GTG incident on 2022-08-24 — NY
Operator
National Fuel Gas Supply Corp
Cause
Equipment Failure
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$310,841
Incident datetime
2022-08-24 09:51
Report number
Location
NY
Narrative
On august 24, 2022 at 9:51 am est, ellisburg compressor station experienced an esd system activation on the storage discharge header which resulted in failure of the vent stack assembly. The force from the release of venting gas damaged a nearby station building. There were no fatalities or injuries as a result of the event.
Detailed record list
Report Received Date
2022-09-23 00:00:00
Iyear
2022
Report Number
20220102
Supplemental Number
37850
Report Type
Supplemental Final
Operator Id
13063
Name
National Fuel Gas Supply Corp
Operator Street Address
6363 Main Street
Operator City Name
Williamsville
Operator State Abbreviation
NY
Operator Postal Code
14221-5887
Local Datetime
2022-08-24 09:51:00
Time Zone
Eastern
Daylight Savings Ind
Yes
Location Latitude
41.899867
Location Longitude
-77.914778
Nrc Rpt Num
1345378
Nrc Rpt Datetime
2022-08-24 10:35:00
Additional Nrc Report Numbers
1345573
Commodity Released Type
Natural Gas
Unintentional Release
34.579
Intentional Release
0
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Status When Identified
Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind
No
Shutdown Explain
Section Of Station Piping Isolated But Operation Of Connected Pipeline Continued
Communication State Fed Ind
No
Ignite Ind
No
Num Pub Evacuated
0
Incident Identified Datetime
2022-08-24 09:51:00
On Site Datetime
2022-08-24 09:51:00
On Off Shore
Onshore
Onshore State Abbreviation
Pa
Onshore Postal Code
16923
Onshore City Name
Genesee
Onshore County Name
Potter
Designated Location
Not Applicable
Pipe Fac Name
Ellisburg Compressor Station
Segment Name
Ellisburg Storage Discharge Header
Federal
No
Location Type
Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
System Part Involved
Onshore Compressor Station Equipment And Piping
Item Involved
Esd System, But Excluding Product Drain Lines And Tubing
Installation Year
2020
Manufactured Year
2018
Material Involved
Carbon Steel
Release Type
Other
Release Type Details
Storage Header Esd Blowdown
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
403
Heat Damage Ind
No
Non Heat Damage Ind
No
Did Occur In Mca Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
265
Est Cost Intentional Release
0
Est Cost Prop Damage
310841
Est Cost Emergency
6480
Est Cost Other
0
Gas Cost In Mcf
7.65
Prpty
317586
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Wildlife Impact Ind
No
Accident Psig
1739
Gas Flow In Pipe In Mcf
0
Mop Psig
2372
Mop Cfr Section
192.619(A)(2)
Maop Established Date
2020-06-29 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Gas Required Odorized Ind
No
Pipeline Function
Transmission In Storage Field
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
At time of incident, facility under local control with control room monitoring
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
Yes
Num Employees Tested
2
Num Employees Failed
0
Num Contractors Tested
2
Num Contractors Failed
0
Cause
Equipment Failure
Cause Details
Other Equipment Failure
Eq Failure Type
Other Equipment Failure
Eq Failure Details
Esd Vent Stack Assembly Failure
Additional Support Ind
Yes
Preparer Name
S***** M*****
Preparer Title
Integrity Engineer
Preparer Email
M******@n******.com
Preparer Telephone
(814) 871-8204
Authorizer Name
B**** K******
Authorizer Title
Superintendent
Authorizer Telephone
(716) 827-2131
Authorizer Email
K*******@n******.com
Narrative
On august 24, 2022 at 9:51 am est, ellisburg compressor station experienced an esd system activation on the storage discharge header which resulted in failure of the vent stack assembly. The force from the release of venting gas damaged a nearby station building. There were no fatalities or injuries as a result of the event.
| Report Received Date | 2022-09-23 00:00:00 |
|---|---|
| Iyear | 2022 |
| Report Number | 20220102 |
| Supplemental Number | 37850 |
| Report Type | Supplemental Final |
| Operator Id | 13063 PHMSA Enforcement |
| Name | National Fuel Gas Supply Corp |
| Operator Street Address | 6363 Main Street |
| Operator City Name | Williamsville |
| Operator State Abbreviation | NY |
| Operator Postal Code | 14221-5887 |
| Local Datetime | 2022-08-24 09:51:00 |
| Time Zone | Eastern |
| Daylight Savings Ind | Yes |
| Location Latitude | 41.899867 Google Maps OpenStreetMap |
| Location Longitude | -77.914778 Google Maps OpenStreetMap |
| Nrc Rpt Num | 1345378 NRC Report How to search |
| Nrc Rpt Datetime | 2022-08-24 10:35:00 |
| Additional Nrc Report Numbers | 1345573 |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 34.579 |
| Intentional Release | 0 |
| Accompanying Liquid | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Status When Identified | Normal Operation, Includes Pauses During Maintenance |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | Section Of Station Piping Isolated But Operation Of Connected Pipeline Continued |
| Communication State Fed Ind | No |
| Ignite Ind | No |
| Num Pub Evacuated | 0 |
| Incident Identified Datetime | 2022-08-24 09:51:00 |
| On Site Datetime | 2022-08-24 09:51:00 |
| On Off Shore | Onshore |
| Onshore State Abbreviation | Pa |
| Onshore Postal Code | 16923 |
| Onshore City Name | Genesee |
| Onshore County Name | Potter |
| Designated Location | Not Applicable |
| Pipe Fac Name | Ellisburg Compressor Station |
| Segment Name | Ellisburg Storage Discharge Header |
| Federal | No |
| Location Type | Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Interstate |
| System Part Involved | Onshore Compressor Station Equipment And Piping |
| Item Involved | Esd System, But Excluding Product Drain Lines And Tubing |
| Installation Year | 2020 |
| Manufactured Year | 2018 |
| Material Involved | Carbon Steel |
| Release Type | Other |
| Release Type Details | Storage Header Esd Blowdown |
| Class Location Type | Class 1 Location |
| Could Be Hca | No |
| Pir Radius | 403 |
| Heat Damage Ind | No |
| Non Heat Damage Ind | No |
| Did Occur In Mca Ind | No |
| Est Cost Oper Paid | 0 |
| Est Cost Unintentional Release | 265 |
| Est Cost Intentional Release | 0 |
| Est Cost Prop Damage | 310841 |
| Est Cost Emergency | 6480 |
| Est Cost Other | 0 |
| Gas Cost In Mcf | 7.65 |
| Prpty | 317586 |
| Num Persons Hosp Not Ovnght | 0 |
| Num Injured Treated By Emt | 0 |
| Num Resident Building Affctd | 0 |
| Num Business Building Affctd | 0 |
| Wildlife Impact Ind | No |
| Accident Psig | 1739 |
| Gas Flow In Pipe In Mcf | 0 |
| Mop Psig | 2372 |
| Mop Cfr Section | 192.619(A)(2) View CFR 49 §192 |
| Maop Established Date | 2020-06-29 00:00:00 |
| Maop Reversal Flow Ind | No |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Pressure Restriction Ind | No |
| Gas Required Odorized Ind | No |
| Pipeline Function | Transmission In Storage Field |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | Yes |
| Scada Conf Ind | Yes |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | At time of incident, facility under local control with control room monitoring |
| Employee Drug Test Ind | Yes |
| Contractor Drug Test Ind | Yes |
| Num Employees Tested | 2 |
| Num Employees Failed | 0 |
| Num Contractors Tested | 2 |
| Num Contractors Failed | 0 |
| Cause | Equipment Failure |
| Cause Details | Other Equipment Failure |
| Eq Failure Type | Other Equipment Failure |
| Eq Failure Details | Esd Vent Stack Assembly Failure |
| Additional Support Ind | Yes |
| Preparer Name | S***** M***** |
| Preparer Title | Integrity Engineer |
| Preparer Email | M******@n******.com |
| Preparer Telephone | (814) 871-8204 |
| Authorizer Name | B**** K****** |
| Authorizer Title | Superintendent |
| Authorizer Telephone | (716) 827-2131 |
| Authorizer Email | K*******@n******.com |
| Narrative | On august 24, 2022 at 9:51 am est, ellisburg compressor station experienced an esd system activation on the storage discharge header which resulted in failure of the vent stack assembly. The force from the release of venting gas damaged a nearby station building. There were no fatalities or injuries as a result of the event. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA