Incident details
Operator, cause, commodity and consequences with raw source fields.
GTG incident on 2022-02-27 — TX
Operator
Energy Transfer Company
Cause
Equipment Failure
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$500
Incident datetime
2022-02-27 06:20
Report number
Location
TX
Narrative
On 2/27/22 at 6:20, energy transfer gas control called energy transfer (etc) operations technician to notify him of a station esd at the bryson facility. Etc operations technician arrived at the bryson facility at 7:05 and found the station blowdown actively releasing natural gas to atmosphere. Etc operations technician identified the valve that failed to close during the esd and at 7:09 he manually closed the valve to stop the release. The quantity of gas released was calculated and determined to be reportable at 08:20. Initial notification was made to the nrc (report # 1329823) at 8:50 on 2/27/22. The 48-hour update was made to nrc (report # 1329940) at 8:41 on 3/01/22. Further investigation indicated the versa valve on the control valve failed to operate, therefore the control valve failed to close and allowed the release of natural gas from 9166 bryson tap - bryson compressor station 16-inch pipeline. The reason for the esd was loss of instrument air pressure. The 9166 bryson tap - bryson compressor station 16-inch pipeline was idle at the time of the esd. The pipeline was not shutdown as it was not currently needed, however it was available to return to service when needed, at 11:50 on 2/27/22.
Detailed record list
Report Received Date
2022-03-28 00:00:00
Iyear
2022
Report Number
20220038
Supplemental Number
36620
Report Type
Supplemental Final
Operator Id
32099
Name
Energy Transfer Company
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2022-02-27 06:20:00
Time Zone
Central
Daylight Savings Ind
No
Location Latitude
33.10916
Location Longitude
-98.411693
Nrc Rpt Num
1329823
Nrc Rpt Datetime
2022-02-27 08:53:00
Additional Nrc Report Numbers
1329940
Commodity Released Type
Natural Gas
Unintentional Release
4375.3
Intentional Release
0
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Status When Identified
Idle
Communication State Fed Ind
No
Ignite Ind
No
Upstream Action Taken
Valve Closure
Upstream Valve Close Datetime
2022-02-27 06:20:00
Downstream Action Taken
Valve Closure
Downstream Vlv Close Datetime
2022-02-27 07:09:00
Num Pub Evacuated
0
Incident Identified Datetime
2022-02-27 06:20:00
On Site Datetime
2022-02-27 07:05:00
On Off Shore
Onshore
Onshore State Abbreviation
Tx
Onshore Postal Code
76427
Onshore City Name
Bryson
Onshore County Name
Jack
Designated Location
Not Applicable
Pipe Fac Name
Bryson Tap - Bryson Compressor Station
Segment Name
9166 Bryson Tap_ Bryson Comp Station 16-Inch
Federal
No
Location Type
Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
System Part Involved
Onshore Pipeline, Including Valve Sites
Item Involved
Regulator/control Valve
Installation Year
2013
Manufactured Year
2013
Material Involved
Carbon Steel
Release Type
Other
Release Type Details
Release From Station Blowdown
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
384
Heat Damage Ind
No
Non Heat Damage Ind
No
Did Occur In Mca Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
20258
Est Cost Intentional Release
0
Est Cost Prop Damage
500
Est Cost Emergency
0
Est Cost Other
0
Gas Cost In Mcf
4.63
Prpty
20758
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Wildlife Impact Ind
No
Accident Psig
679
Gas Flow In Pipe In Mcf
0
Mop Psig
944
Mop Cfr Section
192.619(A)(1)
Maop Established Date
1974-01-01 00:00:00
Maop Reversal Flow Ind
Bi-Directional
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Gas Required Odorized Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Length Segment Isolated
50
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Accident Identifier
Controller
Operator Type
Operator Employee
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Controller actions did not affect the incident.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Malfunction Of Control/relief Equipment
Eq Failure Type
Malfunction Of Control/relief Equipment
Control Valve Ind
Yes
Instrumentation Ind
Yes
Eq Additional Other Ind
Yes
Eq Additional Other Details
Versa Valve Failed To Shift
Nf Temperature Ind
Yes
Preparer Name
A***** M*****
Preparer Title
Lead Specialist
Preparer Email
A************@e*************.com
Preparer Telephone
903-243-6541
Authorizer Name
C**** K*****
Authorizer Title
Manager - Regulatory Compliance
Authorizer Telephone
713-989-7077
Authorizer Email
C***********@e*************.com
Narrative
On 2/27/22 at 6:20, energy transfer gas control called energy transfer (etc) operations technician to notify him of a station esd at the bryson facility. Etc operations technician arrived at the bryson facility at 7:05 and found the station blowdown actively releasing natural gas to atmosphere. Etc operations technician identified the valve that failed to close during the esd and at 7:09 he manually closed the valve to stop the release. The quantity of gas released was calculated and determined to be reportable at 08:20. Initial notification was made to the nrc (report # 1329823) at 8:50 on 2/27/22. The 48-hour update was made to nrc (report # 1329940) at 8:41 on 3/01/22. Further investigation indicated the versa valve on the control valve failed to operate, therefore the control valve failed to close and allowed the release of natural gas from 9166 bryson tap - bryson compressor station 16-inch pipeline. The reason for the esd was loss of instrument air pressure. The 9166 bryson tap - bryson compressor station 16-inch pipeline was idle at the time of the esd. The pipeline was not shutdown as it was not currently needed, however it was available to return to service when needed, at 11:50 on 2/27/22.
| Report Received Date | 2022-03-28 00:00:00 |
|---|---|
| Iyear | 2022 |
| Report Number | 20220038 |
| Supplemental Number | 36620 |
| Report Type | Supplemental Final |
| Operator Id | 32099 PHMSA Enforcement |
| Name | Energy Transfer Company |
| Operator Street Address | 1300 Main Street |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2022-02-27 06:20:00 |
| Time Zone | Central |
| Daylight Savings Ind | No |
| Location Latitude | 33.10916 Google Maps OpenStreetMap |
| Location Longitude | -98.411693 Google Maps OpenStreetMap |
| Nrc Rpt Num | 1329823 NRC Report How to search |
| Nrc Rpt Datetime | 2022-02-27 08:53:00 |
| Additional Nrc Report Numbers | 1329940 |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 4375.3 |
| Intentional Release | 0 |
| Accompanying Liquid | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Status When Identified | Idle |
| Communication State Fed Ind | No |
| Ignite Ind | No |
| Upstream Action Taken | Valve Closure |
| Upstream Valve Close Datetime | 2022-02-27 06:20:00 |
| Downstream Action Taken | Valve Closure |
| Downstream Vlv Close Datetime | 2022-02-27 07:09:00 |
| Num Pub Evacuated | 0 |
| Incident Identified Datetime | 2022-02-27 06:20:00 |
| On Site Datetime | 2022-02-27 07:05:00 |
| On Off Shore | Onshore |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 76427 |
| Onshore City Name | Bryson |
| Onshore County Name | Jack |
| Designated Location | Not Applicable |
| Pipe Fac Name | Bryson Tap - Bryson Compressor Station |
| Segment Name | 9166 Bryson Tap_ Bryson Comp Station 16-Inch |
| Federal | No |
| Location Type | Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| Item Involved | Regulator/control Valve |
| Installation Year | 2013 |
| Manufactured Year | 2013 |
| Material Involved | Carbon Steel |
| Release Type | Other |
| Release Type Details | Release From Station Blowdown |
| Class Location Type | Class 1 Location |
| Could Be Hca | No |
| Pir Radius | 384 |
| Heat Damage Ind | No |
| Non Heat Damage Ind | No |
| Did Occur In Mca Ind | No |
| Est Cost Oper Paid | 0 |
| Est Cost Unintentional Release | 20258 |
| Est Cost Intentional Release | 0 |
| Est Cost Prop Damage | 500 |
| Est Cost Emergency | 0 |
| Est Cost Other | 0 |
| Gas Cost In Mcf | 4.63 |
| Prpty | 20758 |
| Num Persons Hosp Not Ovnght | 0 |
| Num Injured Treated By Emt | 0 |
| Num Resident Building Affctd | 0 |
| Num Business Building Affctd | 0 |
| Wildlife Impact Ind | No |
| Accident Psig | 679 |
| Gas Flow In Pipe In Mcf | 0 |
| Mop Psig | 944 |
| Mop Cfr Section | 192.619(A)(1) View CFR 49 §192 |
| Maop Established Date | 1974-01-01 00:00:00 |
| Maop Reversal Flow Ind | Bi-Directional |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Pressure Restriction Ind | No |
| Gas Required Odorized Ind | No |
| Upstream Valve Type Ind | Manual |
| Downstream Valve Type Ind | Manual |
| Length Segment Isolated | 50 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | Transmission System |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | Yes |
| Scada Conf Ind | Yes |
| Accident Identifier | Controller |
| Operator Type | Operator Employee |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Controller actions did not affect the incident. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Malfunction Of Control/relief Equipment |
| Eq Failure Type | Malfunction Of Control/relief Equipment |
| Control Valve Ind | Yes |
| Instrumentation Ind | Yes |
| Eq Additional Other Ind | Yes |
| Eq Additional Other Details | Versa Valve Failed To Shift |
| Nf Temperature Ind | Yes |
| Preparer Name | A***** M***** |
| Preparer Title | Lead Specialist |
| Preparer Email | A************@e*************.com |
| Preparer Telephone | 903-243-6541 |
| Authorizer Name | C**** K***** |
| Authorizer Title | Manager - Regulatory Compliance |
| Authorizer Telephone | 713-989-7077 |
| Authorizer Email | C***********@e*************.com |
| Narrative | On 2/27/22 at 6:20, energy transfer gas control called energy transfer (etc) operations technician to notify him of a station esd at the bryson facility. Etc operations technician arrived at the bryson facility at 7:05 and found the station blowdown actively releasing natural gas to atmosphere. Etc operations technician identified the valve that failed to close during the esd and at 7:09 he manually closed the valve to stop the release. The quantity of gas released was calculated and determined to be reportable at 08:20. Initial notification was made to the nrc (report # 1329823) at 8:50 on 2/27/22. The 48-hour update was made to nrc (report # 1329940) at 8:41 on 3/01/22. Further investigation indicated the versa valve on the control valve failed to operate, therefore the control valve failed to close and allowed the release of natural gas from 9166 bryson tap - bryson compressor station 16-inch pipeline. The reason for the esd was loss of instrument air pressure. The 9166 bryson tap - bryson compressor station 16-inch pipeline was idle at the time of the esd. The pipeline was not shutdown as it was not currently needed, however it was available to return to service when needed, at 11:50 on 2/27/22. |