HL incident on 2022-09-11 — GA

Operator
Colonial Pipeline Co
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$0
Incident datetime
2022-09-11 04:09
Report number
Location
GA
Narrative
On 9/11/2022 at 0409 et the line 01 controller received a high booster station sump alarm for the line 01 booster station at atlanta junction. The controller called local operations, and a local operator went to the booster station to check the sump. A mist of product was observed coming from the booster station check valve leak detection jar located near unit 4, between the suction and discharge valve. Local operations notified the control center. The booster station was by-passed, and the suction and discharge valves were manually closed to isolate the booster station. Contract crews were dispatched to excavate the surrounding gravel and soil. The check valve was repaired by replacing the packing, and the booster station was returned to normal operations. Update: internal accident investigation was completed and confirmed equipment failure as the cause.
Detailed record list
Report Received Date
2022-10-11 00:00:00
Iyear
2022
Report Number
20220230
Supplemental Number
37483
Report Type
Supplemental Final
Operator Id
Name
Colonial Pipeline Co
Operator Street Address
1000 Lake St.
Operator City Name
Alpharetta
Operator State Abbreviation
GA
Operator Postal Code
30009
Local Datetime
2022-09-11 04:09:00
Time Zone
Eastern
Daylight Savings Ind
No
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
1.19
Recovered Bbls
0.71
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Or Pack Calculations)
Incident Identified Datetime
2022-09-11 04:09:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
No
Shutdown Explain
Only Needed To Isolate The Booster Station.
Communication State Fed Ind
No
On Site Datetime
2022-09-11 04:09:00
Confirmed Discovery Datetime
2022-09-11 04:09:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Notify Qualified Indiv Ind
No
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Atlanta Junction
Segment Name
Atlanta Junction Booster Station
Onshore State Abbreviation
Ga
Onshore Postal Code
30106
Onshore City Name
Austell
Onshore County Name
Cobb
Designated Location
Survey Station No.
Designated Name
2306+85
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Valve
Valve Type
Mainline
Valve Mainline Type
Check
Valve Manufacturer
Grove
Installation Year
Unknown
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
118
Est Cost Prop Damage
0
Est Cost Emergency
40000
Est Cost Environmental
0
Est Cost Other
0
Prpty
40118
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
840
Mop Psig
413
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
2017-01-01 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Exceeded 110% Of Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Controller actions or control room issues did not cause or contribute to the equipment failure.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Pump Or Pump-Related Equipment
Eq Failure Type
Pump Or Pump-Related Equipment
Other Pump Ind
Seal/packing Failure
Eq Additional Other Ind
Yes
Eq Additional Other Details
Leak Rate From Check Valve Exceeded Leak Detection Jar Storage.
Preparer Name
D***** L******
Preparer Title
Compliance Coordinator
Preparer Email
D*******@c******.com
Preparer Telephone
4438211456
Prepared Date
2022-12-16 00:00:00
Authorizer Name
Q****** F******
Authorizer Telephone
6787622270
Authorizer Title
Director Pipeline Compliance
Authorizer Email
Q*******@c******.com
Narrative
On 9/11/2022 at 0409 et the line 01 controller received a high booster station sump alarm for the line 01 booster station at atlanta junction. The controller called local operations, and a local operator went to the booster station to check the sump. A mist of product was observed coming from the booster station check valve leak detection jar located near unit 4, between the suction and discharge valve. Local operations notified the control center. The booster station was by-passed, and the suction and discharge valves were manually closed to isolate the booster station. Contract crews were dispatched to excavate the surrounding gravel and soil. The check valve was repaired by replacing the packing, and the booster station was returned to normal operations. Update: internal accident investigation was completed and confirmed equipment failure as the cause.
Report Received Date 2022-10-11 00:00:00
Iyear 2022
Report Number 20220230
Supplemental Number 37483
Report Type Supplemental Final
Operator Id 2552 PHMSA Enforcement
Name Colonial Pipeline Co
Operator Street Address 1000 Lake St.
Operator City Name Alpharetta
Operator State Abbreviation GA
Operator Postal Code 30009
Local Datetime 2022-09-11 04:09:00
Time Zone Eastern
Daylight Savings Ind No
Location Latitude 33.85604 Google Maps OpenStreetMap
Location Longitude -84.629372 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Gasoline (Non-Ethanol)
Unintentional Release Bbls 1.19
Recovered Bbls 0.71
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Or Pack Calculations)
Incident Identified Datetime 2022-09-11 04:09:00
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind No
Shutdown Explain Only Needed To Isolate The Booster Station.
Communication State Fed Ind No
On Site Datetime 2022-09-11 04:09:00
Confirmed Discovery Datetime 2022-09-11 04:09:00
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Notify Qualified Indiv Ind No
Oil Spill Removal Org Ind No
Num Pub Evacuated 0
Pipe Fac Name Atlanta Junction
Segment Name Atlanta Junction Booster Station
Onshore State Abbreviation Ga
Onshore Postal Code 30106
Onshore City Name Austell
Onshore County Name Cobb
Designated Location Survey Station No.
Designated Name 2306+85
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Interstate
Item Involved Valve
Valve Type Mainline
Valve Mainline Type Check
Valve Manufacturer Grove
Installation Year Unknown
Manufactured Year Unknown
Material Involved Carbon Steel
Release Type Leak
Leak Type Seal Or Packing
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
High Pop Ind Yes
High Pop Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 118
Est Cost Prop Damage 0
Est Cost Emergency 40000
Est Cost Environmental 0
Est Cost Other 0
Prpty 40118
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 840
Mop Psig 413
Mop Cfr Section Component Design Pressure �195.406(A)(2) View CFR 49 §192
Maop Established Date 2017-01-01 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Exceeded 110% Of Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Controller actions or control room issues did not cause or contribute to the equipment failure.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Pump Or Pump-Related Equipment
Eq Failure Type Pump Or Pump-Related Equipment
Other Pump Ind Seal/packing Failure
Eq Additional Other Ind Yes
Eq Additional Other Details Leak Rate From Check Valve Exceeded Leak Detection Jar Storage.
Preparer Name D***** L******
Preparer Title Compliance Coordinator
Preparer Email D*******@c******.com
Preparer Telephone 4438211456
Prepared Date 2022-12-16 00:00:00
Authorizer Name Q****** F******
Authorizer Telephone 6787622270
Authorizer Title Director Pipeline Compliance
Authorizer Email Q*******@c******.com
Narrative On 9/11/2022 at 0409 et the line 01 controller received a high booster station sump alarm for the line 01 booster station at atlanta junction. The controller called local operations, and a local operator went to the booster station to check the sump. A mist of product was observed coming from the booster station check valve leak detection jar located near unit 4, between the suction and discharge valve. Local operations notified the control center. The booster station was by-passed, and the suction and discharge valves were manually closed to isolate the booster station. Contract crews were dispatched to excavate the surrounding gravel and soil. The check valve was repaired by replacing the packing, and the booster station was returned to normal operations. Update: internal accident investigation was completed and confirmed equipment failure as the cause.