GTG incident on 2022-08-24 — NY

Operator
National Fuel Gas Supply Corp
Cause
Equipment Failure
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$310,841
Incident datetime
2022-08-24 09:51
Report number
Location
NY
Narrative
On august 24, 2022 at 9:51 am est, ellisburg compressor station experienced an esd system activation on the storage discharge header which resulted in failure of the vent stack assembly. The force from the release of venting gas damaged a nearby station building. There were no fatalities or injuries as a result of the event.
Detailed record list
Report Received Date
2022-09-23 00:00:00
Iyear
2022
Report Number
20220102
Supplemental Number
37850
Report Type
Supplemental Final
Operator Id
Name
National Fuel Gas Supply Corp
Operator Street Address
6363 Main Street
Operator City Name
Williamsville
Operator State Abbreviation
NY
Operator Postal Code
14221-5887
Local Datetime
2022-08-24 09:51:00
Time Zone
Eastern
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Nrc Rpt Num
Nrc Rpt Datetime
2022-08-24 10:35:00
Additional Nrc Report Numbers
1345573
Commodity Released Type
Natural Gas
Unintentional Release
34.579
Intentional Release
0
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Status When Identified
Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind
No
Shutdown Explain
Section Of Station Piping Isolated But Operation Of Connected Pipeline Continued
Communication State Fed Ind
No
Ignite Ind
No
Num Pub Evacuated
0
Incident Identified Datetime
2022-08-24 09:51:00
On Site Datetime
2022-08-24 09:51:00
On Off Shore
Onshore
Onshore State Abbreviation
Pa
Onshore Postal Code
16923
Onshore City Name
Genesee
Onshore County Name
Potter
Designated Location
Not Applicable
Pipe Fac Name
Ellisburg Compressor Station
Segment Name
Ellisburg Storage Discharge Header
Federal
No
Location Type
Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
System Part Involved
Onshore Compressor Station Equipment And Piping
Item Involved
Esd System, But Excluding Product Drain Lines And Tubing
Installation Year
2020
Manufactured Year
2018
Material Involved
Carbon Steel
Release Type
Other
Release Type Details
Storage Header Esd Blowdown
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
403
Heat Damage Ind
No
Non Heat Damage Ind
No
Did Occur In Mca Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
265
Est Cost Intentional Release
0
Est Cost Prop Damage
310841
Est Cost Emergency
6480
Est Cost Other
0
Gas Cost In Mcf
7.65
Prpty
317586
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Wildlife Impact Ind
No
Accident Psig
1739
Gas Flow In Pipe In Mcf
0
Mop Psig
2372
Mop Cfr Section
192.619(A)(2)
Maop Established Date
2020-06-29 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Gas Required Odorized Ind
No
Pipeline Function
Transmission In Storage Field
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
At time of incident, facility under local control with control room monitoring
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
Yes
Num Employees Tested
2
Num Employees Failed
0
Num Contractors Tested
2
Num Contractors Failed
0
Cause
Equipment Failure
Cause Details
Other Equipment Failure
Eq Failure Type
Other Equipment Failure
Eq Failure Details
Esd Vent Stack Assembly Failure
Additional Support Ind
Yes
Preparer Name
S***** M*****
Preparer Title
Integrity Engineer
Preparer Email
M******@n******.com
Preparer Telephone
(814) 871-8204
Authorizer Name
B**** K******
Authorizer Title
Superintendent
Authorizer Telephone
(716) 827-2131
Authorizer Email
K*******@n******.com
Narrative
On august 24, 2022 at 9:51 am est, ellisburg compressor station experienced an esd system activation on the storage discharge header which resulted in failure of the vent stack assembly. The force from the release of venting gas damaged a nearby station building. There were no fatalities or injuries as a result of the event.
Report Received Date 2022-09-23 00:00:00
Iyear 2022
Report Number 20220102
Supplemental Number 37850
Report Type Supplemental Final
Operator Id 13063 PHMSA Enforcement
Name National Fuel Gas Supply Corp
Operator Street Address 6363 Main Street
Operator City Name Williamsville
Operator State Abbreviation NY
Operator Postal Code 14221-5887
Local Datetime 2022-08-24 09:51:00
Time Zone Eastern
Daylight Savings Ind Yes
Location Latitude 41.899867 Google Maps OpenStreetMap
Location Longitude -77.914778 Google Maps OpenStreetMap
Nrc Rpt Num 1345378 NRC Report How to search
Nrc Rpt Datetime 2022-08-24 10:35:00
Additional Nrc Report Numbers 1345573
Commodity Released Type Natural Gas
Unintentional Release 34.579
Intentional Release 0
Accompanying Liquid 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Status When Identified Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind No
Shutdown Explain Section Of Station Piping Isolated But Operation Of Connected Pipeline Continued
Communication State Fed Ind No
Ignite Ind No
Num Pub Evacuated 0
Incident Identified Datetime 2022-08-24 09:51:00
On Site Datetime 2022-08-24 09:51:00
On Off Shore Onshore
Onshore State Abbreviation Pa
Onshore Postal Code 16923
Onshore City Name Genesee
Onshore County Name Potter
Designated Location Not Applicable
Pipe Fac Name Ellisburg Compressor Station
Segment Name Ellisburg Storage Discharge Header
Federal No
Location Type Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Interstate
System Part Involved Onshore Compressor Station Equipment And Piping
Item Involved Esd System, But Excluding Product Drain Lines And Tubing
Installation Year 2020
Manufactured Year 2018
Material Involved Carbon Steel
Release Type Other
Release Type Details Storage Header Esd Blowdown
Class Location Type Class 1 Location
Could Be Hca No
Pir Radius 403
Heat Damage Ind No
Non Heat Damage Ind No
Did Occur In Mca Ind No
Est Cost Oper Paid 0
Est Cost Unintentional Release 265
Est Cost Intentional Release 0
Est Cost Prop Damage 310841
Est Cost Emergency 6480
Est Cost Other 0
Gas Cost In Mcf 7.65
Prpty 317586
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Wildlife Impact Ind No
Accident Psig 1739
Gas Flow In Pipe In Mcf 0
Mop Psig 2372
Mop Cfr Section 192.619(A)(2) View CFR 49 §192
Maop Established Date 2020-06-29 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Maop
Pressure Restriction Ind No
Gas Required Odorized Ind No
Pipeline Function Transmission In Storage Field
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details At time of incident, facility under local control with control room monitoring
Employee Drug Test Ind Yes
Contractor Drug Test Ind Yes
Num Employees Tested 2
Num Employees Failed 0
Num Contractors Tested 2
Num Contractors Failed 0
Cause Equipment Failure
Cause Details Other Equipment Failure
Eq Failure Type Other Equipment Failure
Eq Failure Details Esd Vent Stack Assembly Failure
Additional Support Ind Yes
Preparer Name S***** M*****
Preparer Title Integrity Engineer
Preparer Email M******@n******.com
Preparer Telephone (814) 871-8204
Authorizer Name B**** K******
Authorizer Title Superintendent
Authorizer Telephone (716) 827-2131
Authorizer Email K*******@n******.com
Narrative On august 24, 2022 at 9:51 am est, ellisburg compressor station experienced an esd system activation on the storage discharge header which resulted in failure of the vent stack assembly. The force from the release of venting gas damaged a nearby station building. There were no fatalities or injuries as a result of the event.