HL incident on 2022-06-27 — OH

Operator
Marathon Pipe Line Llc
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$0
Incident datetime
2022-06-27 21:15
Report number
Location
OH
Narrative
On june 27, 2022 at 21:15 hrs. Mt, the mpl control room was completing routine camera checks of the ft. Laramie station and noticed a crude oil release that was entirely contained within the station near pump unit #1. Immediate actions were taken by the controller to shut down the wamsutter-ft. Laramie 8-inch pipeline and to notify local operations. Local operations personnel immediately dispatched to the station, arriving on june 28th at 1:00 hrs. Mt. Upon arrival, mpl operations confirmed the release and took actions to clean it up. A failed stud on the valve cylinder cap of the pump was identified as the source of the leak. It was determined that the stud failed because it had been manufactured out of round by 15 thousandths of an inch, an indication that the stud had been over-torqued during the manufacturing process. Mpl worked with the manufacturer to ensure that appropriate actions were taken to replace the faulty studs. Once the studs were replaced and it was determined that the pump had been adequately repaired, the pipeline was restarted on july 1, 2022 at 18:33 hrs mt. August 9, 2022 update - no additional changes, report is submitted as final.
Detailed record list
Report Received Date
2022-07-08 00:00:00
Iyear
2022
Report Number
20220145
Supplemental Number
36990
Report Type
Supplemental Final
Operator Id
Name
Marathon Pipe Line Llc
Operator Street Address
539 South Main Street
Operator City Name
Findlay
Operator State Abbreviation
OH
Operator Postal Code
45840
Local Datetime
2022-06-27 21:15:00
Time Zone
Mountain
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
7.5
Recovered Bbls
7.5
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Controller
Operator Type
Operator Employee
Incident Identified Datetime
2022-06-27 21:15:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2022-06-27 21:19:00
Restart Datetime
2022-07-01 18:36:00
Communication State Fed Ind
No
On Site Datetime
2022-06-28 01:00:00
Confirmed Discovery Datetime
2022-06-28 01:05:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Notify Qualified Indiv Ind
No
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Wamsutter-Ft. Laramie 8-Inch Crude (Slcc)
Segment Name
Ft. Laramie Station
Onshore State Abbreviation
Wy
Onshore Postal Code
82223
Onshore City Name
Not Within A Municipality
Onshore County Name
Goshen County
Designated Location
Milepost
Designated Name
Ft Lar. Sta
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pump
Pump Type
Positive Displacement
Pump Service Type
Mainline
Installation Year
2022
Manufactured Year
2021
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Other
Leak Type Other
Stud On Pump Sheared Off.
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
150
Est Cost Prop Damage
0
Est Cost Emergency
0
Est Cost Environmental
16500
Est Cost Other
0
Prpty
16650
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
1616
Mop Psig
2220
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
2022-02-18 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The release was attributed to faulty bolts on the piston cap studs on the manufactured pump.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Pump Or Pump-Related Equipment
Eq Failure Type
Pump Or Pump-Related Equipment
Other Pump Ind
Other
Other Pump Details
Stud On Pump Sheared Off.
Additional Defect Ind
Yes
Preparer Name
J*** M*****
Preparer Email
J******@m****************.com
Preparer Telephone
6513489017
Prepared Date
2022-08-18 00:00:00
Authorizer Name
A**** M*******
Authorizer Telephone
12106266343
Authorizer Email
A*********@m****************.com
Narrative
On june 27, 2022 at 21:15 hrs. Mt, the mpl control room was completing routine camera checks of the ft. Laramie station and noticed a crude oil release that was entirely contained within the station near pump unit #1. Immediate actions were taken by the controller to shut down the wamsutter-ft. Laramie 8-inch pipeline and to notify local operations. Local operations personnel immediately dispatched to the station, arriving on june 28th at 1:00 hrs. Mt. Upon arrival, mpl operations confirmed the release and took actions to clean it up. A failed stud on the valve cylinder cap of the pump was identified as the source of the leak. It was determined that the stud failed because it had been manufactured out of round by 15 thousandths of an inch, an indication that the stud had been over-torqued during the manufacturing process. Mpl worked with the manufacturer to ensure that appropriate actions were taken to replace the faulty studs. Once the studs were replaced and it was determined that the pump had been adequately repaired, the pipeline was restarted on july 1, 2022 at 18:33 hrs mt. August 9, 2022 update - no additional changes, report is submitted as final.
Report Received Date 2022-07-08 00:00:00
Iyear 2022
Report Number 20220145
Supplemental Number 36990
Report Type Supplemental Final
Operator Id 32147 PHMSA Enforcement
Name Marathon Pipe Line Llc
Operator Street Address 539 South Main Street
Operator City Name Findlay
Operator State Abbreviation OH
Operator Postal Code 45840
Local Datetime 2022-06-27 21:15:00
Time Zone Mountain
Daylight Savings Ind Yes
Location Latitude 42.208021 Google Maps OpenStreetMap
Location Longitude -104.513677 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 7.5
Recovered Bbls 7.5
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Controller
Operator Type Operator Employee
Incident Identified Datetime 2022-06-27 21:15:00
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind Yes
Shutdown Datetime 2022-06-27 21:19:00
Restart Datetime 2022-07-01 18:36:00
Communication State Fed Ind No
On Site Datetime 2022-06-28 01:00:00
Confirmed Discovery Datetime 2022-06-28 01:05:00
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Notify Qualified Indiv Ind No
Oil Spill Removal Org Ind No
Num Pub Evacuated 0
Pipe Fac Name Wamsutter-Ft. Laramie 8-Inch Crude (Slcc)
Segment Name Ft. Laramie Station
Onshore State Abbreviation Wy
Onshore Postal Code 82223
Onshore City Name Not Within A Municipality
Onshore County Name Goshen County
Designated Location Milepost
Designated Name Ft Lar. Sta
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Interstate
Item Involved Pump
Pump Type Positive Displacement
Pump Service Type Mainline
Installation Year 2022
Manufactured Year 2021
Material Involved Carbon Steel
Release Type Leak
Leak Type Other
Leak Type Other Stud On Pump Sheared Off.
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 150
Est Cost Prop Damage 0
Est Cost Emergency 0
Est Cost Environmental 16500
Est Cost Other 0
Prpty 16650
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 1616
Mop Psig 2220
Mop Cfr Section Component Design Pressure �195.406(A)(2) View CFR 49 §192
Maop Established Date 2022-02-18 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details The release was attributed to faulty bolts on the piston cap studs on the manufactured pump.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Pump Or Pump-Related Equipment
Eq Failure Type Pump Or Pump-Related Equipment
Other Pump Ind Other
Other Pump Details Stud On Pump Sheared Off.
Additional Defect Ind Yes
Preparer Name J*** M*****
Preparer Email J******@m****************.com
Preparer Telephone 6513489017
Prepared Date 2022-08-18 00:00:00
Authorizer Name A**** M*******
Authorizer Telephone 12106266343
Authorizer Email A*********@m****************.com
Narrative On june 27, 2022 at 21:15 hrs. Mt, the mpl control room was completing routine camera checks of the ft. Laramie station and noticed a crude oil release that was entirely contained within the station near pump unit #1. Immediate actions were taken by the controller to shut down the wamsutter-ft. Laramie 8-inch pipeline and to notify local operations. Local operations personnel immediately dispatched to the station, arriving on june 28th at 1:00 hrs. Mt. Upon arrival, mpl operations confirmed the release and took actions to clean it up. A failed stud on the valve cylinder cap of the pump was identified as the source of the leak. It was determined that the stud failed because it had been manufactured out of round by 15 thousandths of an inch, an indication that the stud had been over-torqued during the manufacturing process. Mpl worked with the manufacturer to ensure that appropriate actions were taken to replace the faulty studs. Once the studs were replaced and it was determined that the pump had been adequately repaired, the pipeline was restarted on july 1, 2022 at 18:33 hrs mt. August 9, 2022 update - no additional changes, report is submitted as final.