Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2022-06-09 — TX
Operator
Shell Pipeline Co., L.p.
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$336,524
Incident datetime
2022-06-09 00:30
Report number
Location
TX
Narrative
On 6/9/22, around 12:30 am, an operator was dispatched to check an excessive sump pump running alarm at colex east tank farm. After checking the sump pump, the operator made a round by the manifold and discovered a small puddle of gasoline collecting near the interface of some below-ground piping. The operator notified supervision and it was determined to keep an eye on the location until daylight for further evaluation. At 7:40 the same day, it was determined to dig up the area and locate the source of the leak, and this time it was identified the costs would exceed $50k, and then the call to the nrc was made. Concerning cpm, the leak occurred on facility piping near the manifold and that doesn't fall under the cpm installed. In saying that, there is terminal balance leak detection primarily based on the ehh on the tanks. This system is designed to pick up a much larger release. After the investigation, it was determined the gasket failed from improper alignment from the original installation date.
Detailed record list
Report Received Date
2022-07-07 00:00:00
Iyear
2022
Report Number
20220142
Supplemental Number
37005
Report Type
Supplemental Final
Operator Id
31174
Name
Shell Pipeline Co., L.p.
Operator Street Address
150 North Dairy Ashford Road Wck Bldg. A
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77079
Local Datetime
2022-06-09 07:40:00
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
29.71722
Location Longitude
-95.17361
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
2.1
Recovered Bbls
2.1
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Or Pack Calculations)
Incident Identified Datetime
2022-06-09 00:30:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2022-06-09 00:45:00
Restart Datetime
2022-07-07 08:00:00
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Initial Responder Com Datetime
2022-06-09 08:05:00
On Site Datetime
2022-06-09 00:30:00
Confirmed Discovery Datetime
2022-06-09 00:40:00
Nrc Rpt Datetime
2022-06-09 08:40:00
Nrc Rpt Num
1338227
Additional Nrc Report Numbers
1338460
Ignite Ind
No
Notify Qualified Indiv Ind
Yes
Qualified Indiv Notif Datetime
2022-06-09 07:40:00
Oil Spill Removal Org Ind
Yes
Osro Activated Datetime
2022-06-09 08:10:00
Osro Arrived On Site Dt
6/9/2022 9:10
Num Pub Evacuated
0
Pipe Fac Name
Colex East Tank Farm
Segment Name
Colex East Tank Farm
Onshore State Abbreviation
Tx
Onshore Postal Code
77506
Onshore City Name
Pasadena
Onshore County Name
Harris
Designated Location
Survey Station No.
Designated Name
Colex East
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
144
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Flange Assembly
Installation Year
1973
Manufactured Year
1973
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Connection Failure
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Usa Drinking Ind
Yes
Usa Drinking Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
400
Est Cost Prop Damage
336524
Est Cost Emergency
91076
Est Cost Environmental
0
Est Cost Other
0
Prpty
428000
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
30
Mop Psig
275
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
1973-01-01 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
Yes, but the investigation of the control room and/or controller actions has not yet been completed by the operator (supplemental report required)
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Other Non Threaded Ind
Gasket
Ief Addl Misalignment Ind
Yes
Preparer Name
J***** H*****
Preparer Title
Operations Support Coordinator
Preparer Email
J************@s****.com
Preparer Telephone
4095402781
Prepared Date
2022-08-22 00:00:00
Local Contact Name
J***** H*****
Local Contact Email
J************@s****.com
Local Contact Telephone
4095402781
Authorizer Name
D****** P****
Authorizer Telephone
832-762-2553
Authorizer Title
Integrity And Regulatory Services Manager
Authorizer Email
D************@s****.com
Narrative
On 6/9/22, around 12:30 am, an operator was dispatched to check an excessive sump pump running alarm at colex east tank farm. After checking the sump pump, the operator made a round by the manifold and discovered a small puddle of gasoline collecting near the interface of some below-ground piping. The operator notified supervision and it was determined to keep an eye on the location until daylight for further evaluation. At 7:40 the same day, it was determined to dig up the area and locate the source of the leak, and this time it was identified the costs would exceed $50k, and then the call to the nrc was made. Concerning cpm, the leak occurred on facility piping near the manifold and that doesn't fall under the cpm installed. In saying that, there is terminal balance leak detection primarily based on the ehh on the tanks. This system is designed to pick up a much larger release. After the investigation, it was determined the gasket failed from improper alignment from the original installation date.
| Report Received Date | 2022-07-07 00:00:00 |
|---|---|
| Iyear | 2022 |
| Report Number | 20220142 |
| Supplemental Number | 37005 |
| Report Type | Supplemental Final |
| Operator Id | 31174 PHMSA Enforcement |
| Name | Shell Pipeline Co., L.p. |
| Operator Street Address | 150 North Dairy Ashford Road Wck Bldg. A |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77079 |
| Local Datetime | 2022-06-09 07:40:00 |
| Time Zone | Central |
| Daylight Savings Ind | Yes |
| Location Latitude | 29.71722 Google Maps OpenStreetMap |
| Location Longitude | -95.17361 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Gasoline (Non-Ethanol) |
| Unintentional Release Bbls | 2.1 |
| Recovered Bbls | 2.1 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Or Pack Calculations) |
| Incident Identified Datetime | 2022-06-09 00:30:00 |
| System Part Involved | Onshore Terminal/tank Farm Equipment And Piping |
| On Off Shore | Onshore |
| Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2022-06-09 00:45:00 |
| Restart Datetime | 2022-07-07 08:00:00 |
| Communication State Fed Ind | Yes |
| Party Initiated Communication | Operator |
| Initial Responder Com Datetime | 2022-06-09 08:05:00 |
| On Site Datetime | 2022-06-09 00:30:00 |
| Confirmed Discovery Datetime | 2022-06-09 00:40:00 |
| Nrc Rpt Datetime | 2022-06-09 08:40:00 |
| Nrc Rpt Num | 1338227 NRC Report How to search |
| Additional Nrc Report Numbers | 1338460 |
| Ignite Ind | No |
| Notify Qualified Indiv Ind | Yes |
| Qualified Indiv Notif Datetime | 2022-06-09 07:40:00 |
| Oil Spill Removal Org Ind | Yes |
| Osro Activated Datetime | 2022-06-09 08:10:00 |
| Osro Arrived On Site Dt | 6/9/2022 9:10 |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Colex East Tank Farm |
| Segment Name | Colex East Tank Farm |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 77506 |
| Onshore City Name | Pasadena |
| Onshore County Name | Harris |
| Designated Location | Survey Station No. |
| Designated Name | Colex East |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 144 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Flange Assembly |
| Installation Year | 1973 |
| Manufactured Year | 1973 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Connection Failure |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| High Pop Ind | Yes |
| High Pop Yes No | Yes |
| Usa Drinking Ind | Yes |
| Usa Drinking Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 400 |
| Est Cost Prop Damage | 336524 |
| Est Cost Emergency | 91076 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 428000 |
| Num Persons Hosp Not Ovnght | 0 |
| Num Injured Treated By Emt | 0 |
| Num Resident Building Affctd | 0 |
| Num Business Building Affctd | 0 |
| Accident Psig | 30 |
| Mop Psig | 275 |
| Mop Cfr Section | Component Design Pressure �195.406(A)(2) View CFR 49 §192 |
| Maop Established Date | 1973-01-01 00:00:00 |
| Maop Reversal Flow Ind | No |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | Yes, but the investigation of the control room and/or controller actions has not yet been completed by the operator (supplemental report required) |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Non-Threaded Connection Failure |
| Eq Failure Type | Non-Threaded Connection Failure |
| Other Non Threaded Ind | Gasket |
| Ief Addl Misalignment Ind | Yes |
| Preparer Name | J***** H***** |
| Preparer Title | Operations Support Coordinator |
| Preparer Email | J************@s****.com |
| Preparer Telephone | 4095402781 |
| Prepared Date | 2022-08-22 00:00:00 |
| Local Contact Name | J***** H***** |
| Local Contact Email | J************@s****.com |
| Local Contact Telephone | 4095402781 |
| Authorizer Name | D****** P**** |
| Authorizer Telephone | 832-762-2553 |
| Authorizer Title | Integrity And Regulatory Services Manager |
| Authorizer Email | D************@s****.com |
| Narrative | On 6/9/22, around 12:30 am, an operator was dispatched to check an excessive sump pump running alarm at colex east tank farm. After checking the sump pump, the operator made a round by the manifold and discovered a small puddle of gasoline collecting near the interface of some below-ground piping. The operator notified supervision and it was determined to keep an eye on the location until daylight for further evaluation. At 7:40 the same day, it was determined to dig up the area and locate the source of the leak, and this time it was identified the costs would exceed $50k, and then the call to the nrc was made. Concerning cpm, the leak occurred on facility piping near the manifold and that doesn't fall under the cpm installed. In saying that, there is terminal balance leak detection primarily based on the ehh on the tanks. This system is designed to pick up a much larger release. After the investigation, it was determined the gasket failed from improper alignment from the original installation date. |