GD incident on 2022-06-20 — AL

Operator
Spire Alabama Inc.
Cause
Notification Issue
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities 1 injury
Property damage (nominal)
$23,000
Incident datetime
2022-06-20 11:15
Report number
Location
AL, WALKER
Narrative
A 4" high pressure steel main was damaged by a front end loader and the released gas ignited. The fire totally destroyed the construction equipment, a motor vehicle, and surrounding brush. The front end loader operator was severely burned in the incident and was hospitalized. The excavator did not make any notification to the one call center for line locates. However, pipeline marker signs were near the location that was damaged. The pipeline was shut down to stop the fire and allow for repairs. 467 customers were without service until repairs were completed. Confirmation of the incident condition being met of injury likely requiring hospitalization was determined at 12:48 pm. This was when the operator of the front-end loader was transported by ambulance to the hospital with injuries expected to require admittance. The nrc notification was then made shortly thereafter at 1:24 pm.
Detailed record list
Occurred At
2022-06-20 11:15:00
Year
2022
Report Received Date
2022-07-21 00:00:00
Iyear
2022.0
Report Number
20220053.0
Supplemental Number
37368.0
Report Type
Supplemental Final
Operator Id
Name
Spire Alabama Inc.
Operator Street Address
605 Richard Arrington Jr Blvd N
Operator City Name
Birmingham
Operator State Abbreviation
AL
Operator Postal Code
35203
Local Datetime
2022-06-20 11:15:00
Time Zone
Central
Daylight Savings Ind
Yes
Location Street Address
198 Brick Plant Rd
Location City Name
Cordova
Location County Name
Walker
Location State Abbreviation
AL
Location Postal Code
35550
Location Latitude
Location Longitude
Flow Cont Key Crit Ind
Yes
Nrc Rpt Datetime
2022-06-20 13:24:00
Nrc Rpt Num
Additional Nrc Report Numbers
1339308, 1339472
Commodity Released Type
Natural Gas
Unintentional Release
575.0
Intentional Release
0.0
Fatality Ind
No
Fatal
0
Injury Ind
Yes
Num Emp Injuries
0
Num Contr Injuries
0
Num Er Injuries
0
Num Worker Injuries
1
Num Gp Injuries
0
Injure
1
Ignite Ind
Yes
Ignite Datetime
2022-06-20 11:15:00
How Extinguished
Allowed To Burn Out
Gas Consumed By Fire In Mcf
575
Explode Ind
No
Num Pub Evacuated
0.0
Incident Identified Datetime
2022-06-20 11:15:00
Communication State Fed Ind
No
On Site Datetime
2022-06-20 12:00:00
Federal
No
Location Type
Utility Right-Of-Way / Easement
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Depth Of Cover
34.0
Other Underground Facilities
Yes
Crossing
No
Pipe Facility Type
Investor Owned
System Part Involved
Main
Pipe Diameter
4.0
Pipe Specification
Unknown
Pipe Manufacturer
Unknown
Material Involved
Steel
Steel Seam Type
Longitudinal Erw - Unknown Frequency
Release Type
Mechanical Puncture
Puncture Axial
1.8
Puncture Circum
7.0
Class Location Type
Class 1 Location
Est Cost Oper Paid
60000.0
Est Cost Prop Damage
23000.0
Est Cost Emergency
2000.0
Est Cost Other
119000.0
Est Cost Other Details
Relights And Reconnects
Gas Cost In Mcf
13.07
Est Cost Unintentional Release
7515.0
Est Cost Intentional Release
0.0
Prpty
211515.0
Commercial Affected
66.0
Industrial Affected
1.0
Residences Affected
400.0
Num Persons Hosp Not Ovnght
0.0
Num Injured Treated By Emt
1.0
Num Resident Building Affctd
400.0
Num Business Building Affctd
67.0
Accident Psig
138.0
Normal Psig
138.0
Mop Psig
150.0
Mop Cfr Section
192.619(A)(4)
Maop Established Date
1987-01-01 00:00:00
Accident Pressure
Pressure Did Not Exceed Maop
Gas Odorized System Type
By-Pass
Gas Odorized Lvl Not Msrd Ind
Yes
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Accident Identifier
Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Or Pack Calculations)
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The controller responded to the scada information and made the appropriate notifications.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
No
State Law Exempt Ind
No
Notify Cga Dirt
No
Private Row Ind
Yes
Private Subtype
Private Easement
Pipeline Easement Row Ind
Yes
Excavator Type
Occupant
Excavator Equipment
Unknown/other
Work Performed
Drainage
One Call Notified Ind
No
Locator Type
Unknown/other
Visible Marks
No
Service Interruption
Yes
Service Interruption Hours
27.0
Root Cause Category
Notification Issue
Root Cause Type
No Notification Made To The One-Call Center/811
Excvtn Dmg Third Party Ind
Yes
Preparer Name
R**** W*****
Preparer Title
Director Pipeline Safety And Compliance
Preparer Email
R***********@s**********.com
Preparer Telephone
205-337-1337
Local Contact Name
R**** W*****
Local Contact Email
R***********@s**********.com
Local Contact Telephone
205-337-1337
Authorizer Name
C**** H********
Authorizer Title
Vice President Operations Services And Sms
Authorizer Telephone
314-349-2972
Authorizer Email
C**************@s**********.com
Narrative
A 4" high pressure steel main was damaged by a front end loader and the released gas ignited. The fire totally destroyed the construction equipment, a motor vehicle, and surrounding brush. The front end loader operator was severely burned in the incident and was hospitalized. The excavator did not make any notification to the one call center for line locates. However, pipeline marker signs were near the location that was damaged. The pipeline was shut down to stop the fire and allow for repairs. 467 customers were without service until repairs were completed. Confirmation of the incident condition being met of injury likely requiring hospitalization was determined at 12:48 pm. This was when the operator of the front-end loader was transported by ambulance to the hospital with injuries expected to require admittance. The nrc notification was then made shortly thereafter at 1:24 pm.
Occurred At 2022-06-20 11:15:00
Year 2022
Report Received Date 2022-07-21 00:00:00
Iyear 2022.0
Report Number 20220053.0
Supplemental Number 37368.0
Report Type Supplemental Final
Operator Id 180 PHMSA Enforcement
Name Spire Alabama Inc.
Operator Street Address 605 Richard Arrington Jr Blvd N
Operator City Name Birmingham
Operator State Abbreviation AL
Operator Postal Code 35203
Local Datetime 2022-06-20 11:15:00
Time Zone Central
Daylight Savings Ind Yes
Location Street Address 198 Brick Plant Rd
Location City Name Cordova
Location County Name Walker
Location State Abbreviation AL
Location Postal Code 35550
Location Latitude 33.75781 Google Maps OpenStreetMap
Location Longitude -87.21242 Google Maps OpenStreetMap
Flow Cont Key Crit Ind Yes
Nrc Rpt Datetime 2022-06-20 13:24:00
Nrc Rpt Num 1339286 NRC Report How to search
Additional Nrc Report Numbers 1339308, 1339472
Commodity Released Type Natural Gas
Unintentional Release 575.0
Intentional Release 0.0
Fatality Ind No
Fatal 0
Injury Ind Yes
Num Emp Injuries 0
Num Contr Injuries 0
Num Er Injuries 0
Num Worker Injuries 1
Num Gp Injuries 0
Injure 1
Ignite Ind Yes
Ignite Datetime 2022-06-20 11:15:00
How Extinguished Allowed To Burn Out
Gas Consumed By Fire In Mcf 575
Explode Ind No
Num Pub Evacuated 0.0
Incident Identified Datetime 2022-06-20 11:15:00
Communication State Fed Ind No
On Site Datetime 2022-06-20 12:00:00
Federal No
Location Type Utility Right-Of-Way / Easement
Incident Area Type Underground
Incident Area Subtype Exposed Due To Excavation
Depth Of Cover 34.0
Other Underground Facilities Yes
Crossing No
Pipe Facility Type Investor Owned
System Part Involved Main
Pipe Diameter 4.0
Pipe Specification Unknown
Pipe Manufacturer Unknown
Material Involved Steel
Steel Seam Type Longitudinal Erw - Unknown Frequency
Release Type Mechanical Puncture
Puncture Axial 1.8
Puncture Circum 7.0
Class Location Type Class 1 Location
Est Cost Oper Paid 60000.0
Est Cost Prop Damage 23000.0
Est Cost Emergency 2000.0
Est Cost Other 119000.0
Est Cost Other Details Relights And Reconnects
Gas Cost In Mcf 13.07
Est Cost Unintentional Release 7515.0
Est Cost Intentional Release 0.0
Prpty 211515.0
Commercial Affected 66.0
Industrial Affected 1.0
Residences Affected 400.0
Num Persons Hosp Not Ovnght 0.0
Num Injured Treated By Emt 1.0
Num Resident Building Affctd 400.0
Num Business Building Affctd 67.0
Accident Psig 138.0
Normal Psig 138.0
Mop Psig 150.0
Mop Cfr Section 192.619(A)(4) View CFR 49 §192
Maop Established Date 1987-01-01 00:00:00
Accident Pressure Pressure Did Not Exceed Maop
Gas Odorized System Type By-Pass
Gas Odorized Lvl Not Msrd Ind Yes
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Accident Identifier Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Or Pack Calculations)
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details The controller responded to the scada information and made the appropriate notifications.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Third Party
Ex Party Type Excavation Damage By Third Party
Prior Notification Ind No
State Law Exempt Ind No
Notify Cga Dirt No
Private Row Ind Yes
Private Subtype Private Easement
Pipeline Easement Row Ind Yes
Excavator Type Occupant
Excavator Equipment Unknown/other
Work Performed Drainage
One Call Notified Ind No
Locator Type Unknown/other
Visible Marks No
Service Interruption Yes
Service Interruption Hours 27.0
Root Cause Category Notification Issue
Root Cause Type No Notification Made To The One-Call Center/811
Excvtn Dmg Third Party Ind Yes
Preparer Name R**** W*****
Preparer Title Director Pipeline Safety And Compliance
Preparer Email R***********@s**********.com
Preparer Telephone 205-337-1337
Local Contact Name R**** W*****
Local Contact Email R***********@s**********.com
Local Contact Telephone 205-337-1337
Authorizer Name C**** H********
Authorizer Title Vice President Operations Services And Sms
Authorizer Telephone 314-349-2972
Authorizer Email C**************@s**********.com
Narrative A 4" high pressure steel main was damaged by a front end loader and the released gas ignited. The fire totally destroyed the construction equipment, a motor vehicle, and surrounding brush. The front end loader operator was severely burned in the incident and was hospitalized. The excavator did not make any notification to the one call center for line locates. However, pipeline marker signs were near the location that was damaged. The pipeline was shut down to stop the fire and allow for repairs. 467 customers were without service until repairs were completed. Confirmation of the incident condition being met of injury likely requiring hospitalization was determined at 12:48 pm. This was when the operator of the front-end loader was transported by ambulance to the hospital with injuries expected to require admittance. The nrc notification was then made shortly thereafter at 1:24 pm.

All rights reserved. Copyright © by ClearPHMSA