Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2022-06-16 — TX
Operator
Enterprise Products Operating Llc
Cause
Equipment Failure
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$79,373
Incident datetime
2022-06-16 09:05
Report number
Location
TX
Narrative
On 6/16/2022 at 08:49 ct, a 3rd party contacted local operations about bubbles observed in a farming field near the east leg mainline. Enterprise technician arrived onsite at 09:05 ct and contacted houston control center to shut down the pipeline. On 6/17/2022 at 08:35 ct, it was determined that the estimated repair costs would exceed the $50,000 reporting threshold for nrc notification. Excavation revealed a leaking o-ring from a completion plug on a stopple spilt tee. The stopple was cut out and a 20.2 feet of pipe was replaced. Approximately 1 gallon of propane leaked from the pipeline, and 26 barrels were flared prior to the nitrogen purge allowing for repairs. The pipeline was returned to service on 6/20/2022 at 09:20 ct. Initial call to nrc was made on 06/17/2022 at 09:12 ct (nrc# 1339016). The call was made based on repair cost estimates exceeding $50,000. 48hr update call to nrc was made on 06/18/2022 (nrc# 1339169). The update provided a product release amount of 1 gallon of propane and estimated damages of $100,000.
Detailed record list
Report Received Date
2022-07-05 00:00:00
Iyear
2022
Report Number
20220139
Supplemental Number
36915
Report Type
Supplemental Final
Operator Id
31618
Name
Enterprise Products Operating Llc
Operator Street Address
1100 Louisiana Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2022-06-16 08:49:00
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
39.520457
Location Longitude
-92.444128
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid)
Unintentional Release Bbls
0.1
Intentional Release Bbls
26
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Public
Incident Identified Datetime
2022-06-16 09:05:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2022-06-16 09:24:00
Restart Datetime
2022-06-20 09:20:00
Communication State Fed Ind
No
On Site Datetime
2022-06-16 09:05:00
Confirmed Discovery Datetime
2022-06-17 08:35:00
Nrc Rpt Datetime
2022-06-17 09:12:00
Nrc Rpt Num
1339016
Additional Nrc Report Numbers
1339169
Ignite Ind
No
Upstream Action Taken
Operational Control
Upstream Oprtnl Cntrl Detail
Sent Stop Command To Eskridge Station Unit 1 Pump
Downstream Action Taken
Operational Control
Downstream Oprtnl Cntrl Detail
Opened Up Flow To Moberly Terminal
Num Pub Evacuated
0
Pipe Fac Name
East Leg Mainline
Segment Name
600-601-602
Onshore State Abbreviation
Mo
Onshore Postal Code
65239
Onshore City Name
Moberly
Onshore County Name
Randolph
Designated Location
Milepost
Designated Name
316
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
30
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Tap Fitting(Stopple, Thread-O-Ring, Weld-O-Let, Etc.)
Installation Year
1989
Manufactured Year
Unknown
Material Involved
Material Other Than Carbon Steel
Material Details
Buna N O-Ring
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Other Pop Ind
Yes
Other Pop Yes No
Yes
Est Cost Oper Paid
15000
Est Cost Gas Released
1321
Est Cost Prop Damage
79373
Est Cost Emergency
54042
Est Cost Environmental
0
Est Cost Other
0
Prpty
149736
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
674
Mop Psig
1650
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
1989-07-02 00:00:00
Maop Reversal Flow Ind
Yes
Surge Analysis Date
2015-04-06 00:00:00
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Pipeline control operator did not contribute to the leak.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Other Non Threaded Ind
O-Ring
Eq Additional Other Ind
Yes
Eq Additional Other Details
Material Deterioration
Preparer Name
H*** D***
Preparer Title
Sr. Pipeline Compliance Engineer
Preparer Email
H****@e****.com
Preparer Telephone
713-381-4277
Prepared Date
2022-07-29 00:00:00
Authorizer Name
H*** D***
Authorizer Telephone
713-381-4277
Authorizer Title
Sr. Pipeline Compliance Engineer
Authorizer Email
H****@e****.com
Narrative
On 6/16/2022 at 08:49 ct, a 3rd party contacted local operations about bubbles observed in a farming field near the east leg mainline. Enterprise technician arrived onsite at 09:05 ct and contacted houston control center to shut down the pipeline. On 6/17/2022 at 08:35 ct, it was determined that the estimated repair costs would exceed the $50,000 reporting threshold for nrc notification. Excavation revealed a leaking o-ring from a completion plug on a stopple spilt tee. The stopple was cut out and a 20.2 feet of pipe was replaced. Approximately 1 gallon of propane leaked from the pipeline, and 26 barrels were flared prior to the nitrogen purge allowing for repairs. The pipeline was returned to service on 6/20/2022 at 09:20 ct. Initial call to nrc was made on 06/17/2022 at 09:12 ct (nrc# 1339016). The call was made based on repair cost estimates exceeding $50,000. 48hr update call to nrc was made on 06/18/2022 (nrc# 1339169). The update provided a product release amount of 1 gallon of propane and estimated damages of $100,000.
| Report Received Date | 2022-07-05 00:00:00 |
|---|---|
| Iyear | 2022 |
| Report Number | 20220139 |
| Supplemental Number | 36915 |
| Report Type | Supplemental Final |
| Operator Id | 31618 PHMSA Enforcement |
| Name | Enterprise Products Operating Llc |
| Operator Street Address | 1100 Louisiana Street |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2022-06-16 08:49:00 |
| Time Zone | Central |
| Daylight Savings Ind | Yes |
| Location Latitude | 39.520457 Google Maps OpenStreetMap |
| Location Longitude | -92.444128 Google Maps OpenStreetMap |
| Commodity Released Type | Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions |
| Commodity Subtype | Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid) |
| Unintentional Release Bbls | 0.1 |
| Intentional Release Bbls | 26 |
| Recovered Bbls | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Notification From Public |
| Incident Identified Datetime | 2022-06-16 09:05:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Status When Identified | Normal Operation, Includes Pauses Between Batches And During Maintenance |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2022-06-16 09:24:00 |
| Restart Datetime | 2022-06-20 09:20:00 |
| Communication State Fed Ind | No |
| On Site Datetime | 2022-06-16 09:05:00 |
| Confirmed Discovery Datetime | 2022-06-17 08:35:00 |
| Nrc Rpt Datetime | 2022-06-17 09:12:00 |
| Nrc Rpt Num | 1339016 NRC Report How to search |
| Additional Nrc Report Numbers | 1339169 |
| Ignite Ind | No |
| Upstream Action Taken | Operational Control |
| Upstream Oprtnl Cntrl Detail | Sent Stop Command To Eskridge Station Unit 1 Pump |
| Downstream Action Taken | Operational Control |
| Downstream Oprtnl Cntrl Detail | Opened Up Flow To Moberly Terminal |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | East Leg Mainline |
| Segment Name | 600-601-602 |
| Onshore State Abbreviation | Mo |
| Onshore Postal Code | 65239 |
| Onshore City Name | Moberly |
| Onshore County Name | Randolph |
| Designated Location | Milepost |
| Designated Name | 316 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 30 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Tap Fitting(Stopple, Thread-O-Ring, Weld-O-Let, Etc.) |
| Installation Year | 1989 |
| Manufactured Year | Unknown |
| Material Involved | Material Other Than Carbon Steel |
| Material Details | Buna N O-Ring |
| Release Type | Leak |
| Leak Type | Seal Or Packing |
| Wildlife Impact Ind | No |
| Soil Contamination | No |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| Other Pop Ind | Yes |
| Other Pop Yes No | Yes |
| Est Cost Oper Paid | 15000 |
| Est Cost Gas Released | 1321 |
| Est Cost Prop Damage | 79373 |
| Est Cost Emergency | 54042 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 149736 |
| Num Persons Hosp Not Ovnght | 0 |
| Num Injured Treated By Emt | 0 |
| Num Resident Building Affctd | 0 |
| Num Business Building Affctd | 0 |
| Accident Psig | 674 |
| Mop Psig | 1650 |
| Mop Cfr Section | Component Design Pressure �195.406(A)(2) View CFR 49 §192 |
| Maop Established Date | 1989-07-02 00:00:00 |
| Maop Reversal Flow Ind | Yes |
| Surge Analysis Date | 2015-04-06 00:00:00 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Pipeline control operator did not contribute to the leak. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Non-Threaded Connection Failure |
| Eq Failure Type | Non-Threaded Connection Failure |
| Other Non Threaded Ind | O-Ring |
| Eq Additional Other Ind | Yes |
| Eq Additional Other Details | Material Deterioration |
| Preparer Name | H*** D*** |
| Preparer Title | Sr. Pipeline Compliance Engineer |
| Preparer Email | H****@e****.com |
| Preparer Telephone | 713-381-4277 |
| Prepared Date | 2022-07-29 00:00:00 |
| Authorizer Name | H*** D*** |
| Authorizer Telephone | 713-381-4277 |
| Authorizer Title | Sr. Pipeline Compliance Engineer |
| Authorizer Email | H****@e****.com |
| Narrative | On 6/16/2022 at 08:49 ct, a 3rd party contacted local operations about bubbles observed in a farming field near the east leg mainline. Enterprise technician arrived onsite at 09:05 ct and contacted houston control center to shut down the pipeline. On 6/17/2022 at 08:35 ct, it was determined that the estimated repair costs would exceed the $50,000 reporting threshold for nrc notification. Excavation revealed a leaking o-ring from a completion plug on a stopple spilt tee. The stopple was cut out and a 20.2 feet of pipe was replaced. Approximately 1 gallon of propane leaked from the pipeline, and 26 barrels were flared prior to the nitrogen purge allowing for repairs. The pipeline was returned to service on 6/20/2022 at 09:20 ct. Initial call to nrc was made on 06/17/2022 at 09:12 ct (nrc# 1339016). The call was made based on repair cost estimates exceeding $50,000. 48hr update call to nrc was made on 06/18/2022 (nrc# 1339169). The update provided a product release amount of 1 gallon of propane and estimated damages of $100,000. |