GTG incident on 2022-06-02 — TX

Operator
Energy Transfer Company
Cause
Corrosion Failure
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$498,000
Incident datetime
2022-06-02 07:30
Report number
Location
TX
Narrative
On june 2, 2022, there was a natural gas release on the 99991001 wtg booster 10in tx-winkler_blk b5 sur 3,8,13,14,17,24, a type c gathering line located 4.5 miles south of kermit, tx in winkler county. The line separated and released 1,667 thousand cubic feet of natural gas due to a pipe failure from a defect due to internal corrosion. On june 14, 2022, it was determined that the damage and repairs was going to exceed the $129,300.00 reporting criteria. This event was reported to the nrc # and trrc # 2000 feet of pipe will be replaced with new pipe and to prevent this from occurring in the future, operations will have measurement conduct monthly checks on the three monitors feeding the system and lower the ppm high and high high alarm set points. The affected portion of the pipe was sent to the lab, waiting for results. A supplemental report will be submitted with lab result findings. On july 9, 2022, the pipeline replacement was complete and at 12:00 the pipeline was put back in service. On november 2, 2022, the results of the lab metallurgical analysis indicated significant wall loss due to internal corrosion. The results of the metallurgical analysis indicate that the rupture initiated in the pipe body at the 12:00 orientation and traversed through the pipe for 70-in before arresting. Significant wall loss from internal corrosion was observed in the top half of the pipe due to an upset with the producers which allowed oxygen in the pipe which created the internal corrosion. The failure was not associated with the longitudinal seam. To prevent this from occurring in the future, operations will begin pigging this line twice a week to better disperse injected corrosion inhibitor and ensure line is clean. Oxygen sensors have also been installed on this line to closely monitor the oxygen content of gas stream. Additionally, our chemical company has been instructed to check installed coupons for chemical residue quarterly and perform bacteria tests and make necessary adjustments as needed to the ongoing chemical treatment injection program. This system has also been budgeted for an ili inspection for 2023.
Detailed record list
Report Received Date
2022-07-13 00:00:00
Iyear
2022
Report Number
20220067
Supplemental Number
37985
Report Type
Supplemental Final
Operator Id
Name
Energy Transfer Company
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2022-06-02 07:30:00
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Nrc Rpt Num
Nrc Rpt Datetime
2022-06-14 08:50:00
Additional Nrc Report Numbers
1338920
Commodity Released Type
Natural Gas
Unintentional Release
1667
Intentional Release
0
Accompanying Liquid
0.28
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Status When Identified
Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2022-06-02 07:30:00
Restart Datetime
2022-07-09 12:00:00
Communication State Fed Ind
No
Ignite Ind
No
Upstream Action Taken
Valve Closure
Upstream Valve Close Datetime
2022-06-02 08:00:00
Downstream Action Taken
Valve Closure
Downstream Vlv Close Datetime
2022-06-02 08:30:00
Num Pub Evacuated
0
Incident Identified Datetime
2022-06-02 07:30:00
On Site Datetime
2022-06-02 07:30:00
On Off Shore
Onshore
Onshore State Abbreviation
Tx
Onshore Postal Code
79745
Onshore City Name
Kermit
Onshore County Name
Winkler
Designated Location
Milepost
Designated Name
20+00
Pipe Fac Name
Wtg Booster 10in Tx-Winkler
Segment Name
99991001
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
42
Other Underground Facilities
No
Crossing
No
Pipe Facility Type
Intrastate
System Part Involved
Onshore Pipeline, Including Valve Sites
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
10
Puddle Weld Ind
No
Pipe Wall Thickness
0.25
Pipe Smys
42000
Pipe Specification
Unknown
Pipe Seam Type
Longitudinal Erw - Unknown Frequency
Pipe Manufacturer
Unknown
Pipe Coating Type
Epoxy
Coating Applied Ind
No
Installation Year
2010
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Rupture
Rupture Orient
Longitudinal
Rupture Length
70
Rupture Width
31.5
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
199
Heat Damage Ind
No
Non Heat Damage Ind
No
Did Occur In Mca Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
14153
Est Cost Intentional Release
0
Est Cost Prop Damage
498000
Est Cost Emergency
2000
Est Cost Other
0
Gas Cost In Mcf
8.49
Prpty
514153
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Wildlife Impact Ind
No
Accident Psig
552
Gas Flow In Pipe In Mcf
9
Mop Psig
720
Mop Cfr Section
192.619(A)(1)
Maop Established Date
2010-10-15 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Gas Required Odorized Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Length Segment Isolated
61248
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
Type C Gathering
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Accident Identifier
Other
Accident Details
Notification From Third Party
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Investigation identified no controller issues. Controller actions were consistent with company protocols.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
General Corrosion
Int Other Corrosion Ind
Yes
Int Corrosion Type Details
See Narrative
Int Metallurgical Basis Ind
Yes
Int Other Loc Ind
Yes
Corrosion Location Details
See Narrative
Corrosion Inhibitors
Yes
Corrosion Lining
No
Cleaning Dewatering
Yes
Corrosion Coupons
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Geometry Deformation Ind
Yes
Axial Recent Year
2019
Axial Rcnt Propul Method
Free Swimming
Axial Rcnt Attuned Detect
Metal Loss
Axial Rcnt Atnd Dtct Metal
High Resolution
Axial Previous Year
2012
Axial Prev Propul Method
Free Swimming
Axial Prev Attuned Detect
Metal Loss
Axial Prev Atnd Dtct Metal
High Resolution
Geometry Recent Year
2019
Geometry Rcnt Propul Method
Free Swimming
Geometry Rcnt Resolution
Standard Resolution
Geometrt Rcnt Measur Cups
No Cups
Geometry Previous Year
2012
Geometry Prev Propul Method
Free Swimming
Geometry Prev Resolution
High Resolution
Geometrt Prev Measur Cups
No Cups
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
C**** P******
Preparer Title
Dot Compliance Specialist
Preparer Email
C************@e*************.com
Preparer Telephone
7139894464
Authorizer Name
C**** K*****
Authorizer Title
Manager - Regulatory Compliance
Authorizer Telephone
9795319036
Authorizer Email
C***********@e*************.com
Narrative
On june 2, 2022, there was a natural gas release on the 99991001 wtg booster 10in tx-winkler_blk b5 sur 3,8,13,14,17,24, a type c gathering line located 4.5 miles south of kermit, tx in winkler county. The line separated and released 1,667 thousand cubic feet of natural gas due to a pipe failure from a defect due to internal corrosion. On june 14, 2022, it was determined that the damage and repairs was going to exceed the $129,300.00 reporting criteria. This event was reported to the nrc # and trrc # 2000 feet of pipe will be replaced with new pipe and to prevent this from occurring in the future, operations will have measurement conduct monthly checks on the three monitors feeding the system and lower the ppm high and high high alarm set points. The affected portion of the pipe was sent to the lab, waiting for results. A supplemental report will be submitted with lab result findings. On july 9, 2022, the pipeline replacement was complete and at 12:00 the pipeline was put back in service. On november 2, 2022, the results of the lab metallurgical analysis indicated significant wall loss due to internal corrosion. The results of the metallurgical analysis indicate that the rupture initiated in the pipe body at the 12:00 orientation and traversed through the pipe for 70-in before arresting. Significant wall loss from internal corrosion was observed in the top half of the pipe due to an upset with the producers which allowed oxygen in the pipe which created the internal corrosion. The failure was not associated with the longitudinal seam. To prevent this from occurring in the future, operations will begin pigging this line twice a week to better disperse injected corrosion inhibitor and ensure line is clean. Oxygen sensors have also been installed on this line to closely monitor the oxygen content of gas stream. Additionally, our chemical company has been instructed to check installed coupons for chemical residue quarterly and perform bacteria tests and make necessary adjustments as needed to the ongoing chemical treatment injection program. This system has also been budgeted for an ili inspection for 2023.
Report Received Date 2022-07-13 00:00:00
Iyear 2022
Report Number 20220067
Supplemental Number 37985
Report Type Supplemental Final
Operator Id 32099 PHMSA Enforcement
Name Energy Transfer Company
Operator Street Address 1300 Main Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2022-06-02 07:30:00
Time Zone Central
Daylight Savings Ind Yes
Location Latitude 31.786444 Google Maps OpenStreetMap
Location Longitude -103.061385 Google Maps OpenStreetMap
Nrc Rpt Num 1338703 NRC Report How to search
Nrc Rpt Datetime 2022-06-14 08:50:00
Additional Nrc Report Numbers 1338920
Commodity Released Type Natural Gas
Unintentional Release 1667
Intentional Release 0
Accompanying Liquid 0.28
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Status When Identified Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind Yes
Shutdown Datetime 2022-06-02 07:30:00
Restart Datetime 2022-07-09 12:00:00
Communication State Fed Ind No
Ignite Ind No
Upstream Action Taken Valve Closure
Upstream Valve Close Datetime 2022-06-02 08:00:00
Downstream Action Taken Valve Closure
Downstream Vlv Close Datetime 2022-06-02 08:30:00
Num Pub Evacuated 0
Incident Identified Datetime 2022-06-02 07:30:00
On Site Datetime 2022-06-02 07:30:00
On Off Shore Onshore
Onshore State Abbreviation Tx
Onshore Postal Code 79745
Onshore City Name Kermit
Onshore County Name Winkler
Designated Location Milepost
Designated Name 20+00
Pipe Fac Name Wtg Booster 10in Tx-Winkler
Segment Name 99991001
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 42
Other Underground Facilities No
Crossing No
Pipe Facility Type Intrastate
System Part Involved Onshore Pipeline, Including Valve Sites
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 10
Puddle Weld Ind No
Pipe Wall Thickness 0.25
Pipe Smys 42000
Pipe Specification Unknown
Pipe Seam Type Longitudinal Erw - Unknown Frequency
Pipe Manufacturer Unknown
Pipe Coating Type Epoxy
Coating Applied Ind No
Installation Year 2010
Manufactured Year Unknown
Material Involved Carbon Steel
Release Type Rupture
Rupture Orient Longitudinal
Rupture Length 70
Rupture Width 31.5
Class Location Type Class 1 Location
Could Be Hca No
Pir Radius 199
Heat Damage Ind No
Non Heat Damage Ind No
Did Occur In Mca Ind No
Est Cost Oper Paid 0
Est Cost Unintentional Release 14153
Est Cost Intentional Release 0
Est Cost Prop Damage 498000
Est Cost Emergency 2000
Est Cost Other 0
Gas Cost In Mcf 8.49
Prpty 514153
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Wildlife Impact Ind No
Accident Psig 552
Gas Flow In Pipe In Mcf 9
Mop Psig 720
Mop Cfr Section 192.619(A)(1) View CFR 49 §192
Maop Established Date 2010-10-15 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Maop
Pressure Restriction Ind No
Gas Required Odorized Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Length Segment Isolated 61248
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function Type C Gathering
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Accident Identifier Other
Accident Details Notification From Third Party
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Investigation identified no controller issues. Controller actions were consistent with company protocols.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details Internal Corrosion
Internal External Internal Corrosion
Int Visual Exam Results General Corrosion
Int Other Corrosion Ind Yes
Int Corrosion Type Details See Narrative
Int Metallurgical Basis Ind Yes
Int Other Loc Ind Yes
Corrosion Location Details See Narrative
Corrosion Inhibitors Yes
Corrosion Lining No
Cleaning Dewatering Yes
Corrosion Coupons Yes
Collected Data Ind Yes
Axial Magnetic Flx Lkg Ind Yes
Geometry Deformation Ind Yes
Axial Recent Year 2019
Axial Rcnt Propul Method Free Swimming
Axial Rcnt Attuned Detect Metal Loss
Axial Rcnt Atnd Dtct Metal High Resolution
Axial Previous Year 2012
Axial Prev Propul Method Free Swimming
Axial Prev Attuned Detect Metal Loss
Axial Prev Atnd Dtct Metal High Resolution
Geometry Recent Year 2019
Geometry Rcnt Propul Method Free Swimming
Geometry Rcnt Resolution Standard Resolution
Geometrt Rcnt Measur Cups No Cups
Geometry Previous Year 2012
Geometry Prev Propul Method Free Swimming
Geometry Prev Resolution High Resolution
Geometrt Prev Measur Cups No Cups
Has Hydrtst Conduc Before Ind No
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name C**** P******
Preparer Title Dot Compliance Specialist
Preparer Email C************@e*************.com
Preparer Telephone 7139894464
Authorizer Name C**** K*****
Authorizer Title Manager - Regulatory Compliance
Authorizer Telephone 9795319036
Authorizer Email C***********@e*************.com
Narrative On june 2, 2022, there was a natural gas release on the 99991001 wtg booster 10in tx-winkler_blk b5 sur 3,8,13,14,17,24, a type c gathering line located 4.5 miles south of kermit, tx in winkler county. The line separated and released 1,667 thousand cubic feet of natural gas due to a pipe failure from a defect due to internal corrosion. On june 14, 2022, it was determined that the damage and repairs was going to exceed the $129,300.00 reporting criteria. This event was reported to the nrc # and trrc # 2000 feet of pipe will be replaced with new pipe and to prevent this from occurring in the future, operations will have measurement conduct monthly checks on the three monitors feeding the system and lower the ppm high and high high alarm set points. The affected portion of the pipe was sent to the lab, waiting for results. A supplemental report will be submitted with lab result findings. On july 9, 2022, the pipeline replacement was complete and at 12:00 the pipeline was put back in service. On november 2, 2022, the results of the lab metallurgical analysis indicated significant wall loss due to internal corrosion. The results of the metallurgical analysis indicate that the rupture initiated in the pipe body at the 12:00 orientation and traversed through the pipe for 70-in before arresting. Significant wall loss from internal corrosion was observed in the top half of the pipe due to an upset with the producers which allowed oxygen in the pipe which created the internal corrosion. The failure was not associated with the longitudinal seam. To prevent this from occurring in the future, operations will begin pigging this line twice a week to better disperse injected corrosion inhibitor and ensure line is clean. Oxygen sensors have also been installed on this line to closely monitor the oxygen content of gas stream. Additionally, our chemical company has been instructed to check installed coupons for chemical residue quarterly and perform bacteria tests and make necessary adjustments as needed to the ongoing chemical treatment injection program. This system has also been budgeted for an ili inspection for 2023.