment Name
Atlanta Junction Booster Station
Onshore State Abbreviation
Ga
Onshore Postal Code
30106
Onshore City Name
Austell
Onshore County Name
Cobb
Designated Location
Survey Station No.
Designated Name
2306+85
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Valve
Valve Type
Mainline
Valve Mainline Type
Check
Valve Manufacturer
Grove
Installation Year
Unknown
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
118
Est Cost Prop Damage
0
Est Cost Emergency
40000
Est Cost Environmental
0
Est Cost Other
0
Prpty
40118
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
840
Mop Psig
413
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
2017-01-01 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Exceeded 110% Of Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Controller actions or control room issues did not cause or contribute to the equipment failure.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Pump Or Pump-Related Equipment
Eq Failure Type
Pump Or Pump-Related Equipment
Other Pump Ind
Seal/packing Failure
Eq Additional Other Ind
Yes
Eq Additional Other Details
Leak Rate From Check Valve Exceeded Leak Detection Jar Storage.
Preparer Name
D***** L******
Preparer Title
Compliance Coordinator
Preparer Email
D*******@c******.com
Preparer Telephone
4438211456
Prepared Date
2022-12-16 00:00:00
Authorizer Name
Q****** F******
Authorizer Telephone
6787622270
Authorizer Title
Director Pipeline Compliance
Authorizer Email
Q*******@c******.com
Narrative
On 9/11/2022 at 0409 et the line 01 controller received a high booster station sump alarm for the line 01 booster station at atlanta junction. The controller called local operations, and a local operator went to the booster station to check the sump. A mist of product was observed coming from the booster station check valve leak detection jar located near unit 4, between the suction and discharge valve. Local operations notified the control center. The booster station was by-passed, and the suction and discharge valves were manually closed to isolate the booster station. Contract crews were dispatched to excavate the surrounding gravel and soil. The check valve was repaired by replacing the packing, and the booster station was returned to normal operations. Update: internal accident investigation was completed and confirmed equipment failure as the cause.
| Report Received Date | 2022-10-11 00:00:00 |
|---|---|
| Iyear | 2022 |
| Report Number | 20220230 |
| Supplemental Number | 37483 |
| Report Type | Supplemental Final |
| Operator Id | 2552 PHMSA Enforcement |
| Name | Colonial Pipeline Co |
| Operator Street Address | 1000 Lake St. |
| Operator City Name | Alpharetta |
| Operator State Abbreviation | GA |
| Operator Postal Code | 30009 |
| Local Datetime | 2022-09-11 04:09:00 |
| Time Zone | Eastern |
| Daylight Savings Ind | No |
| Location Latitude | 33.85604 Google Maps OpenStreetMap |
| Location Longitude | -84.629372 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Gasoline (Non-Ethanol) |
| Unintentional Release Bbls | 1.19 |
| Recovered Bbls | 0.71 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Or Pack Calculations) |
| Incident Identified Datetime | 2022-09-11 04:09:00 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | Only Needed To Isolate The Booster Station. |
| Communication State Fed Ind | No |
| On Site Datetime | 2022-09-11 04:09:00 |
| Confirmed Discovery Datetime | 2022-09-11 04:09:00 |
| Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
| Ignite Ind | No |
| Notify Qualified Indiv Ind | No |
| Oil Spill Removal Org Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Atlanta Junction |
| Segment Name | Atlanta Junction Booster Station |
| Onshore State Abbreviation | Ga |
| Onshore Postal Code | 30106 |
| Onshore City Name | Austell |
| Onshore County Name | Cobb |
| Designated Location | Survey Station No. |
| Designated Name | 2306+85 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Valve |
| Valve Type | Mainline |
| Valve Mainline Type | Check |
| Valve Manufacturer | Grove |
| Installation Year | Unknown |
| Manufactured Year | Unknown |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Seal Or Packing |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| High Pop Ind | Yes |
| High Pop Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 118 |
| Est Cost Prop Damage | 0 |
| Est Cost Emergency | 40000 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 40118 |
| Num Persons Hosp Not Ovnght | 0 |
| Num Injured Treated By Emt | 0 |
| Num Resident Building Affctd | 0 |
| Num Business Building Affctd | 0 |
| Accident Psig | 840 |
| Mop Psig | 413 |
| Mop Cfr Section | Component Design Pressure �195.406(A)(2) View CFR 49 §192 |
| Maop Established Date | 2017-01-01 00:00:00 |
| Maop Reversal Flow Ind | No |
| Accident Pressure | Pressure Exceeded 110% Of Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | Yes |
| Scada Conf Ind | Yes |
| Cpm In Place Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Controller actions or control room issues did not cause or contribute to the equipment failure. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Pump Or Pump-Related Equipment |
| Eq Failure Type | Pump Or Pump-Related Equipment |
| Other Pump Ind | Seal/packing Failure |
| Eq Additional Other Ind | Yes |
| Eq Additional Other Details | Leak Rate From Check Valve Exceeded Leak Detection Jar Storage. |
| Preparer Name | D***** L****** |
| Preparer Title | Compliance Coordinator |
| Preparer Email | D*******@c******.com |
| Preparer Telephone | 4438211456 |
| Prepared Date | 2022-12-16 00:00:00 |
| Authorizer Name | Q****** F****** |
| Authorizer Telephone | 6787622270 |
| Authorizer Title | Director Pipeline Compliance |
| Authorizer Email | Q*******@c******.com |
| Narrative | On 9/11/2022 at 0409 et the line 01 controller received a high booster station sump alarm for the line 01 booster station at atlanta junction. The controller called local operations, and a local operator went to the booster station to check the sump. A mist of product was observed coming from the booster station check valve leak detection jar located near unit 4, between the suction and discharge valve. Local operations notified the control center. The booster station was by-passed, and the suction and discharge valves were manually closed to isolate the booster station. Contract crews were dispatched to excavate the surrounding gravel and soil. The check valve was repaired by replacing the packing, and the booster station was returned to normal operations. Update: internal accident investigation was completed and confirmed equipment failure as the cause. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA