GTG incident on 2022-02-21 — TX
Operator
Texas Eastern Transmission, Lp (Spectra Energy Partners, Lp)
Cause
Excavation Issue
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$5,473,114
Incident datetime
2022-02-21 11:25
Report number
Location
TX
Narrative
At approximately 11:25 p.M. Ct on february 21, 2021, tetlp's 24-inch diameter line 11 transporting natural gas from joaquin compressor station to red river valve site ruptured near m.P. 247.268 in de soto parish louisiana, approximately 2.7 miles downstream of the joaquin compressor station. The rupture did not ignite. The line had minimal flow at the time of the incident (approximately 0.5 mscf/d). At 11:25 p.M. Ct gas control identified a rapidly decreasing discharge pressure at the joaquin compressor station. At 11:27 p.M. Ct gas control closed the joaquin compressor station valve. At 11:34 p.M. Gas control closes valve rcv-11-327 isolating the pipeline segment. Tetlp employees were dispatched to several other valves sites to further mitigate the line blowdown located at the sabine river (11-270) and the mansfield meter station (11-283). Tetlp initiated the notification to the nrc at 12:28 a.M. Ct on february 22, 2022, after receiving confirmed discovery of the pipeline failure and gathering the initial information to make the nrc notification. The apparent cause of the incident is under investigation and will be updated once the investigation is complete. Updated november 2, 2022. The apparent cause of the failure was determined to be 2nd party excavation damage caused during an integrity repair in the area completed in the fall of the previous year. Updated part g apparent cause, and updated estimated damage cost in part d.
Detailed record list
Report Received Date
2022-03-23 00:00:00
Iyear
2022
Report Number
20220034
Supplemental Number
37300
Report Type
Supplemental Final
Operator Id
19235
Name
Texas Eastern Transmission, Lp (Spectra Energy Partners, Lp)
Operator Street Address
915 North Eldridge Parkway
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77079
Local Datetime
2022-02-21 11:25:00
Time Zone
Central
Daylight Savings Ind
No
Location Latitude
31.96422778
Location Longitude
-93.96757777
Nrc Rpt Num
1329420
Nrc Rpt Datetime
2022-02-22 00:28:00
Additional Nrc Report Numbers
1329583
Commodity Released Type
Natural Gas
Unintentional Release
37070
Intentional Release
2100
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Status When Identified
Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2022-02-21 11:34:00
Restart Datetime
2022-07-06 10:40:00
Communication State Fed Ind
Yes
Party Initiated Communication
Local/state/federal Emergency Responder
Initial Responder Com Datetime
2022-02-21 11:43:00
Ignite Ind
No
Upstream Action Taken
Valve Closure
Upstream Valve Close Datetime
2022-02-21 11:27:00
Downstream Action Taken
Valve Closure
Downstream Vlv Close Datetime
2022-02-21 11:34:00
Num Pub Evacuated
0
Incident Identified Datetime
2022-02-21 11:25:00
On Site Datetime
2022-02-22 01:50:00
On Off Shore
Onshore
Onshore State Abbreviation
La
Onshore Postal Code
71049
Onshore City Name
Not Within A Municipality
Onshore County Name
De Soto
Designated Location
Milepost
Designated Name
247.628
Pipe Fac Name
Texas Eastern Line 11
Segment Name
Joqn-Redr /11 Vs-03
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
60
Other Underground Facilities
No
Crossing
No
Pipe Facility Type
Interstate
System Part Involved
Onshore Pipeline, Including Valve Sites
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
24
Puddle Weld Ind
No
Pipe Wall Thickness
0.312
Pipe Smys
52000
Pipe Specification
Api-5l
Pipe Seam Type
Flash Welded
Pipe Manufacturer
A.o. Smith
Pipe Coating Type
Coal Tar
Coating Applied Ind
No
Installation Year
1953
Manufactured Year
1953
Material Involved
Carbon Steel
Release Type
Rupture
Rupture Orient
Longitudinal
Rupture Length
1324
Rupture Width
60
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
517
Heat Damage Ind
No
Non Heat Damage Ind
No
Did Occur In Mca Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
166815
Est Cost Intentional Release
9450
Est Cost Prop Damage
5473114
Est Cost Emergency
2644000
Est Cost Other
0
Gas Cost In Mcf
4.5
Prpty
8293379
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Wildlife Impact Ind
No
Accident Psig
901
Gas Flow In Pipe In Mcf
0
Mop Psig
973
Mop Cfr Section
192.619(A)(1)
Maop Established Date
2015-05-01 00:00:00
Maop Reversal Flow Ind
Bi-Directional
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Gas Required Odorized Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Remotely Controlled
Length Segment Isolated
89500
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Accident Identifier
Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Or Pack Calculations)
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
Yes
Num Employees Tested
7
Num Employees Failed
0
Num Contractors Tested
1
Num Contractors Failed
0
Cause
Excavation Damage
Cause Details
Excavation Damage By Operator's Contractor (Second Party)
Ex Party Type
Excavation Damage By Operator's Contractor (Second Party)
Notify Cga Dirt
Yes
Private Row Ind
Yes
Private Subtype
Private Landowner
Pipeline Easement Row Ind
Yes
Excavator Type
Contractor
Excavator Equipment
Unknown/other
Work Performed
Natural Gas
One Call Notified Ind
Yes
One Call Ticket Num
210333944
One Call Center Name
Louisiana 811.
Locator Type
Facility Owner
Visible Marks
Yes
Service Interruption
No
Root Cause Category
Excavation Issue
Root Cause Type
Excavator Failed To Maintain Clearance After Verifying Marks
Preparer Name
M****** M******
Preparer Email
M**************@e*******.com
Preparer Telephone
6128056542
Authorizer Name
N***** A****
Authorizer Telephone
17136275008
Authorizer Email
N***********@e*******.com
Narrative
At approximately 11:25 p.M. Ct on february 21, 2021, tetlp's 24-inch diameter line 11 transporting natural gas from joaquin compressor station to red river valve site ruptured near m.P. 247.268 in de soto parish louisiana, approximately 2.7 miles downstream of the joaquin compressor station. The rupture did not ignite. The line had minimal flow at the time of the incident (approximately 0.5 mscf/d). At 11:25 p.M. Ct gas control identified a rapidly decreasing discharge pressure at the joaquin compressor station. At 11:27 p.M. Ct gas control closed the joaquin compressor station valve. At 11:34 p.M. Gas control closes valve rcv-11-327 isolating the pipeline segment. Tetlp employees were dispatched to several other valves sites to further mitigate the line blowdown located at the sabine river (11-270) and the mansfield meter station (11-283). Tetlp initiated the notification to the nrc at 12:28 a.M. Ct on february 22, 2022, after receiving confirmed discovery of the pipeline failure and gathering the initial information to make the nrc notification. The apparent cause of the incident is under investigation and will be updated once the investigation is complete. Updated november 2, 2022. The apparent cause of the failure was determined to be 2nd party excavation damage caused during an integrity repair in the area completed in the fall of the previous year. Updated part g apparent cause, and updated estimated damage cost in part d.
| Report Received Date | 2022-03-23 00:00:00 |
|---|---|
| Iyear | 2022 |
| Report Number | 20220034 |
| Supplemental Number | 37300 |
| Report Type | Supplemental Final |
| Operator Id | 19235 PHMSA Enforcement |
| Name | Texas Eastern Transmission, Lp (Spectra Energy Partners, Lp) |
| Operator Street Address | 915 North Eldridge Parkway |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77079 |
| Local Datetime | 2022-02-21 11:25:00 |
| Time Zone | Central |
| Daylight Savings Ind | No |
| Location Latitude | 31.96422778 Google Maps OpenStreetMap |
| Location Longitude | -93.96757777 Google Maps OpenStreetMap |
| Nrc Rpt Num | 1329420 NRC Report How to search |
| Nrc Rpt Datetime | 2022-02-22 00:28:00 |
| Additional Nrc Report Numbers | 1329583 |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 37070 |
| Intentional Release | 2100 |
| Accompanying Liquid | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Status When Identified | Normal Operation, Includes Pauses During Maintenance |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2022-02-21 11:34:00 |
| Restart Datetime | 2022-07-06 10:40:00 |
| Communication State Fed Ind | Yes |
| Party Initiated Communication | Local/state/federal Emergency Responder |
| Initial Responder Com Datetime | 2022-02-21 11:43:00 |
| Ignite Ind | No |
| Upstream Action Taken | Valve Closure |
| Upstream Valve Close Datetime | 2022-02-21 11:27:00 |
| Downstream Action Taken | Valve Closure |
| Downstream Vlv Close Datetime | 2022-02-21 11:34:00 |
| Num Pub Evacuated | 0 |
| Incident Identified Datetime | 2022-02-21 11:25:00 |
| On Site Datetime | 2022-02-22 01:50:00 |
| On Off Shore | Onshore |
| Onshore State Abbreviation | La |
| Onshore Postal Code | 71049 |
| Onshore City Name | Not Within A Municipality |
| Onshore County Name | De Soto |
| Designated Location | Milepost |
| Designated Name | 247.628 |
| Pipe Fac Name | Texas Eastern Line 11 |
| Segment Name | Joqn-Redr /11 Vs-03 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 60 |
| Other Underground Facilities | No |
| Crossing | No |
| Pipe Facility Type | Interstate |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 24 |
| Puddle Weld Ind | No |
| Pipe Wall Thickness | 0.312 |
| Pipe Smys | 52000 |
| Pipe Specification | Api-5l |
| Pipe Seam Type | Flash Welded |
| Pipe Manufacturer | A.o. Smith |
| Pipe Coating Type | Coal Tar |
| Coating Applied Ind | No |
| Installation Year | 1953 |
| Manufactured Year | 1953 |
| Material Involved | Carbon Steel |
| Release Type | Rupture |
| Rupture Orient | Longitudinal |
| Rupture Length | 1324 |
| Rupture Width | 60 |
| Class Location Type | Class 1 Location |
| Could Be Hca | No |
| Pir Radius | 517 |
| Heat Damage Ind | No |
| Non Heat Damage Ind | No |
| Did Occur In Mca Ind | No |
| Est Cost Oper Paid | 0 |
| Est Cost Unintentional Release | 166815 |
| Est Cost Intentional Release | 9450 |
| Est Cost Prop Damage | 5473114 |
| Est Cost Emergency | 2644000 |
| Est Cost Other | 0 |
| Gas Cost In Mcf | 4.5 |
| Prpty | 8293379 |
| Num Persons Hosp Not Ovnght | 0 |
| Num Injured Treated By Emt | 0 |
| Num Resident Building Affctd | 0 |
| Num Business Building Affctd | 0 |
| Wildlife Impact Ind | No |
| Accident Psig | 901 |
| Gas Flow In Pipe In Mcf | 0 |
| Mop Psig | 973 |
| Mop Cfr Section | 192.619(A)(1) View CFR 49 §192 |
| Maop Established Date | 2015-05-01 00:00:00 |
| Maop Reversal Flow Ind | Bi-Directional |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Pressure Restriction Ind | No |
| Gas Required Odorized Ind | No |
| Upstream Valve Type Ind | Manual |
| Downstream Valve Type Ind | Remotely Controlled |
| Length Segment Isolated | 89500 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | Transmission System |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | Yes |
| Scada Conf Ind | Yes |
| Accident Identifier | Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Or Pack Calculations) |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest Schedule Ind | Yes |
| Invest No Control Room Ind | Yes |
| Invest No Controller Ind | Yes |
| Employee Drug Test Ind | Yes |
| Contractor Drug Test Ind | Yes |
| Num Employees Tested | 7 |
| Num Employees Failed | 0 |
| Num Contractors Tested | 1 |
| Num Contractors Failed | 0 |
| Cause | Excavation Damage |
| Cause Details | Excavation Damage By Operator's Contractor (Second Party) |
| Ex Party Type | Excavation Damage By Operator's Contractor (Second Party) |
| Notify Cga Dirt | Yes |
| Private Row Ind | Yes |
| Private Subtype | Private Landowner |
| Pipeline Easement Row Ind | Yes |
| Excavator Type | Contractor |
| Excavator Equipment | Unknown/other |
| Work Performed | Natural Gas |
| One Call Notified Ind | Yes |
| One Call Ticket Num | 210333944 |
| One Call Center Name | Louisiana 811. |
| Locator Type | Facility Owner |
| Visible Marks | Yes |
| Service Interruption | No |
| Root Cause Category | Excavation Issue |
| Root Cause Type | Excavator Failed To Maintain Clearance After Verifying Marks |
| Preparer Name | M****** M****** |
| Preparer Email | M**************@e*******.com |
| Preparer Telephone | 6128056542 |
| Authorizer Name | N***** A**** |
| Authorizer Telephone | 17136275008 |
| Authorizer Email | N***********@e*******.com |
| Narrative | At approximately 11:25 p.M. Ct on february 21, 2021, tetlp's 24-inch diameter line 11 transporting natural gas from joaquin compressor station to red river valve site ruptured near m.P. 247.268 in de soto parish louisiana, approximately 2.7 miles downstream of the joaquin compressor station. The rupture did not ignite. The line had minimal flow at the time of the incident (approximately 0.5 mscf/d). At 11:25 p.M. Ct gas control identified a rapidly decreasing discharge pressure at the joaquin compressor station. At 11:27 p.M. Ct gas control closed the joaquin compressor station valve. At 11:34 p.M. Gas control closes valve rcv-11-327 isolating the pipeline segment. Tetlp employees were dispatched to several other valves sites to further mitigate the line blowdown located at the sabine river (11-270) and the mansfield meter station (11-283). Tetlp initiated the notification to the nrc at 12:28 a.M. Ct on february 22, 2022, after receiving confirmed discovery of the pipeline failure and gathering the initial information to make the nrc notification. The apparent cause of the incident is under investigation and will be updated once the investigation is complete. Updated november 2, 2022. The apparent cause of the failure was determined to be 2nd party excavation damage caused during an integrity repair in the area completed in the fall of the previous year. Updated part g apparent cause, and updated estimated damage cost in part d. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA