GD incident on 2022-09-09 — MI

Operator
Consumers Energy Co
Cause
Locating Issue
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$68,869
Incident datetime
2022-09-09 11:23
Report number
Location
MI, MACOMB
Narrative
On september 9, 2022, at approximately 11:23 hours consumers energy received notification of a natural gas pipeline damage on hall road (west of avon lane), clinton township (macomb county), michigan. A gas service worker (gsw) was dispatched and arrived onsite at approximately 11:51 hours. The gsw confirmed the damage which was later determined to be a 2-inch stub (off a 6-inch high-pressure pipeline) struck by a third-party contractor installing drain tiles. A distribution crew arrived onsite at approximately 12:09 hours and proceeded to excavate two remote holes to the east and west of the damage location. While attempting to squeeze the pipeline on the west side of the damage, the pipeline cracked and required excavation at a third location. A mueller control fitting was installed west of the damage to contain the blowing gas. The pipeline was a one-way feed and resulted in a loss of service to 20 customers. No fatalities or injuries occurred because of the incident. The damaged segment of the pipeline was cut out and replaced with approximately 6-feet of 6-inch high-pressure pipeline. Repairs were completed and gas service was restored on september 10, 2022, at approximately 11:35 hours. Service restoration to impacted customers began after repairs to the pipeline were completed. An incident investigation determined the a 2" natural gas stub was documented on the record but was not marked by the staking employee resulting in a natural gas pipeline damage.
Detailed record list
Occurred At
2022-09-09 11:23:00
Year
2022
Report Received Date
2022-10-07 00:00:00
Iyear
2022.0
Report Number
20220065.0
Supplemental Number
37666.0
Report Type
Supplemental Final
Operator Id
Name
Consumers Energy Co
Operator Street Address
One Energy Plaza
Operator City Name
Jackson
Operator State Abbreviation
MI
Operator Postal Code
49201
Local Datetime
2022-09-09 11:23:00
Time Zone
Eastern
Daylight Savings Ind
Yes
Location Street Address
Hall Road W/avon Lane
Location City Name
Clinton Township
Location County Name
Macomb
Location State Abbreviation
MI
Location Postal Code
48036
Location Latitude
Location Longitude
Flow Cont Stopple Fitng Ind
Yes
Nrc Rpt Datetime
2022-09-09 20:03:00
Nrc Rpt Num
Commodity Released Type
Natural Gas
Unintentional Release
6068.0
Intentional Release
0.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Num Pub Evacuated
12.0
Incident Identified Datetime
2022-09-09 11:23:00
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Initial Responder Com Datetime
2022-09-09 13:15:00
On Site Datetime
2022-09-09 11:51:00
Federal
No
Location Type
Utility Right-Of-Way / Easement
Incident Area Type
Underground
Incident Area Subtype
Under Pavement
Depth Of Cover
42.0
Other Underground Facilities
No
Crossing
No
Pipe Facility Type
Investor Owned
System Part Involved
Main
Installation Year
1953.0
Pipe Diameter
6.0
Pipe Specification
Api 5l
Pipe Manufacturer
Unknown
Material Involved
Steel
Steel Seam Type
Longitudinal Erw - Unknown Frequency
Wt Steel
0.219
Release Type
Mechanical Puncture
Puncture Axial
1.2
Puncture Circum
18.8
Class Location Type
Class 3 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
68869.0
Est Cost Emergency
183.0
Est Cost Other
0.0
Gas Cost In Mcf
8.95
Est Cost Unintentional Release
54309.0
Est Cost Intentional Release
0.0
Prpty
123361.0
Commercial Affected
13.0
Industrial Affected
0.0
Residences Affected
7.0
Num Persons Hosp Not Ovnght
0.0
Num Injured Treated By Emt
0.0
Num Resident Building Affctd
7.0
Num Business Building Affctd
13.0
Accident Psig
329.0
Normal Psig
329.0
Mop Psig
400.0
Mop Cfr Section
192.619(A)(2)
Maop Established Date
1994-10-17 00:00:00
Accident Pressure
Pressure Did Not Exceed Maop
Gas Odorized System Type
Injection Pump
Gas Odorized Lvl Not Msrd Ind
Yes
Scada In Place Ind
No
Accident Identifier
Notification From Third Party That Caused The Incident
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
Yes
One Call System Ind
Yes
State Law Exempt Ind
No
Notify Cga Dirt
Yes
Public Row Ind
Yes
Public Subtype
City Street
Excavator Type
Contractor
Excavator Equipment
Backhoe/trackhoe
Work Performed
Drainage
One Call Notified Ind
Yes
One Call Ticket Num
2.02208e+12
Locator Type
Contract Locator
Visible Marks
Yes
Service Interruption
Yes
Service Interruption Hours
24.0
Root Cause Category
Locating Issue
Root Cause Type
Facility Not Marked Due To Incomplete Marks At Damage Location
Preparer Name
C******* Q* K***
Preparer Title
Senior Engineering Technical Analyst Ii
Preparer Email
C************@c********.com
Preparer Telephone
989-280-2963
Local Contact Name
C******* Q* K***
Local Contact Email
C************@c********.com
Local Contact Telephone
989-280-2963
Authorizer Name
J**** E* P****
Authorizer Title
Gas Compliance Manager
Authorizer Telephone
989-598-5031
Authorizer Email
J**********@c********.com
Narrative
On september 9, 2022, at approximately 11:23 hours consumers energy received notification of a natural gas pipeline damage on hall road (west of avon lane), clinton township (macomb county), michigan. A gas service worker (gsw) was dispatched and arrived onsite at approximately 11:51 hours. The gsw confirmed the damage which was later determined to be a 2-inch stub (off a 6-inch high-pressure pipeline) struck by a third-party contractor installing drain tiles. A distribution crew arrived onsite at approximately 12:09 hours and proceeded to excavate two remote holes to the east and west of the damage location. While attempting to squeeze the pipeline on the west side of the damage, the pipeline cracked and required excavation at a third location. A mueller control fitting was installed west of the damage to contain the blowing gas. The pipeline was a one-way feed and resulted in a loss of service to 20 customers. No fatalities or injuries occurred because of the incident. The damaged segment of the pipeline was cut out and replaced with approximately 6-feet of 6-inch high-pressure pipeline. Repairs were completed and gas service was restored on september 10, 2022, at approximately 11:35 hours. Service restoration to impacted customers began after repairs to the pipeline were completed. An incident investigation determined the a 2" natural gas stub was documented on the record but was not marked by the staking employee resulting in a natural gas pipeline damage.
Occurred At 2022-09-09 11:23:00
Year 2022
Report Received Date 2022-10-07 00:00:00
Iyear 2022.0
Report Number 20220065.0
Supplemental Number 37666.0
Report Type Supplemental Final
Operator Id 2748 PHMSA Enforcement
Name Consumers Energy Co
Operator Street Address One Energy Plaza
Operator City Name Jackson
Operator State Abbreviation MI
Operator Postal Code 49201
Local Datetime 2022-09-09 11:23:00
Time Zone Eastern
Daylight Savings Ind Yes
Location Street Address Hall Road W/avon Lane
Location City Name Clinton Township
Location County Name Macomb
Location State Abbreviation MI
Location Postal Code 48036
Location Latitude 42.629864 Google Maps OpenStreetMap
Location Longitude -82.864452 Google Maps OpenStreetMap
Flow Cont Stopple Fitng Ind Yes
Nrc Rpt Datetime 2022-09-09 20:03:00
Nrc Rpt Num 1346895 NRC Report How to search
Commodity Released Type Natural Gas
Unintentional Release 6068.0
Intentional Release 0.0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Ignite Ind No
Num Pub Evacuated 12.0
Incident Identified Datetime 2022-09-09 11:23:00
Communication State Fed Ind Yes
Party Initiated Communication Operator
Initial Responder Com Datetime 2022-09-09 13:15:00
On Site Datetime 2022-09-09 11:51:00
Federal No
Location Type Utility Right-Of-Way / Easement
Incident Area Type Underground
Incident Area Subtype Under Pavement
Depth Of Cover 42.0
Other Underground Facilities No
Crossing No
Pipe Facility Type Investor Owned
System Part Involved Main
Installation Year 1953.0
Pipe Diameter 6.0
Pipe Specification Api 5l
Pipe Manufacturer Unknown
Material Involved Steel
Steel Seam Type Longitudinal Erw - Unknown Frequency
Wt Steel 0.219
Release Type Mechanical Puncture
Puncture Axial 1.2
Puncture Circum 18.8
Class Location Type Class 3 Location
Est Cost Oper Paid 0.0
Est Cost Prop Damage 68869.0
Est Cost Emergency 183.0
Est Cost Other 0.0
Gas Cost In Mcf 8.95
Est Cost Unintentional Release 54309.0
Est Cost Intentional Release 0.0
Prpty 123361.0
Commercial Affected 13.0
Industrial Affected 0.0
Residences Affected 7.0
Num Persons Hosp Not Ovnght 0.0
Num Injured Treated By Emt 0.0
Num Resident Building Affctd 7.0
Num Business Building Affctd 13.0
Accident Psig 329.0
Normal Psig 329.0
Mop Psig 400.0
Mop Cfr Section 192.619(A)(2) View CFR 49 §192
Maop Established Date 1994-10-17 00:00:00
Accident Pressure Pressure Did Not Exceed Maop
Gas Odorized System Type Injection Pump
Gas Odorized Lvl Not Msrd Ind Yes
Scada In Place Ind No
Accident Identifier Notification From Third Party That Caused The Incident
Investigation Status No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Third Party
Ex Party Type Excavation Damage By Third Party
Prior Notification Ind Yes
One Call System Ind Yes
State Law Exempt Ind No
Notify Cga Dirt Yes
Public Row Ind Yes
Public Subtype City Street
Excavator Type Contractor
Excavator Equipment Backhoe/trackhoe
Work Performed Drainage
One Call Notified Ind Yes
One Call Ticket Num 2.02208e+12
Locator Type Contract Locator
Visible Marks Yes
Service Interruption Yes
Service Interruption Hours 24.0
Root Cause Category Locating Issue
Root Cause Type Facility Not Marked Due To Incomplete Marks At Damage Location
Preparer Name C******* Q* K***
Preparer Title Senior Engineering Technical Analyst Ii
Preparer Email C************@c********.com
Preparer Telephone 989-280-2963
Local Contact Name C******* Q* K***
Local Contact Email C************@c********.com
Local Contact Telephone 989-280-2963
Authorizer Name J**** E* P****
Authorizer Title Gas Compliance Manager
Authorizer Telephone 989-598-5031
Authorizer Email J**********@c********.com
Narrative On september 9, 2022, at approximately 11:23 hours consumers energy received notification of a natural gas pipeline damage on hall road (west of avon lane), clinton township (macomb county), michigan. A gas service worker (gsw) was dispatched and arrived onsite at approximately 11:51 hours. The gsw confirmed the damage which was later determined to be a 2-inch stub (off a 6-inch high-pressure pipeline) struck by a third-party contractor installing drain tiles. A distribution crew arrived onsite at approximately 12:09 hours and proceeded to excavate two remote holes to the east and west of the damage location. While attempting to squeeze the pipeline on the west side of the damage, the pipeline cracked and required excavation at a third location. A mueller control fitting was installed west of the damage to contain the blowing gas. The pipeline was a one-way feed and resulted in a loss of service to 20 customers. No fatalities or injuries occurred because of the incident. The damaged segment of the pipeline was cut out and replaced with approximately 6-feet of 6-inch high-pressure pipeline. Repairs were completed and gas service was restored on september 10, 2022, at approximately 11:35 hours. Service restoration to impacted customers began after repairs to the pipeline were completed. An incident investigation determined the a 2" natural gas stub was documented on the record but was not marked by the staking employee resulting in a natural gas pipeline damage.

All rights reserved. Copyright © by ClearPHMSA