GTG incident on 2022-07-12 — TX

Operator
Tennessee Gas Pipeline Company
Cause
Material Failure Of Pipe Or Weld
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$280,007
Incident datetime
2022-07-12 18:59
Report number
Location
TX
Narrative
On july 12, 2022, tennessee gas pipeline (tgp) was notified by local ems personnel that there had been a rupture in the vicinity of tgp's 300 pipeline system in mckean county, pa, with the presence of a visible fire. Tgp confirmed the presence of the rupture in the 309 valve section of the 300-1 pipeline and found that auto-close valves had operated as designed to isolate the rupture location. The fire was contained and allowed to burn out. Metallurgical analysis revealed that the line ruptured from near-neutral-ph stress corrosion cracking. Historical in-line inspection (ili) assessment technologies available on the pipeline are not designed to detect stress corrosion cracking. After the incident, tgp completed an emat ili assessment, which is designed to detect cracking. Based on the results of that assessment tgp will remediate accordingly. Supplemental report will be submitted with updates when additional information is available.
Detailed record list
Report Received Date
2022-08-11 00:00:00
Iyear
2022
Report Number
20220083
Supplemental Number
39839
Report Type
Supplemental Final
Operator Id
Name
Tennessee Gas Pipeline Company
Operator Street Address
1001 Louisiana St
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2022-07-12 17:23:00
Time Zone
Eastern
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Nrc Rpt Num
Nrc Rpt Datetime
2022-07-12 20:06:00
Additional Nrc Report Numbers
1341525
Commodity Released Type
Natural Gas
Unintentional Release
10821
Intentional Release
0
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Status When Identified
Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2022-07-12 17:25:00
Restart Datetime
2022-08-02 04:30:00
Ignite Ind
Yes
Ignite Datetime
2022-07-12 17:23:00
How Extinguished
Allowed To Burn Out
Gas Consumed By Fire In Mcf
10821
Explode Ind
Yes
Upstream Action Taken
Valve Closure
Upstream Valve Close Datetime
2022-07-12 17:25:00
Downstream Action Taken
Valve Closure
Downstream Vlv Close Datetime
2022-07-12 17:25:00
Num Pub Evacuated
0
Incident Identified Datetime
2022-07-12 18:59:00
On Site Datetime
2022-07-12 19:23:00
Confirmed Discovery Datetime
2022-07-12 17:23:00
On Off Shore
Onshore
Onshore State Abbreviation
Pa
Onshore Postal Code
16740
Onshore City Name
Clermont
Onshore County Name
Mckean
Designated Location
Milepost
Designated Name
309-1+5.349
Pipe Fac Name
300-1 Pipeline
Segment Name
Valve Section 309-1
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
15
Other Underground Facilities
No
Crossing
No
Pipe Facility Type
Interstate
System Part Involved
Onshore Pipeline, Including Valve Sites
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
24
Puddle Weld Ind
No
Pipe Wall Thickness
0.281
Pipe Smys
52000
Pipe Specification
Api 5l Or Equivalent
Pipe Seam Type
Longitudinal Erw - Unknown Frequency
Pipe Manufacturer
A.o. Smith
Pipe Coating Type
Coal Tar
Coating Applied Ind
Yes
Installation Year
1953
Manufactured Year
1953
Material Involved
Carbon Steel
Release Type
Rupture
Rupture Orient
Longitudinal
Rupture Length
312
Rupture Width
78
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
485
Heat Damage Ind
No
Non Heat Damage Ind
No
Did Occur In Mca Ind
No
Est Cost Oper Paid
102446
Est Cost Unintentional Release
66225
Est Cost Intentional Release
0
Est Cost Prop Damage
280007
Est Cost Emergency
15000
Est Cost Other
95508
Est Cost Other Details
Costs For Investigation And Aerial Leakage Survey
Gas Cost In Mcf
6.12
Prpty
559186
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Wildlife Impact Ind
No
Accident Psig
854
Gas Flow In Pipe In Mcf
400000
Mop Psig
858
Mop Cfr Section
Maop Established Date
1970-08-01 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Gas Required Odorized Ind
No
Upstream Valve Type Ind
Automatic
Downstream Valve Type Ind
Automatic
Length Segment Isolated
55968
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Notification From Emergency Responder
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Pipeline was in normal operational mode with no maop exceedance.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Environmental Cracking-Related
Pwjf Failure Type
Environmental Cracking-Related
Metallurgical Ind
Yes
Stress Subtype
Stress Corrosion Cracking
Pwf Additional Other Ind
Yes
Additional Other Details
None
Post Constr Pressure Test Val
Unknown
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Geometry Deformation Ind
Yes
Axial Recent Year
2019
Axial Rcnt Propul Method
Free Swimming
Axial Rcnt Attuned Detect
Other
Axial Rcnt Atnd Dtct Dtls
Metal Loss And Hard Spots
Axial Previous Year
2009
Axial Prev Propul Method
Free Swimming
Axial Prev Attuned Detect
Metal Loss
Axial Prev Atnd Dtct Metal
High Resolution
Geometry Recent Year
2019
Geometry Rcnt Propul Method
Free Swimming
Geometry Rcnt Resolution
High Resolution
Geometrt Rcnt Measur Cups
No Cups
Geometry Previous Year
2009
Geometry Prev Propul Method
Free Swimming
Geometry Prev Resolution
High Resolution
Geometrt Prev Measur Cups
No Cups
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
1990
Hydrtst Most Rcnt Pressure
1144
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
S**** J L****
Preparer Title
Specialist-Pipeline Technical
Preparer Email
S**********@k***********.com
Preparer Telephone
4124960422
Authorizer Name
Z****** S* R*****
Authorizer Title
Director Engineering Codes Standards
Authorizer Telephone
8329190774
Authorizer Email
Z**********@k***********.com
Narrative
On july 12, 2022, tennessee gas pipeline (tgp) was notified by local ems personnel that there had been a rupture in the vicinity of tgp's 300 pipeline system in mckean county, pa, with the presence of a visible fire. Tgp confirmed the presence of the rupture in the 309 valve section of the 300-1 pipeline and found that auto-close valves had operated as designed to isolate the rupture location. The fire was contained and allowed to burn out. Metallurgical analysis revealed that the line ruptured from near-neutral-ph stress corrosion cracking. Historical in-line inspection (ili) assessment technologies available on the pipeline are not designed to detect stress corrosion cracking. After the incident, tgp completed an emat ili assessment, which is designed to detect cracking. Based on the results of that assessment tgp will remediate accordingly. Supplemental report will be submitted with updates when additional information is available.
Report Received Date 2022-08-11 00:00:00
Iyear 2022
Report Number 20220083
Supplemental Number 39839
Report Type Supplemental Final
Operator Id 19160 PHMSA Enforcement
Name Tennessee Gas Pipeline Company
Operator Street Address 1001 Louisiana St
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2022-07-12 17:23:00
Time Zone Eastern
Daylight Savings Ind Yes
Location Latitude 41.6660037 Google Maps OpenStreetMap
Location Longitude -78.5851923 Google Maps OpenStreetMap
Nrc Rpt Num 1341348 NRC Report How to search
Nrc Rpt Datetime 2022-07-12 20:06:00
Additional Nrc Report Numbers 1341525
Commodity Released Type Natural Gas
Unintentional Release 10821
Intentional Release 0
Accompanying Liquid 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Status When Identified Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind Yes
Shutdown Datetime 2022-07-12 17:25:00
Restart Datetime 2022-08-02 04:30:00
Ignite Ind Yes
Ignite Datetime 2022-07-12 17:23:00
How Extinguished Allowed To Burn Out
Gas Consumed By Fire In Mcf 10821
Explode Ind Yes
Upstream Action Taken Valve Closure
Upstream Valve Close Datetime 2022-07-12 17:25:00
Downstream Action Taken Valve Closure
Downstream Vlv Close Datetime 2022-07-12 17:25:00
Num Pub Evacuated 0
Incident Identified Datetime 2022-07-12 18:59:00
On Site Datetime 2022-07-12 19:23:00
Confirmed Discovery Datetime 2022-07-12 17:23:00
On Off Shore Onshore
Onshore State Abbreviation Pa
Onshore Postal Code 16740
Onshore City Name Clermont
Onshore County Name Mckean
Designated Location Milepost
Designated Name 309-1+5.349
Pipe Fac Name 300-1 Pipeline
Segment Name Valve Section 309-1
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 15
Other Underground Facilities No
Crossing No
Pipe Facility Type Interstate
System Part Involved Onshore Pipeline, Including Valve Sites
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 24
Puddle Weld Ind No
Pipe Wall Thickness 0.281
Pipe Smys 52000
Pipe Specification Api 5l Or Equivalent
Pipe Seam Type Longitudinal Erw - Unknown Frequency
Pipe Manufacturer A.o. Smith
Pipe Coating Type Coal Tar
Coating Applied Ind Yes
Installation Year 1953
Manufactured Year 1953
Material Involved Carbon Steel
Release Type Rupture
Rupture Orient Longitudinal
Rupture Length 312
Rupture Width 78
Class Location Type Class 1 Location
Could Be Hca No
Pir Radius 485
Heat Damage Ind No
Non Heat Damage Ind No
Did Occur In Mca Ind No
Est Cost Oper Paid 102446
Est Cost Unintentional Release 66225
Est Cost Intentional Release 0
Est Cost Prop Damage 280007
Est Cost Emergency 15000
Est Cost Other 95508
Est Cost Other Details Costs For Investigation And Aerial Leakage Survey
Gas Cost In Mcf 6.12
Prpty 559186
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Wildlife Impact Ind No
Accident Psig 854
Gas Flow In Pipe In Mcf 400000
Mop Psig 858
Mop Cfr Section 192.619(C) View CFR 49 §192
Maop Established Date 1970-08-01 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Maop
Pressure Restriction Ind No
Gas Required Odorized Ind No
Upstream Valve Type Ind Automatic
Downstream Valve Type Ind Automatic
Length Segment Isolated 55968
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function Transmission System
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Accident Identifier Notification From Emergency Responder
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Pipeline was in normal operational mode with no maop exceedance.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Material Failure Of Pipe Or Weld
Cause Details Environmental Cracking-Related
Pwjf Failure Type Environmental Cracking-Related
Metallurgical Ind Yes
Stress Subtype Stress Corrosion Cracking
Pwf Additional Other Ind Yes
Additional Other Details None
Post Constr Pressure Test Val Unknown
Collected Data Ind Yes
Axial Magnetic Flx Lkg Ind Yes
Geometry Deformation Ind Yes
Axial Recent Year 2019
Axial Rcnt Propul Method Free Swimming
Axial Rcnt Attuned Detect Other
Axial Rcnt Atnd Dtct Dtls Metal Loss And Hard Spots
Axial Previous Year 2009
Axial Prev Propul Method Free Swimming
Axial Prev Attuned Detect Metal Loss
Axial Prev Atnd Dtct Metal High Resolution
Geometry Recent Year 2019
Geometry Rcnt Propul Method Free Swimming
Geometry Rcnt Resolution High Resolution
Geometrt Rcnt Measur Cups No Cups
Geometry Previous Year 2009
Geometry Prev Propul Method Free Swimming
Geometry Prev Resolution High Resolution
Geometrt Prev Measur Cups No Cups
Has Hydrtst Conduc Before Ind Yes
Hydrtst Most Rcnt Year 1990
Hydrtst Most Rcnt Pressure 1144
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name S**** J L****
Preparer Title Specialist-Pipeline Technical
Preparer Email S**********@k***********.com
Preparer Telephone 4124960422
Authorizer Name Z****** S* R*****
Authorizer Title Director Engineering Codes Standards
Authorizer Telephone 8329190774
Authorizer Email Z**********@k***********.com
Narrative On july 12, 2022, tennessee gas pipeline (tgp) was notified by local ems personnel that there had been a rupture in the vicinity of tgp's 300 pipeline system in mckean county, pa, with the presence of a visible fire. Tgp confirmed the presence of the rupture in the 309 valve section of the 300-1 pipeline and found that auto-close valves had operated as designed to isolate the rupture location. The fire was contained and allowed to burn out. Metallurgical analysis revealed that the line ruptured from near-neutral-ph stress corrosion cracking. Historical in-line inspection (ili) assessment technologies available on the pipeline are not designed to detect stress corrosion cracking. After the incident, tgp completed an emat ili assessment, which is designed to detect cracking. Based on the results of that assessment tgp will remediate accordingly. Supplemental report will be submitted with updates when additional information is available.

All rights reserved. Copyright © by ClearPHMSA