HL incident on 2022-06-19 — TX

Operator
Centurion Pipeline L.p.
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$13,000
Incident datetime
2022-06-19 14:00
Report number
Location
TX
Narrative
On june 19, 2022, a third party notified centurion pipeline, l.P. On the terrell to caprock segment near odessa, texas in ector county, texas. Cpl's employee arrived on site at 2:00pm and confirmed a leak on the terrell to caprock segment approximately one mile north of cpl's terrell station. Cpl isolated the leak by turning off the lact units on the terrell to caprock segment. Cpl reported the leak to texas railroad commission (trrc) at 02:26pm. One (1) barrel of crude oil was released and recovered. No injuries, fatalities or fires were associated with this incident. Repairs have been completed and anticipated completion of backfill is july 26th, 2022. The root cause failure analysis is ongoing. The resulting information related to the cause, preventative and mitigative measures (p&m), and update to costs, if applicable will be submitted via supplemental reports. Supplemental report filed on august 16, 2022: corrected parts c.3g. And e.2. To reflect accurate information. Cpl determined that rock debris shielded the cathodic protection (cp) which caused external corrosion and scale buildup. The scale buildup on the outside diameter (od) further shielded the cp and exacerbated the external corrosion damage. During the backfill of the permanent repair, the rock debris was removed and no further actions are required.
Detailed record list
Report Received Date
2022-07-18 00:00:00
Iyear
2022
Report Number
20220153
Supplemental Number
36980
Report Type
Supplemental Final
Operator Id
Name
Centurion Pipeline L.p.
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2022-06-19 14:00:00
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
1
Recovered Bbls
1
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Other
Accident Details
Third Party Operator
Incident Identified Datetime
2022-06-19 14:00:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2022-06-19 14:00:00
Restart Datetime
2022-06-19 14:00:00
Communication State Fed Ind
No
On Site Datetime
2022-06-19 14:00:00
Confirmed Discovery Datetime
2022-06-19 14:00:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Upstream Action Taken
Operational Control
Upstream Oprtnl Cntrl Detail
Lact Unit Shut Down.
Downstream Action Taken
Operational Control
Downstream Oprtnl Cntrl Detail
Lact Unit Shut Down.
Notify Qualified Indiv Ind
Yes
Qualified Indiv Notif Datetime
2022-06-19 14:00:00
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Cowden South
Segment Name
Terrell To Caprock
Onshore State Abbreviation
Tx
Onshore Postal Code
79766
Onshore City Name
Odessa
Onshore County Name
Ector
Designated Location
Milepost
Designated Name
Mp1.0
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
10
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
6
Pipe Wall Thickness
0.28
Pipe Smys
35000
Pipe Specification
Unknown
Pipe Seam Type
Erw � Unknown Frequency
Pipe Manufacturer
Unknown
Pipe Coating Type
Coal Tar
Coating Applied Ind
Unknown
Installation Year
1957
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
110
Est Cost Prop Damage
13000
Est Cost Emergency
2750
Est Cost Environmental
0
Est Cost Other
0
Prpty
15860
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
70
Mop Psig
400
Mop Cfr Section
Subpart E Pressure Test �195.406(A)(3)
Maop Established Date
1998-01-01 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Gathering
Scada In Place Ind
No
Cpm In Place Ind
No
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
External Corrosion
Internal External
External Corrosion
Visual Exam Results
Localized Pitting
Other Corrosion Ind
Yes
Corrosion Type Details
Shield Cathodic Protection
Field Exam Basis Ind
Yes
Underground Location
Yes
Under Cathodic Protection Ind
Yes
Cathodic Pro Start Year
2004
Shielding Evident
Yes
Cathodic Survey Type
Yes
Cp Annual Survey Ind
Yes
Close Interval Survey Ind
Yes
Cp Annual Survey Year
2022
Close Interval Survey Year
2022
Prior Damage
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Axial Recent Year
2020
Axial Rcnt Propul Method
Free Swimming
Axial Rcnt Attuned Detect
Metal Loss
Axial Rcnt Atnd Dtct Metal
Standard Resolution
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
Y**** T*
Preparer Title
Pipeline Compliance Program Advisor
Preparer Email
Y******@c**********.com
Preparer Telephone
346-803-2718
Prepared Date
2022-08-16 00:00:00
Authorizer Name
T***** D*****
Authorizer Telephone
346-803-2830
Authorizer Title
Manager Compliance
Authorizer Email
T************@c**********.com
Narrative
On june 19, 2022, a third party notified centurion pipeline, l.P. On the terrell to caprock segment near odessa, texas in ector county, texas. Cpl's employee arrived on site at 2:00pm and confirmed a leak on the terrell to caprock segment approximately one mile north of cpl's terrell station. Cpl isolated the leak by turning off the lact units on the terrell to caprock segment. Cpl reported the leak to texas railroad commission (trrc) at 02:26pm. One (1) barrel of crude oil was released and recovered. No injuries, fatalities or fires were associated with this incident. Repairs have been completed and anticipated completion of backfill is july 26th, 2022. The root cause failure analysis is ongoing. The resulting information related to the cause, preventative and mitigative measures (p&m), and update to costs, if applicable will be submitted via supplemental reports. Supplemental report filed on august 16, 2022: corrected parts c.3g. And e.2. To reflect accurate information. Cpl determined that rock debris shielded the cathodic protection (cp) which caused external corrosion and scale buildup. The scale buildup on the outside diameter (od) further shielded the cp and exacerbated the external corrosion damage. During the backfill of the permanent repair, the rock debris was removed and no further actions are required.
Report Received Date 2022-07-18 00:00:00
Iyear 2022
Report Number 20220153
Supplemental Number 36980
Report Type Supplemental Final
Operator Id 31888 PHMSA Enforcement
Name Centurion Pipeline L.p.
Operator Street Address 1300 Main Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2022-06-19 14:00:00
Time Zone Central
Daylight Savings Ind Yes
Location Latitude 31.792969 Google Maps OpenStreetMap
Location Longitude -102.392925 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 1
Recovered Bbls 1
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Other
Accident Details Third Party Operator
Incident Identified Datetime 2022-06-19 14:00:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind Yes
Shutdown Datetime 2022-06-19 14:00:00
Restart Datetime 2022-06-19 14:00:00
Communication State Fed Ind No
On Site Datetime 2022-06-19 14:00:00
Confirmed Discovery Datetime 2022-06-19 14:00:00
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Upstream Action Taken Operational Control
Upstream Oprtnl Cntrl Detail Lact Unit Shut Down.
Downstream Action Taken Operational Control
Downstream Oprtnl Cntrl Detail Lact Unit Shut Down.
Notify Qualified Indiv Ind Yes
Qualified Indiv Notif Datetime 2022-06-19 14:00:00
Oil Spill Removal Org Ind No
Num Pub Evacuated 0
Pipe Fac Name Cowden South
Segment Name Terrell To Caprock
Onshore State Abbreviation Tx
Onshore Postal Code 79766
Onshore City Name Odessa
Onshore County Name Ector
Designated Location Milepost
Designated Name Mp1.0
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 10
Crossing No
Pipe Facility Type Intrastate
Item Involved Pipe
Pipe Type Pipe Body
Puddle Weld Ind No
Pipe Diameter 6
Pipe Wall Thickness 0.28
Pipe Smys 35000
Pipe Specification Unknown
Pipe Seam Type Erw � Unknown Frequency
Pipe Manufacturer Unknown
Pipe Coating Type Coal Tar
Coating Applied Ind Unknown
Installation Year 1957
Manufactured Year Unknown
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 110
Est Cost Prop Damage 13000
Est Cost Emergency 2750
Est Cost Environmental 0
Est Cost Other 0
Prpty 15860
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 70
Mop Psig 400
Mop Cfr Section Subpart E Pressure Test �195.406(A)(3) View CFR 49 §192
Maop Established Date 1998-01-01 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Gathering
Scada In Place Ind No
Cpm In Place Ind No
Investigation Status No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details External Corrosion
Internal External External Corrosion
Visual Exam Results Localized Pitting
Other Corrosion Ind Yes
Corrosion Type Details Shield Cathodic Protection
Field Exam Basis Ind Yes
Underground Location Yes
Under Cathodic Protection Ind Yes
Cathodic Pro Start Year 2004
Shielding Evident Yes
Cathodic Survey Type Yes
Cp Annual Survey Ind Yes
Close Interval Survey Ind Yes
Cp Annual Survey Year 2022
Close Interval Survey Year 2022
Prior Damage Yes
Collected Data Ind Yes
Axial Magnetic Flx Lkg Ind Yes
Axial Recent Year 2020
Axial Rcnt Propul Method Free Swimming
Axial Rcnt Attuned Detect Metal Loss
Axial Rcnt Atnd Dtct Metal Standard Resolution
Has Hydrtst Conduc Before Ind No
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name Y**** T*
Preparer Title Pipeline Compliance Program Advisor
Preparer Email Y******@c**********.com
Preparer Telephone 346-803-2718
Prepared Date 2022-08-16 00:00:00
Authorizer Name T***** D*****
Authorizer Telephone 346-803-2830
Authorizer Title Manager Compliance
Authorizer Email T************@c**********.com
Narrative On june 19, 2022, a third party notified centurion pipeline, l.P. On the terrell to caprock segment near odessa, texas in ector county, texas. Cpl's employee arrived on site at 2:00pm and confirmed a leak on the terrell to caprock segment approximately one mile north of cpl's terrell station. Cpl isolated the leak by turning off the lact units on the terrell to caprock segment. Cpl reported the leak to texas railroad commission (trrc) at 02:26pm. One (1) barrel of crude oil was released and recovered. No injuries, fatalities or fires were associated with this incident. Repairs have been completed and anticipated completion of backfill is july 26th, 2022. The root cause failure analysis is ongoing. The resulting information related to the cause, preventative and mitigative measures (p&m), and update to costs, if applicable will be submitted via supplemental reports. Supplemental report filed on august 16, 2022: corrected parts c.3g. And e.2. To reflect accurate information. Cpl determined that rock debris shielded the cathodic protection (cp) which caused external corrosion and scale buildup. The scale buildup on the outside diameter (od) further shielded the cp and exacerbated the external corrosion damage. During the backfill of the permanent repair, the rock debris was removed and no further actions are required.