Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2022-07-23 — GA
Operator
Colonial Pipeline Co
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$15,000
Incident datetime
2022-07-23 23:54
Report number
Location
GA
Narrative
On 7/22/22, at approximately 23:46 cst, a colonial operator received a relief alarm from pasadena (pda) and houston station (htn) while shutting down out of kme. An operator conducting a restart inspection observed product being released from the pda relief flow switch and associated conduit box at approximately 00:12 cst. The operator, upon discovery, requested the shut down, isolation and relief of pressure on line 1 (l1) htn station. The shut down was completed and the release was stopped at approximately 00:27 cst. Appropriate notifications were made and additional spill response personnel were mobilized to support spill response activities. Upon further investigation it was determined that the "bellows assembly" on the flow switch had a pinhole leak. The bellows assembly is a component of the relief equipment. A portion of the released product migrated to the adjoining industrial facility. Colonial personnel notified a representative of the adjoining facility and made arrangements to remediate the impacted area. The released volume was recovered and l1 was restarted at approximately 10:05 cst. Based on the released volume and cost of repairs/response, no nrc notification was required. A formal incident analysis (ia) will be conducted for this incident. Prior to installation, the switch had been tested for functional integrity and performed as designed. The investigation found the flow switch was not rated for the maximum flow potential of the relief line and that the standards and specifications were vague in this detail. Colonial will be continuing efforts to evaluate functional parameters of switches.
Detailed record list
Report Received Date
2022-08-22 00:00:00
Iyear
2022
Report Number
20220187
Supplemental Number
37132
Report Type
Supplemental Final
Operator Id
2552
Name
Colonial Pipeline Co
Operator Street Address
1000 Lake St.
Operator City Name
Alpharetta
Operator State Abbreviation
GA
Operator Postal Code
30009
Local Datetime
2022-07-23 23:54:00
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
29.71892
Location Longitude
-95.18025
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
3.6
Recovered Bbls
3
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Ground Patrol By Operator Or Its Contractor
Operator Type
Operator Employee
Incident Identified Datetime
2022-07-23 23:54:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Routine Shutdown
Communication State Fed Ind
No
On Site Datetime
2022-07-23 23:54:00
Confirmed Discovery Datetime
2022-07-23 23:54:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Upstream Action Taken
Operational Control
Upstream Oprtnl Cntrl Detail
Reduce Pressure On The Line Segment
Downstream Action Taken
Valve Closure
Downstream Vlv Close Datetime
2022-07-23 01:10:00
Downstream Valve Type Ind
Manual
Notify Qualified Indiv Ind
Yes
Qualified Indiv Notif Datetime
2022-07-23 01:29:00
Oil Spill Removal Org Ind
Yes
Osro Activated Datetime
2022-07-23 02:51:00
Osro Arrived On Site Dt
7/23/2022 5:15
Num Pub Evacuated
0
Pipe Fac Name
Houston Area
Segment Name
2294
Onshore State Abbreviation
Tx
Onshore Postal Code
77506
Onshore City Name
Pasadena
Onshore County Name
Harris
Designated Location
Survey Station No.
Designated Name
120
Federal
No
Location Type
Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Relief Line And Relief Equipment
Installation Year
2022
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Other
Leak Type Other
Bellow's Assembly Split Open
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Usa Drinking Ind
Yes
Usa Drinking Yes No
Yes
Est Cost Oper Paid
2000
Est Cost Gas Released
556
Est Cost Prop Damage
15000
Est Cost Emergency
10000
Est Cost Environmental
10000
Est Cost Other
0
Prpty
37556
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
141
Mop Psig
275
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
1979-10-01 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Malfunction Of Control/relief Equipment
Eq Failure Type
Malfunction Of Control/relief Equipment
Other Control Relief Ind
Yes
Other Control Relief Details
Flow Switch
Eq Additional Other Ind
Yes
Eq Additional Other Details
Bellow's Assembly Flow Switch Failure
Preparer Name
R***** D*****
Preparer Title
Compliance Coordinator
Preparer Email
R******@c******.com
Preparer Telephone
4097904288
Prepared Date
2022-09-19 00:00:00
Local Contact Name
R***** D*****
Local Contact Email
R******@c******.com
Local Contact Telephone
4097904288
Authorizer Name
Q****** F******
Authorizer Telephone
7706879672
Authorizer Title
Pipeline Compliance Director
Authorizer Email
Q*******@c******.com
Narrative
On 7/22/22, at approximately 23:46 cst, a colonial operator received a relief alarm from pasadena (pda) and houston station (htn) while shutting down out of kme. An operator conducting a restart inspection observed product being released from the pda relief flow switch and associated conduit box at approximately 00:12 cst. The operator, upon discovery, requested the shut down, isolation and relief of pressure on line 1 (l1) htn station. The shut down was completed and the release was stopped at approximately 00:27 cst. Appropriate notifications were made and additional spill response personnel were mobilized to support spill response activities. Upon further investigation it was determined that the "bellows assembly" on the flow switch had a pinhole leak. The bellows assembly is a component of the relief equipment. A portion of the released product migrated to the adjoining industrial facility. Colonial personnel notified a representative of the adjoining facility and made arrangements to remediate the impacted area. The released volume was recovered and l1 was restarted at approximately 10:05 cst. Based on the released volume and cost of repairs/response, no nrc notification was required. A formal incident analysis (ia) will be conducted for this incident. Prior to installation, the switch had been tested for functional integrity and performed as designed. The investigation found the flow switch was not rated for the maximum flow potential of the relief line and that the standards and specifications were vague in this detail. Colonial will be continuing efforts to evaluate functional parameters of switches.
| Report Received Date | 2022-08-22 00:00:00 |
|---|---|
| Iyear | 2022 |
| Report Number | 20220187 |
| Supplemental Number | 37132 |
| Report Type | Supplemental Final |
| Operator Id | 2552 PHMSA Enforcement |
| Name | Colonial Pipeline Co |
| Operator Street Address | 1000 Lake St. |
| Operator City Name | Alpharetta |
| Operator State Abbreviation | GA |
| Operator Postal Code | 30009 |
| Local Datetime | 2022-07-23 23:54:00 |
| Time Zone | Central |
| Daylight Savings Ind | Yes |
| Location Latitude | 29.71892 Google Maps OpenStreetMap |
| Location Longitude | -95.18025 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Gasoline (Non-Ethanol) |
| Unintentional Release Bbls | 3.6 |
| Recovered Bbls | 3 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Ground Patrol By Operator Or Its Contractor |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2022-07-23 23:54:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Status When Identified | Routine Shutdown |
| Communication State Fed Ind | No |
| On Site Datetime | 2022-07-23 23:54:00 |
| Confirmed Discovery Datetime | 2022-07-23 23:54:00 |
| Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
| Ignite Ind | No |
| Upstream Action Taken | Operational Control |
| Upstream Oprtnl Cntrl Detail | Reduce Pressure On The Line Segment |
| Downstream Action Taken | Valve Closure |
| Downstream Vlv Close Datetime | 2022-07-23 01:10:00 |
| Downstream Valve Type Ind | Manual |
| Notify Qualified Indiv Ind | Yes |
| Qualified Indiv Notif Datetime | 2022-07-23 01:29:00 |
| Oil Spill Removal Org Ind | Yes |
| Osro Activated Datetime | 2022-07-23 02:51:00 |
| Osro Arrived On Site Dt | 7/23/2022 5:15 |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Houston Area |
| Segment Name | 2294 |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 77506 |
| Onshore City Name | Pasadena |
| Onshore County Name | Harris |
| Designated Location | Survey Station No. |
| Designated Name | 120 |
| Federal | No |
| Location Type | Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Relief Line And Relief Equipment |
| Installation Year | 2022 |
| Manufactured Year | Unknown |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Other |
| Leak Type Other | Bellow's Assembly Split Open |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| High Pop Ind | Yes |
| High Pop Yes No | Yes |
| Usa Drinking Ind | Yes |
| Usa Drinking Yes No | Yes |
| Est Cost Oper Paid | 2000 |
| Est Cost Gas Released | 556 |
| Est Cost Prop Damage | 15000 |
| Est Cost Emergency | 10000 |
| Est Cost Environmental | 10000 |
| Est Cost Other | 0 |
| Prpty | 37556 |
| Num Persons Hosp Not Ovnght | 0 |
| Num Injured Treated By Emt | 0 |
| Num Resident Building Affctd | 0 |
| Num Business Building Affctd | 0 |
| Accident Psig | 141 |
| Mop Psig | 275 |
| Mop Cfr Section | Component Design Pressure �195.406(A)(2) View CFR 49 §192 |
| Maop Established Date | 1979-10-01 00:00:00 |
| Maop Reversal Flow Ind | No |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | Yes |
| Scada Conf Ind | Yes |
| Cpm In Place Ind | No |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest No Controller Ind | Yes |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Malfunction Of Control/relief Equipment |
| Eq Failure Type | Malfunction Of Control/relief Equipment |
| Other Control Relief Ind | Yes |
| Other Control Relief Details | Flow Switch |
| Eq Additional Other Ind | Yes |
| Eq Additional Other Details | Bellow's Assembly Flow Switch Failure |
| Preparer Name | R***** D***** |
| Preparer Title | Compliance Coordinator |
| Preparer Email | R******@c******.com |
| Preparer Telephone | 4097904288 |
| Prepared Date | 2022-09-19 00:00:00 |
| Local Contact Name | R***** D***** |
| Local Contact Email | R******@c******.com |
| Local Contact Telephone | 4097904288 |
| Authorizer Name | Q****** F****** |
| Authorizer Telephone | 7706879672 |
| Authorizer Title | Pipeline Compliance Director |
| Authorizer Email | Q*******@c******.com |
| Narrative | On 7/22/22, at approximately 23:46 cst, a colonial operator received a relief alarm from pasadena (pda) and houston station (htn) while shutting down out of kme. An operator conducting a restart inspection observed product being released from the pda relief flow switch and associated conduit box at approximately 00:12 cst. The operator, upon discovery, requested the shut down, isolation and relief of pressure on line 1 (l1) htn station. The shut down was completed and the release was stopped at approximately 00:27 cst. Appropriate notifications were made and additional spill response personnel were mobilized to support spill response activities. Upon further investigation it was determined that the "bellows assembly" on the flow switch had a pinhole leak. The bellows assembly is a component of the relief equipment. A portion of the released product migrated to the adjoining industrial facility. Colonial personnel notified a representative of the adjoining facility and made arrangements to remediate the impacted area. The released volume was recovered and l1 was restarted at approximately 10:05 cst. Based on the released volume and cost of repairs/response, no nrc notification was required. A formal incident analysis (ia) will be conducted for this incident. Prior to installation, the switch had been tested for functional integrity and performed as designed. The investigation found the flow switch was not rated for the maximum flow potential of the relief line and that the standards and specifications were vague in this detail. Colonial will be continuing efforts to evaluate functional parameters of switches. |