GTG incident on 2022-07-12 — TX
Operator
Tennessee Gas Pipeline Company
Cause
Material Failure Of Pipe Or Weld
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$280,007
Incident datetime
2022-07-12 18:59
Report number
Location
TX
Narrative
On july 12, 2022, tennessee gas pipeline (tgp) was notified by local ems personnel that there had been a rupture in the vicinity of tgp's 300 pipeline system in mckean county, pa, with the presence of a visible fire. Tgp confirmed the presence of the rupture in the 309 valve section of the 300-1 pipeline and found that auto-close valves had operated as designed to isolate the rupture location. The fire was contained and allowed to burn out. Metallurgical analysis revealed that the line ruptured from near-neutral-ph stress corrosion cracking. Historical in-line inspection (ili) assessment technologies available on the pipeline are not designed to detect stress corrosion cracking. After the incident, tgp completed an emat ili assessment, which is designed to detect cracking. Based on the results of that assessment tgp will remediate accordingly. Supplemental report will be submitted with updates when additional information is available.
Detailed record list
Report Received Date
2022-08-11 00:00:00
Iyear
2022
Report Number
20220083
Supplemental Number
39839
Report Type
Supplemental Final
Operator Id
19160
Name
Tennessee Gas Pipeline Company
Operator Street Address
1001 Louisiana St
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2022-07-12 17:23:00
Time Zone
Eastern
Daylight Savings Ind
Yes
Location Latitude
41.6660037
Location Longitude
-78.5851923
Nrc Rpt Num
1341348
Nrc Rpt Datetime
2022-07-12 20:06:00
Additional Nrc Report Numbers
1341525
Commodity Released Type
Natural Gas
Unintentional Release
10821
Intentional Release
0
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Status When Identified
Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2022-07-12 17:25:00
Restart Datetime
2022-08-02 04:30:00
Ignite Ind
Yes
Ignite Datetime
2022-07-12 17:23:00
How Extinguished
Allowed To Burn Out
Gas Consumed By Fire In Mcf
10821
Explode Ind
Yes
Upstream Action Taken
Valve Closure
Upstream Valve Close Datetime
2022-07-12 17:25:00
Downstream Action Taken
Valve Closure
Downstream Vlv Close Datetime
2022-07-12 17:25:00
Num Pub Evacuated
0
Incident Identified Datetime
2022-07-12 18:59:00
On Site Datetime
2022-07-12 19:23:00
Confirmed Discovery Datetime
2022-07-12 17:23:00
On Off Shore
Onshore
Onshore State Abbreviation
Pa
Onshore Postal Code
16740
Onshore City Name
Clermont
Onshore County Name
Mckean
Designated Location
Milepost
Designated Name
309-1+5.349
Pipe Fac Name
300-1 Pipeline
Segment Name
Valve Section 309-1
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
15
Other Underground Facilities
No
Crossing
No
Pipe Facility Type
Interstate
System Part Involved
Onshore Pipeline, Including Valve Sites
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
24
Puddle Weld Ind
No
Pipe Wall Thickness
0.281
Pipe Smys
52000
Pipe Specification
Api 5l Or Equivalent
Pipe Seam Type
Longitudinal Erw - Unknown Frequency
Pipe Manufacturer
A.o. Smith
Pipe Coating Type
Coal Tar
Coating Applied Ind
Yes
Installation Year
1953
Manufactured Year
1953
Material Involved
Carbon Steel
Release Type
Rupture
Rupture Orient
Longitudinal
Rupture Length
312
Rupture Width
78
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
485
Heat Damage Ind
No
Non Heat Damage Ind
No
Did Occur In Mca Ind
No
Est Cost Oper Paid
102446
Est Cost Unintentional Release
66225
Est Cost Intentional Release
0
Est Cost Prop Damage
280007
Est Cost Emergency
15000
Est Cost Other
95508
Est Cost Other Details
Costs For Investigation And Aerial Leakage Survey
Gas Cost In Mcf
6.12
Prpty
559186
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Wildlife Impact Ind
No
Accident Psig
854
Gas Flow In Pipe In Mcf
400000
Mop Psig
858
Mop Cfr Section
192.619(C)
Maop Established Date
1970-08-01 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Gas Required Odorized Ind
No
Upstream Valve Type Ind
Automatic
Downstream Valve Type Ind
Automatic
Length Segment Isolated
55968
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Notification From Emergency Responder
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Pipeline was in normal operational mode with no maop exceedance.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Environmental Cracking-Related
Pwjf Failure Type
Environmental Cracking-Related
Metallurgical Ind
Yes
Stress Subtype
Stress Corrosion Cracking
Pwf Additional Other Ind
Yes
Additional Other Details
None
Post Constr Pressure Test Val
Unknown
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Geometry Deformation Ind
Yes
Axial Recent Year
2019
Axial Rcnt Propul Method
Free Swimming
Axial Rcnt Attuned Detect
Other
Axial Rcnt Atnd Dtct Dtls
Metal Loss And Hard Spots
Axial Previous Year
2009
Axial Prev Propul Method
Free Swimming
Axial Prev Attuned Detect
Metal Loss
Axial Prev Atnd Dtct Metal
High Resolution
Geometry Recent Year
2019
Geometry Rcnt Propul Method
Free Swimming
Geometry Rcnt Resolution
High Resolution
Geometrt Rcnt Measur Cups
No Cups
Geometry Previous Year
2009
Geometry Prev Propul Method
Free Swimming
Geometry Prev Resolution
High Resolution
Geometrt Prev Measur Cups
No Cups
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
1990
Hydrtst Most Rcnt Pressure
1144
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
S**** J L****
Preparer Title
Specialist-Pipeline Technical
Preparer Email
S**********@k***********.com
Preparer Telephone
4124960422
Authorizer Name
Z****** S* R*****
Authorizer Title
Director Engineering Codes Standards
Authorizer Telephone
8329190774
Authorizer Email
Z**********@k***********.com
Narrative
On july 12, 2022, tennessee gas pipeline (tgp) was notified by local ems personnel that there had been a rupture in the vicinity of tgp's 300 pipeline system in mckean county, pa, with the presence of a visible fire. Tgp confirmed the presence of the rupture in the 309 valve section of the 300-1 pipeline and found that auto-close valves had operated as designed to isolate the rupture location. The fire was contained and allowed to burn out. Metallurgical analysis revealed that the line ruptured from near-neutral-ph stress corrosion cracking. Historical in-line inspection (ili) assessment technologies available on the pipeline are not designed to detect stress corrosion cracking. After the incident, tgp completed an emat ili assessment, which is designed to detect cracking. Based on the results of that assessment tgp will remediate accordingly. Supplemental report will be submitted with updates when additional information is available.
| Report Received Date | 2022-08-11 00:00:00 |
|---|---|
| Iyear | 2022 |
| Report Number | 20220083 |
| Supplemental Number | 39839 |
| Report Type | Supplemental Final |
| Operator Id | 19160 PHMSA Enforcement |
| Name | Tennessee Gas Pipeline Company |
| Operator Street Address | 1001 Louisiana St |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2022-07-12 17:23:00 |
| Time Zone | Eastern |
| Daylight Savings Ind | Yes |
| Location Latitude | 41.6660037 Google Maps OpenStreetMap |
| Location Longitude | -78.5851923 Google Maps OpenStreetMap |
| Nrc Rpt Num | 1341348 NRC Report How to search |
| Nrc Rpt Datetime | 2022-07-12 20:06:00 |
| Additional Nrc Report Numbers | 1341525 |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 10821 |
| Intentional Release | 0 |
| Accompanying Liquid | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Status When Identified | Normal Operation, Includes Pauses During Maintenance |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2022-07-12 17:25:00 |
| Restart Datetime | 2022-08-02 04:30:00 |
| Ignite Ind | Yes |
| Ignite Datetime | 2022-07-12 17:23:00 |
| How Extinguished | Allowed To Burn Out |
| Gas Consumed By Fire In Mcf | 10821 |
| Explode Ind | Yes |
| Upstream Action Taken | Valve Closure |
| Upstream Valve Close Datetime | 2022-07-12 17:25:00 |
| Downstream Action Taken | Valve Closure |
| Downstream Vlv Close Datetime | 2022-07-12 17:25:00 |
| Num Pub Evacuated | 0 |
| Incident Identified Datetime | 2022-07-12 18:59:00 |
| On Site Datetime | 2022-07-12 19:23:00 |
| Confirmed Discovery Datetime | 2022-07-12 17:23:00 |
| On Off Shore | Onshore |
| Onshore State Abbreviation | Pa |
| Onshore Postal Code | 16740 |
| Onshore City Name | Clermont |
| Onshore County Name | Mckean |
| Designated Location | Milepost |
| Designated Name | 309-1+5.349 |
| Pipe Fac Name | 300-1 Pipeline |
| Segment Name | Valve Section 309-1 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 15 |
| Other Underground Facilities | No |
| Crossing | No |
| Pipe Facility Type | Interstate |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 24 |
| Puddle Weld Ind | No |
| Pipe Wall Thickness | 0.281 |
| Pipe Smys | 52000 |
| Pipe Specification | Api 5l Or Equivalent |
| Pipe Seam Type | Longitudinal Erw - Unknown Frequency |
| Pipe Manufacturer | A.o. Smith |
| Pipe Coating Type | Coal Tar |
| Coating Applied Ind | Yes |
| Installation Year | 1953 |
| Manufactured Year | 1953 |
| Material Involved | Carbon Steel |
| Release Type | Rupture |
| Rupture Orient | Longitudinal |
| Rupture Length | 312 |
| Rupture Width | 78 |
| Class Location Type | Class 1 Location |
| Could Be Hca | No |
| Pir Radius | 485 |
| Heat Damage Ind | No |
| Non Heat Damage Ind | No |
| Did Occur In Mca Ind | No |
| Est Cost Oper Paid | 102446 |
| Est Cost Unintentional Release | 66225 |
| Est Cost Intentional Release | 0 |
| Est Cost Prop Damage | 280007 |
| Est Cost Emergency | 15000 |
| Est Cost Other | 95508 |
| Est Cost Other Details | Costs For Investigation And Aerial Leakage Survey |
| Gas Cost In Mcf | 6.12 |
| Prpty | 559186 |
| Num Persons Hosp Not Ovnght | 0 |
| Num Injured Treated By Emt | 0 |
| Num Resident Building Affctd | 0 |
| Num Business Building Affctd | 0 |
| Wildlife Impact Ind | No |
| Accident Psig | 854 |
| Gas Flow In Pipe In Mcf | 400000 |
| Mop Psig | 858 |
| Mop Cfr Section | 192.619(C) View CFR 49 §192 |
| Maop Established Date | 1970-08-01 00:00:00 |
| Maop Reversal Flow Ind | No |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Pressure Restriction Ind | No |
| Gas Required Odorized Ind | No |
| Upstream Valve Type Ind | Automatic |
| Downstream Valve Type Ind | Automatic |
| Length Segment Isolated | 55968 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | Transmission System |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Accident Identifier | Notification From Emergency Responder |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Pipeline was in normal operational mode with no maop exceedance. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Material Failure Of Pipe Or Weld |
| Cause Details | Environmental Cracking-Related |
| Pwjf Failure Type | Environmental Cracking-Related |
| Metallurgical Ind | Yes |
| Stress Subtype | Stress Corrosion Cracking |
| Pwf Additional Other Ind | Yes |
| Additional Other Details | None |
| Post Constr Pressure Test Val | Unknown |
| Collected Data Ind | Yes |
| Axial Magnetic Flx Lkg Ind | Yes |
| Geometry Deformation Ind | Yes |
| Axial Recent Year | 2019 |
| Axial Rcnt Propul Method | Free Swimming |
| Axial Rcnt Attuned Detect | Other |
| Axial Rcnt Atnd Dtct Dtls | Metal Loss And Hard Spots |
| Axial Previous Year | 2009 |
| Axial Prev Propul Method | Free Swimming |
| Axial Prev Attuned Detect | Metal Loss |
| Axial Prev Atnd Dtct Metal | High Resolution |
| Geometry Recent Year | 2019 |
| Geometry Rcnt Propul Method | Free Swimming |
| Geometry Rcnt Resolution | High Resolution |
| Geometrt Rcnt Measur Cups | No Cups |
| Geometry Previous Year | 2009 |
| Geometry Prev Propul Method | Free Swimming |
| Geometry Prev Resolution | High Resolution |
| Geometrt Prev Measur Cups | No Cups |
| Has Hydrtst Conduc Before Ind | Yes |
| Hydrtst Most Rcnt Year | 1990 |
| Hydrtst Most Rcnt Pressure | 1144 |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | S**** J L**** |
| Preparer Title | Specialist-Pipeline Technical |
| Preparer Email | S**********@k***********.com |
| Preparer Telephone | 4124960422 |
| Authorizer Name | Z****** S* R***** |
| Authorizer Title | Director Engineering Codes Standards |
| Authorizer Telephone | 8329190774 |
| Authorizer Email | Z**********@k***********.com |
| Narrative | On july 12, 2022, tennessee gas pipeline (tgp) was notified by local ems personnel that there had been a rupture in the vicinity of tgp's 300 pipeline system in mckean county, pa, with the presence of a visible fire. Tgp confirmed the presence of the rupture in the 309 valve section of the 300-1 pipeline and found that auto-close valves had operated as designed to isolate the rupture location. The fire was contained and allowed to burn out. Metallurgical analysis revealed that the line ruptured from near-neutral-ph stress corrosion cracking. Historical in-line inspection (ili) assessment technologies available on the pipeline are not designed to detect stress corrosion cracking. After the incident, tgp completed an emat ili assessment, which is designed to detect cracking. Based on the results of that assessment tgp will remediate accordingly. Supplemental report will be submitted with updates when additional information is available. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA