Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2022-07-08 — TX
Operator
Enterprise Crude Pipeline Llc
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$30,000
Incident datetime
2022-07-08 08:00
Report number
Location
TX
Narrative
On 7/8/2022 at 08:00 cdt an enterprise pipeline technician arrived at ivie lake pump station and observed crude misting from underneath the bonnet of inlet suction valve mov 2001. The line was shut down at 08:18 to isolate for repairs. The o-ring between the valve bonnet and body was found to be damaged and was replaced. The line was restarted on 7/8/2022 at 21:01. Trrc incident #2653
Detailed record list
Report Received Date
2022-08-05 00:00:00
Iyear
2022
Report Number
20220169
Supplemental Number
37119
Report Type
Supplemental Final
Operator Id
30829
Name
Enterprise Crude Pipeline Llc
Operator Street Address
1100 Louisiana Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2022-07-08 08:32:00
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
31.487194
Location Longitude
-99.6953
Commodity Released Type
Crude Oil
Unintentional Release Bbls
1
Recovered Bbls
1
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2022-07-08 08:00:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2022-07-08 08:18:00
Restart Datetime
2022-07-08 21:01:00
Communication State Fed Ind
No
On Site Datetime
2022-07-08 08:00:00
Confirmed Discovery Datetime
2022-07-08 08:00:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Notify Qualified Indiv Ind
No
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Midland To Sealy Pipeline
Segment Name
Ivie Lake Pump Station
Onshore State Abbreviation
Tx
Onshore Postal Code
76862
Onshore City Name
Millersview
Onshore County Name
Concho
Designated Location
Milepost
Designated Name
68.49
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Valve
Valve Type
Auxiliary Or Other Valve
Installation Year
2019
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
105
Est Cost Prop Damage
30000
Est Cost Emergency
1400
Est Cost Environmental
0
Est Cost Other
0
Prpty
31505
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
94.02
Mop Psig
1480
Mop Cfr Section
Subpart E Pressure Test �195.406(A)(3)
Maop Established Date
2017-10-12 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Neither controller nor control room contributed to the accident.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Other Non Threaded Ind
O-Ring
Eq Additional Other Ind
Yes
Eq Additional Other Details
Normal Wear That Occurs Over The Service Life Of The O-Ring
Preparer Name
T****** A* G********
Preparer Title
Senior Staff Pipeline Compliance Engineer
Preparer Email
T**********@e****.com
Preparer Telephone
713-381-6433
Prepared Date
2022-09-16 00:00:00
Local Contact Name
T****** A* G********
Local Contact Email
T**********@e****.com
Local Contact Telephone
713-381-6433
Authorizer Name
T****** A* G********
Authorizer Telephone
713-381-6433
Authorizer Title
Senior Staff Pipeline Compliance Engineer
Authorizer Email
T**********@e****.com
Narrative
On 7/8/2022 at 08:00 cdt an enterprise pipeline technician arrived at ivie lake pump station and observed crude misting from underneath the bonnet of inlet suction valve mov 2001. The line was shut down at 08:18 to isolate for repairs. The o-ring between the valve bonnet and body was found to be damaged and was replaced. The line was restarted on 7/8/2022 at 21:01. Trrc incident #2653
| Report Received Date | 2022-08-05 00:00:00 |
|---|---|
| Iyear | 2022 |
| Report Number | 20220169 |
| Supplemental Number | 37119 |
| Report Type | Supplemental Final |
| Operator Id | 30829 PHMSA Enforcement |
| Name | Enterprise Crude Pipeline Llc |
| Operator Street Address | 1100 Louisiana Street |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2022-07-08 08:32:00 |
| Time Zone | Central |
| Daylight Savings Ind | Yes |
| Location Latitude | 31.487194 Google Maps OpenStreetMap |
| Location Longitude | -99.6953 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 1 |
| Recovered Bbls | 1 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2022-07-08 08:00:00 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2022-07-08 08:18:00 |
| Restart Datetime | 2022-07-08 21:01:00 |
| Communication State Fed Ind | No |
| On Site Datetime | 2022-07-08 08:00:00 |
| Confirmed Discovery Datetime | 2022-07-08 08:00:00 |
| Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
| Ignite Ind | No |
| Notify Qualified Indiv Ind | No |
| Oil Spill Removal Org Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Midland To Sealy Pipeline |
| Segment Name | Ivie Lake Pump Station |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 76862 |
| Onshore City Name | Millersview |
| Onshore County Name | Concho |
| Designated Location | Milepost |
| Designated Name | 68.49 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Valve |
| Valve Type | Auxiliary Or Other Valve |
| Installation Year | 2019 |
| Manufactured Year | Unknown |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Seal Or Packing |
| Wildlife Impact Ind | No |
| Soil Contamination | No |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 105 |
| Est Cost Prop Damage | 30000 |
| Est Cost Emergency | 1400 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 31505 |
| Num Persons Hosp Not Ovnght | 0 |
| Num Injured Treated By Emt | 0 |
| Num Resident Building Affctd | 0 |
| Num Business Building Affctd | 0 |
| Accident Psig | 94.02 |
| Mop Psig | 1480 |
| Mop Cfr Section | Subpart E Pressure Test �195.406(A)(3) View CFR 49 §192 |
| Maop Established Date | 2017-10-12 00:00:00 |
| Maop Reversal Flow Ind | No |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Neither controller nor control room contributed to the accident. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Non-Threaded Connection Failure |
| Eq Failure Type | Non-Threaded Connection Failure |
| Other Non Threaded Ind | O-Ring |
| Eq Additional Other Ind | Yes |
| Eq Additional Other Details | Normal Wear That Occurs Over The Service Life Of The O-Ring |
| Preparer Name | T****** A* G******** |
| Preparer Title | Senior Staff Pipeline Compliance Engineer |
| Preparer Email | T**********@e****.com |
| Preparer Telephone | 713-381-6433 |
| Prepared Date | 2022-09-16 00:00:00 |
| Local Contact Name | T****** A* G******** |
| Local Contact Email | T**********@e****.com |
| Local Contact Telephone | 713-381-6433 |
| Authorizer Name | T****** A* G******** |
| Authorizer Telephone | 713-381-6433 |
| Authorizer Title | Senior Staff Pipeline Compliance Engineer |
| Authorizer Email | T**********@e****.com |
| Narrative | On 7/8/2022 at 08:00 cdt an enterprise pipeline technician arrived at ivie lake pump station and observed crude misting from underneath the bonnet of inlet suction valve mov 2001. The line was shut down at 08:18 to isolate for repairs. The o-ring between the valve bonnet and body was found to be damaged and was replaced. The line was restarted on 7/8/2022 at 21:01. Trrc incident #2653 |