HL incident on 2022-07-27 — WY

Operator
Bridger Pipeline Llc
Cause
Material Failure Of Pipe Or Weld
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$287,693
Incident datetime
2022-07-27 14:15
Report number
Location
WY
Narrative
On july 27, 2022 a company area supervisor and two other company employees were conducting field site visits on the sussex diesel line when a leak was discovered at gps coordinates - lat: 43.92226, long: -106.01862. The line was not operating at the time the leak was discovered; however, upon discovering the leak, the area supervisor instructed one of the other employees on site to call the control center and ask them to lockout the pipeline so it couldn't be restarted. The area supervisor then called operations management and informed them of the leak and discussed mobilizing resources to the site to expose the line and determine the location and cause of the leak. The area supervisor then isolated the segment by closing the nearest upstream and downstream valves. When the company pipeline maintenance crew arrived on site they began excavating and exposed the pipeline in the area where the leak was suspected. After the line was exposed, they determined the leak was the result of a cracked girth weld and applied a temporary leak clamp until the line could be fully exposed and the segment drained up and cut out. The line was then subsequently drained, fully exposed, and the segment that leaked removed. A metallurgical analysis on the failed girth weld determined the cause of release was due to multiple origin fatigue fracture initiated at the id surface of the failed pipeline with all cracks propagating radially outward towards the od. The initiation and progression of fatigue was very slow and most likely occurred over many years prior to the failure event. A root cause analysis investigation subsequently determined the girth weld failure event most likely occurred on june 11, 2022. Upon assessing the leak site, it was determined it would be best to install a new pipe segment around the leak area to allow for safe excavation of contaminated soils and approximately 2,750 ft. Of new 6" pipe was installed to the southeast of the existing pipeline. No surface water, ground water or wildlife was impacted by the release; however, soil in the leak area was contaminated and will be removed and managed in accordance with wyoming deq requirements. When the leak was discovered it was quickly determined it met state and federal reporting thresholds; therefore, notifications were made to the wyoming deq spill coordinator and the nrc. In addition, courtesy notifications were made to the PHMSA accident investigation division and the PHMSA western region director.
Detailed record list
Report Received Date
2022-08-26 00:00:00
Iyear
2022
Report Number
20220195
Supplemental Number
37414
Report Type
Supplemental Final
Operator Id
Name
Bridger Pipeline Llc
Operator Street Address
455 N. Poplar St.
Operator City Name
Casper
Operator State Abbreviation
WY
Operator Postal Code
82602
Local Datetime
2022-06-11 17:34:00
Time Zone
Mountain
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
1075
Recovered Bbls
965
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2022-07-27 14:15:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Routine Shutdown
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Initial Responder Com Datetime
2022-07-27 15:10:00
On Site Datetime
2022-07-27 14:15:00
Confirmed Discovery Datetime
2022-07-27 14:15:00
Nrc Rpt Datetime
2022-07-27 15:00:00
Nrc Rpt Num
Additional Nrc Report Numbers
1342921, 1343346
Ignite Ind
No
Upstream Action Taken
Valve Closure
Upstream Valve Close Datetime
2022-07-27 15:30:00
Upstream Valve Type Ind
Manual
Downstream Action Taken
Valve Closure
Downstream Vlv Close Datetime
2022-07-27 16:00:00
Downstream Valve Type Ind
Manual
Notify Qualified Indiv Ind
Yes
Qualified Indiv Notif Datetime
2022-07-27 14:18:00
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Sussex Diesel Line
Segment Name
Sussex To Iberlin
Onshore State Abbreviation
Wy
Onshore Postal Code
82639
Onshore City Name
Not Within Municipality
Onshore County Name
Johnson
Designated Location
Milepost
Designated Name
41.85
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
24
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Weld, Including Heat-Affected Zone
Pipe Diameter
6
Pipe Wall Thickness
0.188
Pipe Smys
42000
Pipe Specification
Unknown
Pipe Seam Type
Erw � Unknown Frequency
Pipe Manufacturer
Unknown
Pipe Coating Type
Other
Pipe Coating Details
Polyguard Rd-6 With Sp-6 Outerwrap
Coating Applied Ind
Yes
Weld Subtype
Pipe Girth Weld
Different Girth Weld Ind
No
Installation Year
1968
Manufactured Year
1968
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Crack
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
53000
Est Cost Gas Released
127910
Est Cost Prop Damage
287693
Est Cost Emergency
206190
Est Cost Environmental
205879
Est Cost Other
0
Prpty
880672
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
396
Mop Psig
800
Mop Cfr Section
Subpart E Pressure Test �195.406(A)(3)
Maop Established Date
1997-09-07 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
64339
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
Yes
Cpm In Place Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest Incorrect Action Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Design-, Construction-, Installation-, Or Fabrication-Related
Metallurgical Ind
Yes
Failure Type
Design-, Construction-, Installation-, Or Fabrication-Related
Fatigue Vibr Related
Yes
Failure Subtype
Other
Fatigue Vibr Related Other
Multiple Origin Fatigue Fracture Initiated At The Id Surface Of The Failed Weld
Additional Crack Ind
Yes
Pwf Additional Other Ind
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Geometry Deformation Ind
Yes
Axial Recent Year
2019
Axial Rcnt Propul Method
Free Swimming
Axial Rcnt Attuned Detect
Metal Loss
Axial Rcnt Atnd Dtct Metal
Standard Resolution
Axial Previous Year
2014
Axial Prev Propul Method
Free Swimming
Axial Prev Attuned Detect
Metal Loss
Axial Prev Atnd Dtct Metal
Standard Resolution
Geometry Recent Year
2019
Geometry Rcnt Propul Method
Free Swimming
Geometry Rcnt Resolution
Standard Resolution
Geometrt Rcnt Measur Cups
No Cups
Geometry Previous Year
2014
Geometry Prev Propul Method
Free Swimming
Geometry Prev Resolution
Standard Resolution
Geometrt Prev Measur Cups
No Cups
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
1997
Hydrtst Most Rcnt Pressure
1170
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
D*** T******
Preparer Title
Compliance Coordinator
Preparer Email
D***********@t******.com
Prepared Date
2022-12-02 00:00:00
Authorizer Name
K** D*********
Authorizer Telephone
3072660275
Authorizer Title
Director Compliance
Authorizer Email
K*************@t******.com
Narrative
On july 27, 2022 a company area supervisor and two other company employees were conducting field site visits on the sussex diesel line when a leak was discovered at gps coordinates - lat: 43.92226, long: -106.01862. The line was not operating at the time the leak was discovered; however, upon discovering the leak, the area supervisor instructed one of the other employees on site to call the control center and ask them to lockout the pipeline so it couldn't be restarted. The area supervisor then called operations management and informed them of the leak and discussed mobilizing resources to the site to expose the line and determine the location and cause of the leak. The area supervisor then isolated the segment by closing the nearest upstream and downstream valves. When the company pipeline maintenance crew arrived on site they began excavating and exposed the pipeline in the area where the leak was suspected. After the line was exposed, they determined the leak was the result of a cracked girth weld and applied a temporary leak clamp until the line could be fully exposed and the segment drained up and cut out. The line was then subsequently drained, fully exposed, and the segment that leaked removed. A metallurgical analysis on the failed girth weld determined the cause of release was due to multiple origin fatigue fracture initiated at the id surface of the failed pipeline with all cracks propagating radially outward towards the od. The initiation and progression of fatigue was very slow and most likely occurred over many years prior to the failure event. A root cause analysis investigation subsequently determined the girth weld failure event most likely occurred on june 11, 2022. Upon assessing the leak site, it was determined it would be best to install a new pipe segment around the leak area to allow for safe excavation of contaminated soils and approximately 2,750 ft. Of new 6" pipe was installed to the southeast of the existing pipeline. No surface water, ground water or wildlife was impacted by the release; however, soil in the leak area was contaminated and will be removed and managed in accordance with wyoming deq requirements. When the leak was discovered it was quickly determined it met state and federal reporting thresholds; therefore, notifications were made to the wyoming deq spill coordinator and the nrc. In addition, courtesy notifications were made to the PHMSA accident investigation division and the PHMSA western region director.
Report Received Date 2022-08-26 00:00:00
Iyear 2022
Report Number 20220195
Supplemental Number 37414
Report Type Supplemental Final
Operator Id 31878 PHMSA Enforcement
Name Bridger Pipeline Llc
Operator Street Address 455 N. Poplar St.
Operator City Name Casper
Operator State Abbreviation WY
Operator Postal Code 82602
Local Datetime 2022-06-11 17:34:00
Time Zone Mountain
Daylight Savings Ind Yes
Location Latitude 43.92226 Google Maps OpenStreetMap
Location Longitude -106.01862 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls 1075
Recovered Bbls 965
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2022-07-27 14:15:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Status When Identified Routine Shutdown
Communication State Fed Ind Yes
Party Initiated Communication Operator
Initial Responder Com Datetime 2022-07-27 15:10:00
On Site Datetime 2022-07-27 14:15:00
Confirmed Discovery Datetime 2022-07-27 14:15:00
Nrc Rpt Datetime 2022-07-27 15:00:00
Nrc Rpt Num 1342745 NRC Report How to search
Additional Nrc Report Numbers 1342921, 1343346
Ignite Ind No
Upstream Action Taken Valve Closure
Upstream Valve Close Datetime 2022-07-27 15:30:00
Upstream Valve Type Ind Manual
Downstream Action Taken Valve Closure
Downstream Vlv Close Datetime 2022-07-27 16:00:00
Downstream Valve Type Ind Manual
Notify Qualified Indiv Ind Yes
Qualified Indiv Notif Datetime 2022-07-27 14:18:00
Oil Spill Removal Org Ind No
Num Pub Evacuated 0
Pipe Fac Name Sussex Diesel Line
Segment Name Sussex To Iberlin
Onshore State Abbreviation Wy
Onshore Postal Code 82639
Onshore City Name Not Within Municipality
Onshore County Name Johnson
Designated Location Milepost
Designated Name 41.85
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 24
Crossing No
Pipe Facility Type Interstate
Item Involved Weld, Including Heat-Affected Zone
Pipe Diameter 6
Pipe Wall Thickness 0.188
Pipe Smys 42000
Pipe Specification Unknown
Pipe Seam Type Erw � Unknown Frequency
Pipe Manufacturer Unknown
Pipe Coating Type Other
Pipe Coating Details Polyguard Rd-6 With Sp-6 Outerwrap
Coating Applied Ind Yes
Weld Subtype Pipe Girth Weld
Different Girth Weld Ind No
Installation Year 1968
Manufactured Year 1968
Material Involved Carbon Steel
Release Type Leak
Leak Type Crack
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 53000
Est Cost Gas Released 127910
Est Cost Prop Damage 287693
Est Cost Emergency 206190
Est Cost Environmental 205879
Est Cost Other 0
Prpty 880672
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 396
Mop Psig 800
Mop Cfr Section Subpart E Pressure Test �195.406(A)(3) View CFR 49 §192
Maop Established Date 1997-09-07 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 64339
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind Yes
Cpm In Place Ind No
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind Yes
Invest Incorrect Action Ind Yes
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Material Failure Of Pipe Or Weld
Cause Details Design-, Construction-, Installation-, Or Fabrication-Related
Metallurgical Ind Yes
Failure Type Design-, Construction-, Installation-, Or Fabrication-Related
Fatigue Vibr Related Yes
Failure Subtype Other
Fatigue Vibr Related Other Multiple Origin Fatigue Fracture Initiated At The Id Surface Of The Failed Weld
Additional Crack Ind Yes
Pwf Additional Other Ind Yes
Collected Data Ind Yes
Axial Magnetic Flx Lkg Ind Yes
Geometry Deformation Ind Yes
Axial Recent Year 2019
Axial Rcnt Propul Method Free Swimming
Axial Rcnt Attuned Detect Metal Loss
Axial Rcnt Atnd Dtct Metal Standard Resolution
Axial Previous Year 2014
Axial Prev Propul Method Free Swimming
Axial Prev Attuned Detect Metal Loss
Axial Prev Atnd Dtct Metal Standard Resolution
Geometry Recent Year 2019
Geometry Rcnt Propul Method Free Swimming
Geometry Rcnt Resolution Standard Resolution
Geometrt Rcnt Measur Cups No Cups
Geometry Previous Year 2014
Geometry Prev Propul Method Free Swimming
Geometry Prev Resolution Standard Resolution
Geometrt Prev Measur Cups No Cups
Has Hydrtst Conduc Before Ind Yes
Hydrtst Most Rcnt Year 1997
Hydrtst Most Rcnt Pressure 1170
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name D*** T******
Preparer Title Compliance Coordinator
Preparer Email D***********@t******.com
Prepared Date 2022-12-02 00:00:00
Authorizer Name K** D*********
Authorizer Telephone 3072660275
Authorizer Title Director Compliance
Authorizer Email K*************@t******.com
Narrative On july 27, 2022 a company area supervisor and two other company employees were conducting field site visits on the sussex diesel line when a leak was discovered at gps coordinates - lat: 43.92226, long: -106.01862. The line was not operating at the time the leak was discovered; however, upon discovering the leak, the area supervisor instructed one of the other employees on site to call the control center and ask them to lockout the pipeline so it couldn't be restarted. The area supervisor then called operations management and informed them of the leak and discussed mobilizing resources to the site to expose the line and determine the location and cause of the leak. The area supervisor then isolated the segment by closing the nearest upstream and downstream valves. When the company pipeline maintenance crew arrived on site they began excavating and exposed the pipeline in the area where the leak was suspected. After the line was exposed, they determined the leak was the result of a cracked girth weld and applied a temporary leak clamp until the line could be fully exposed and the segment drained up and cut out. The line was then subsequently drained, fully exposed, and the segment that leaked removed. A metallurgical analysis on the failed girth weld determined the cause of release was due to multiple origin fatigue fracture initiated at the id surface of the failed pipeline with all cracks propagating radially outward towards the od. The initiation and progression of fatigue was very slow and most likely occurred over many years prior to the failure event. A root cause analysis investigation subsequently determined the girth weld failure event most likely occurred on june 11, 2022. Upon assessing the leak site, it was determined it would be best to install a new pipe segment around the leak area to allow for safe excavation of contaminated soils and approximately 2,750 ft. Of new 6" pipe was installed to the southeast of the existing pipeline. No surface water, ground water or wildlife was impacted by the release; however, soil in the leak area was contaminated and will be removed and managed in accordance with wyoming deq requirements. When the leak was discovered it was quickly determined it met state and federal reporting thresholds; therefore, notifications were made to the wyoming deq spill coordinator and the nrc. In addition, courtesy notifications were made to the PHMSA accident investigation division and the PHMSA western region director.