GTG incident on 2022-10-22 — TX
Operator
Sabal Trail Transmission, Llc (Spectra Energy Partners, Lp)
Cause
Equipment Failure
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$0
Incident datetime
2022-10-22 09:12
Report number
Location
TX
Narrative
On october 22, 2022, at approximately 9:12 am est, an employee at the reunion compressor station identified gas blowing through the station blowdown stack. This was not a planned activity and indicated an issue. He examined the station and identified an ice buildup on the 2-inch compressor unit #1 loading valve. Unit #1 was not in operation at the time but did have gas at a pressure of 150 psig leaking through the valve into the station blowdown system. Earlier under normal operation unit #1 was shut down to switch to unit #2. Through this process the unit loading valve on unit #1 failed to travel to the fully closed position but did indicate it was closed on the system controls due to a faulty limit switch. The valve failing to fully close allowed for gas to vent through the station blowdown system overnight. The restricted flow path created a restriction and pressure drop that caused the formation of ice at the valve. The faulty limit switch on the 2-inch loading valve was also replaced. Unit #1 remained off throughout this time, unit #2 remained running to meet all needed capacities. The failed components were replaced before returning unit #1 to normal operation. The gas loss based upon the restriction and duration was calculated to be 7.08 mmscf. December 15, 2022 part a 4 - updated to reflect the date and time the release started part g - changed sub-cause from "compressor or compressor-related equipment" to "non-threaded connection failure - o-ring" part h updated narrative
Detailed record list
Report Received Date
2022-11-15 00:00:00
Iyear
2022
Report Number
20220121
Supplemental Number
37473
Report Type
Supplemental Final
Operator Id
39167
Name
Sabal Trail Transmission, Llc (Spectra Energy Partners, Lp)
Operator Street Address
915 North Eldridge Parkway
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77079
Local Datetime
2022-10-21 22:42:00
Time Zone
Eastern
Daylight Savings Ind
Yes
Location Latitude
28.26197207
Location Longitude
-81.55558276
Nrc Rpt Num
1350565
Nrc Rpt Datetime
2022-10-22 10:18:00
Additional Nrc Report Numbers
1350683
Commodity Released Type
Natural Gas
Unintentional Release
7080
Intentional Release
0
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Status When Identified
Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind
No
Shutdown Explain
One Of Two Compressor Units At This Station Continued To Operate.
Communication State Fed Ind
No
Ignite Ind
No
Num Pub Evacuated
0
Incident Identified Datetime
2022-10-22 09:12:00
On Site Datetime
2022-10-22 09:12:00
On Off Shore
Onshore
Onshore State Abbreviation
Fl
Onshore Postal Code
33896
Onshore City Name
Davenport
Onshore County Name
Osceola
Designated Location
Milepost
Designated Name
482.36
Pipe Fac Name
Reunion Compressor Station
Segment Name
Dunn-Reun/1 & Reun-Eoln
Federal
No
Location Type
Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
System Part Involved
Onshore Compressor Station Equipment And Piping
Item Involved
Valve
Valve Type
Auxiliary Or Other Valve
Installation Year
2017
Manufactured Year
2016
Material Involved
Carbon Steel
Release Type
Other
Release Type Details
Unit Loading Valve Failed To Fully Close On Shut Down.
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
62
Heat Damage Ind
No
Non Heat Damage Ind
No
Did Occur In Mca Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
35046
Est Cost Intentional Release
0
Est Cost Prop Damage
0
Est Cost Emergency
1000
Est Cost Other
1200
Est Cost Other Details
Replaced Component
Gas Cost In Mcf
4.95
Prpty
37246
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Wildlife Impact Ind
No
Accident Psig
150
Gas Flow In Pipe In Mcf
0
Mop Psig
1456
Mop Cfr Section
192.619(A)(2)
Maop Established Date
2017-05-07 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Gas Required Odorized Ind
Yes
Gas Odorized Ind
Yes
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
No indication or evidence of control room or controller contribution to the incident; operations (I.E., pressures and flows) in the area were normal and within designed ranges.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Other Non Threaded Ind
O-Ring
Eq Additional Other Ind
Yes
Eq Additional Other Details
O-Ring Failure
Preparer Name
M****** M******
Preparer Email
M******@c******.net
Preparer Telephone
6128056542
Authorizer Name
N***** A****
Authorizer Telephone
17136275008
Authorizer Email
N***********@e*******.com
Narrative
On october 22, 2022, at approximately 9:12 am est, an employee at the reunion compressor station identified gas blowing through the station blowdown stack. This was not a planned activity and indicated an issue. He examined the station and identified an ice buildup on the 2-inch compressor unit #1 loading valve. Unit #1 was not in operation at the time but did have gas at a pressure of 150 psig leaking through the valve into the station blowdown system. Earlier under normal operation unit #1 was shut down to switch to unit #2. Through this process the unit loading valve on unit #1 failed to travel to the fully closed position but did indicate it was closed on the system controls due to a faulty limit switch. The valve failing to fully close allowed for gas to vent through the station blowdown system overnight. The restricted flow path created a restriction and pressure drop that caused the formation of ice at the valve. The faulty limit switch on the 2-inch loading valve was also replaced. Unit #1 remained off throughout this time, unit #2 remained running to meet all needed capacities. The failed components were replaced before returning unit #1 to normal operation. The gas loss based upon the restriction and duration was calculated to be 7.08 mmscf. December 15, 2022 part a 4 - updated to reflect the date and time the release started part g - changed sub-cause from "compressor or compressor-related equipment" to "non-threaded connection failure - o-ring" part h updated narrative
| Report Received Date | 2022-11-15 00:00:00 |
|---|---|
| Iyear | 2022 |
| Report Number | 20220121 |
| Supplemental Number | 37473 |
| Report Type | Supplemental Final |
| Operator Id | 39167 PHMSA Enforcement |
| Name | Sabal Trail Transmission, Llc (Spectra Energy Partners, Lp) |
| Operator Street Address | 915 North Eldridge Parkway |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77079 |
| Local Datetime | 2022-10-21 22:42:00 |
| Time Zone | Eastern |
| Daylight Savings Ind | Yes |
| Location Latitude | 28.26197207 Google Maps OpenStreetMap |
| Location Longitude | -81.55558276 Google Maps OpenStreetMap |
| Nrc Rpt Num | 1350565 NRC Report How to search |
| Nrc Rpt Datetime | 2022-10-22 10:18:00 |
| Additional Nrc Report Numbers | 1350683 |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 7080 |
| Intentional Release | 0 |
| Accompanying Liquid | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Status When Identified | Normal Operation, Includes Pauses During Maintenance |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | One Of Two Compressor Units At This Station Continued To Operate. |
| Communication State Fed Ind | No |
| Ignite Ind | No |
| Num Pub Evacuated | 0 |
| Incident Identified Datetime | 2022-10-22 09:12:00 |
| On Site Datetime | 2022-10-22 09:12:00 |
| On Off Shore | Onshore |
| Onshore State Abbreviation | Fl |
| Onshore Postal Code | 33896 |
| Onshore City Name | Davenport |
| Onshore County Name | Osceola |
| Designated Location | Milepost |
| Designated Name | 482.36 |
| Pipe Fac Name | Reunion Compressor Station |
| Segment Name | Dunn-Reun/1 & Reun-Eoln |
| Federal | No |
| Location Type | Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Interstate |
| System Part Involved | Onshore Compressor Station Equipment And Piping |
| Item Involved | Valve |
| Valve Type | Auxiliary Or Other Valve |
| Installation Year | 2017 |
| Manufactured Year | 2016 |
| Material Involved | Carbon Steel |
| Release Type | Other |
| Release Type Details | Unit Loading Valve Failed To Fully Close On Shut Down. |
| Class Location Type | Class 1 Location |
| Could Be Hca | No |
| Pir Radius | 62 |
| Heat Damage Ind | No |
| Non Heat Damage Ind | No |
| Did Occur In Mca Ind | No |
| Est Cost Oper Paid | 0 |
| Est Cost Unintentional Release | 35046 |
| Est Cost Intentional Release | 0 |
| Est Cost Prop Damage | 0 |
| Est Cost Emergency | 1000 |
| Est Cost Other | 1200 |
| Est Cost Other Details | Replaced Component |
| Gas Cost In Mcf | 4.95 |
| Prpty | 37246 |
| Num Persons Hosp Not Ovnght | 0 |
| Num Injured Treated By Emt | 0 |
| Num Resident Building Affctd | 0 |
| Num Business Building Affctd | 0 |
| Wildlife Impact Ind | No |
| Accident Psig | 150 |
| Gas Flow In Pipe In Mcf | 0 |
| Mop Psig | 1456 |
| Mop Cfr Section | 192.619(A)(2) View CFR 49 §192 |
| Maop Established Date | 2017-05-07 00:00:00 |
| Maop Reversal Flow Ind | No |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Pressure Restriction Ind | No |
| Gas Required Odorized Ind | Yes |
| Gas Odorized Ind | Yes |
| Pipeline Function | Transmission System |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | No indication or evidence of control room or controller contribution to the incident; operations (I.E., pressures and flows) in the area were normal and within designed ranges. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Non-Threaded Connection Failure |
| Eq Failure Type | Non-Threaded Connection Failure |
| Other Non Threaded Ind | O-Ring |
| Eq Additional Other Ind | Yes |
| Eq Additional Other Details | O-Ring Failure |
| Preparer Name | M****** M****** |
| Preparer Email | M******@c******.net |
| Preparer Telephone | 6128056542 |
| Authorizer Name | N***** A**** |
| Authorizer Telephone | 17136275008 |
| Authorizer Email | N***********@e*******.com |
| Narrative | On october 22, 2022, at approximately 9:12 am est, an employee at the reunion compressor station identified gas blowing through the station blowdown stack. This was not a planned activity and indicated an issue. He examined the station and identified an ice buildup on the 2-inch compressor unit #1 loading valve. Unit #1 was not in operation at the time but did have gas at a pressure of 150 psig leaking through the valve into the station blowdown system. Earlier under normal operation unit #1 was shut down to switch to unit #2. Through this process the unit loading valve on unit #1 failed to travel to the fully closed position but did indicate it was closed on the system controls due to a faulty limit switch. The valve failing to fully close allowed for gas to vent through the station blowdown system overnight. The restricted flow path created a restriction and pressure drop that caused the formation of ice at the valve. The faulty limit switch on the 2-inch loading valve was also replaced. Unit #1 remained off throughout this time, unit #2 remained running to meet all needed capacities. The failed components were replaced before returning unit #1 to normal operation. The gas loss based upon the restriction and duration was calculated to be 7.08 mmscf. December 15, 2022 part a 4 - updated to reflect the date and time the release started part g - changed sub-cause from "compressor or compressor-related equipment" to "non-threaded connection failure - o-ring" part h updated narrative |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA