Incident details
Operator, cause, commodity and consequences with raw source fields.
GTG incident on 2022-01-31 — TX
Operator
Columbia Gas Transmission, Llc
Cause
Equipment Failure
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$460,000
Incident datetime
2022-01-31 17:51
Report number
Location
TX
Narrative
On january 31st, 2022, brinker compressor station (cs) experienced an unintentional release of natural gas (material) into atmosphere. Brinker is a transmission cs that is operated and maintained by columbia gas transmission, llc (company), a tc energy entity. Brinker cs is located in columbiana county, ohio. At 17:45 est, a company employee received a notification from the public of a fire at brinker cs. Company operations personnel arrived on-site at 18:00 est and the fire on the dehydration unit was confirmed. After an initial assessment of the situation and taking all safety precautions, personnel isolated the fuel gas supply to the dehydration system at 18:35 est and the fire was extinguished. The preliminary material loss calculation was determined to be 44 mcf. On february 4, 2022, after the damage caused by the fire was fully evaluated and assessed, it was determined that the cost of repairs may exceed $122,000 so the event was promptly reported to the national response center (nrc). An investigation team was formed to determine the probable cause of the fire on the dehydration unit. The initial nrc report no.1328093 and the nrc 48-hour report no.1328149 have been received on february 4th and february 5th respectively. An investigation was completed, and the following casual factors (cf) were identified: 1- internal mesh of the contractor prevented wet glycol return valve for closing. 2- due to the glycol flooding the reboiler and surge tank, gas pressure did not reach pressure safety valve (psv)-100 that was located on reboiler, therefore psv-100 did not activate to release gas pressure. The following recommendations were issued in order to avoid future re-occurrence from taking place at this cs. 1- create preventive maintenance and monitoring plan specifically for the brinker contact tower with increased internal inspection 2- the tower will be replaced. 3- install high level alarm for the reboiler and surge tank that alarms to the station control panel and high-high switch to drain the reboiler the project at brinker cs was completed and dehy was placed into service on december 2, 2022,
Detailed record list
Report Received Date
2022-02-28 00:00:00
Iyear
2022
Report Number
20220021
Supplemental Number
37436
Report Type
Supplemental Final
Operator Id
2616
Name
Columbia Gas Transmission, Llc
Operator Street Address
700 Louisiana St. Suite 700
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2022-02-04 14:20:00
Time Zone
Eastern
Daylight Savings Ind
No
Location Latitude
40.82479
Location Longitude
-80.75669
Nrc Rpt Num
1328093
Nrc Rpt Datetime
2022-02-04 14:50:00
Additional Nrc Report Numbers
1328149
Commodity Released Type
Natural Gas
Unintentional Release
40
Intentional Release
0
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Status When Identified
Normal Operation, Includes Pauses During Maintenance
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2022-01-31 19:10:00
Restart Datetime
2022-12-02 13:30:00
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Initial Responder Com Datetime
2022-01-01 18:45:00
Ignite Ind
Yes
Ignite Datetime
2022-01-31 17:45:00
How Extinguished
Operator/contractor
Gas Consumed By Fire In Mcf
40
Explode Ind
No
Num Pub Evacuated
0
Incident Identified Datetime
2022-01-31 17:51:00
On Site Datetime
2022-01-31 18:00:00
On Off Shore
Onshore
Onshore State Abbreviation
Oh
Onshore Postal Code
44431
Onshore City Name
Leetonia
Onshore County Name
Columbiana
Designated Location
Not Applicable
Pipe Fac Name
Brinker Compressor Station
Segment Name
Dehydration System
Federal
No
Location Type
Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
System Part Involved
Onshore Compressor Station Equipment And Piping
Item Involved
Dehydrator/drier/treater/scrubber
Installation Year
Unknown
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Crack
Class Location Type
Class 2 Location
Could Be Hca
No
Pir Radius
65
Heat Damage Ind
No
Non Heat Damage Ind
No
Did Occur In Mca Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
132
Est Cost Intentional Release
0
Est Cost Prop Damage
460000
Est Cost Emergency
1000
Est Cost Other
0
Gas Cost In Mcf
3.3
Prpty
461132
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Wildlife Impact Ind
No
Accident Psig
40
Gas Flow In Pipe In Mcf
1179
Mop Psig
50
Mop Cfr Section
192.619(A)(1)
Maop Established Date
2003-06-01 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Gas Required Odorized Ind
Yes
Gas Odorized Ind
Yes
Pipeline Function
Transmission System
Scada In Place Ind
No
Accident Identifier
Notification From Public
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The fire was not due to any involvements by gas control personnel.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Other Equipment Failure
Eq Failure Type
Other Equipment Failure
Eq Failure Details
Fire On Dehydration Unit
Eq Additional Other Ind
Yes
Eq Additional Other Details
An Investigation Team Was Formed To Determine The Probable Cause Of The Fire
Preparer Name
K***** R****** A*******
Preparer Email
K*************@t*******.com
Preparer Telephone
(304)590-5956
Authorizer Name
P*** S******
Authorizer Telephone
(304)550-4866
Authorizer Email
P***********@t*******.com
Narrative
On january 31st, 2022, brinker compressor station (cs) experienced an unintentional release of natural gas (material) into atmosphere. Brinker is a transmission cs that is operated and maintained by columbia gas transmission, llc (company), a tc energy entity. Brinker cs is located in columbiana county, ohio. At 17:45 est, a company employee received a notification from the public of a fire at brinker cs. Company operations personnel arrived on-site at 18:00 est and the fire on the dehydration unit was confirmed. After an initial assessment of the situation and taking all safety precautions, personnel isolated the fuel gas supply to the dehydration system at 18:35 est and the fire was extinguished. The preliminary material loss calculation was determined to be 44 mcf. On february 4, 2022, after the damage caused by the fire was fully evaluated and assessed, it was determined that the cost of repairs may exceed $122,000 so the event was promptly reported to the national response center (nrc). An investigation team was formed to determine the probable cause of the fire on the dehydration unit. The initial nrc report no.1328093 and the nrc 48-hour report no.1328149 have been received on february 4th and february 5th respectively. An investigation was completed, and the following casual factors (cf) were identified: 1- internal mesh of the contractor prevented wet glycol return valve for closing. 2- due to the glycol flooding the reboiler and surge tank, gas pressure did not reach pressure safety valve (psv)-100 that was located on reboiler, therefore psv-100 did not activate to release gas pressure. The following recommendations were issued in order to avoid future re-occurrence from taking place at this cs. 1- create preventive maintenance and monitoring plan specifically for the brinker contact tower with increased internal inspection 2- the tower will be replaced. 3- install high level alarm for the reboiler and surge tank that alarms to the station control panel and high-high switch to drain the reboiler the project at brinker cs was completed and dehy was placed into service on december 2, 2022,
| Report Received Date | 2022-02-28 00:00:00 |
|---|---|
| Iyear | 2022 |
| Report Number | 20220021 |
| Supplemental Number | 37436 |
| Report Type | Supplemental Final |
| Operator Id | 2616 PHMSA Enforcement |
| Name | Columbia Gas Transmission, Llc |
| Operator Street Address | 700 Louisiana St. Suite 700 |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2022-02-04 14:20:00 |
| Time Zone | Eastern |
| Daylight Savings Ind | No |
| Location Latitude | 40.82479 Google Maps OpenStreetMap |
| Location Longitude | -80.75669 Google Maps OpenStreetMap |
| Nrc Rpt Num | 1328093 NRC Report How to search |
| Nrc Rpt Datetime | 2022-02-04 14:50:00 |
| Additional Nrc Report Numbers | 1328149 |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 40 |
| Intentional Release | 0 |
| Accompanying Liquid | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Status When Identified | Normal Operation, Includes Pauses During Maintenance |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2022-01-31 19:10:00 |
| Restart Datetime | 2022-12-02 13:30:00 |
| Communication State Fed Ind | Yes |
| Party Initiated Communication | Operator |
| Initial Responder Com Datetime | 2022-01-01 18:45:00 |
| Ignite Ind | Yes |
| Ignite Datetime | 2022-01-31 17:45:00 |
| How Extinguished | Operator/contractor |
| Gas Consumed By Fire In Mcf | 40 |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Incident Identified Datetime | 2022-01-31 17:51:00 |
| On Site Datetime | 2022-01-31 18:00:00 |
| On Off Shore | Onshore |
| Onshore State Abbreviation | Oh |
| Onshore Postal Code | 44431 |
| Onshore City Name | Leetonia |
| Onshore County Name | Columbiana |
| Designated Location | Not Applicable |
| Pipe Fac Name | Brinker Compressor Station |
| Segment Name | Dehydration System |
| Federal | No |
| Location Type | Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Interstate |
| System Part Involved | Onshore Compressor Station Equipment And Piping |
| Item Involved | Dehydrator/drier/treater/scrubber |
| Installation Year | Unknown |
| Manufactured Year | Unknown |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Crack |
| Class Location Type | Class 2 Location |
| Could Be Hca | No |
| Pir Radius | 65 |
| Heat Damage Ind | No |
| Non Heat Damage Ind | No |
| Did Occur In Mca Ind | No |
| Est Cost Oper Paid | 0 |
| Est Cost Unintentional Release | 132 |
| Est Cost Intentional Release | 0 |
| Est Cost Prop Damage | 460000 |
| Est Cost Emergency | 1000 |
| Est Cost Other | 0 |
| Gas Cost In Mcf | 3.3 |
| Prpty | 461132 |
| Num Persons Hosp Not Ovnght | 0 |
| Num Injured Treated By Emt | 0 |
| Num Resident Building Affctd | 0 |
| Num Business Building Affctd | 0 |
| Wildlife Impact Ind | No |
| Accident Psig | 40 |
| Gas Flow In Pipe In Mcf | 1179 |
| Mop Psig | 50 |
| Mop Cfr Section | 192.619(A)(1) View CFR 49 §192 |
| Maop Established Date | 2003-06-01 00:00:00 |
| Maop Reversal Flow Ind | No |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Pressure Restriction Ind | No |
| Gas Required Odorized Ind | Yes |
| Gas Odorized Ind | Yes |
| Pipeline Function | Transmission System |
| Scada In Place Ind | No |
| Accident Identifier | Notification From Public |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | The fire was not due to any involvements by gas control personnel. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Other Equipment Failure |
| Eq Failure Type | Other Equipment Failure |
| Eq Failure Details | Fire On Dehydration Unit |
| Eq Additional Other Ind | Yes |
| Eq Additional Other Details | An Investigation Team Was Formed To Determine The Probable Cause Of The Fire |
| Preparer Name | K***** R****** A******* |
| Preparer Email | K*************@t*******.com |
| Preparer Telephone | (304)590-5956 |
| Authorizer Name | P*** S****** |
| Authorizer Telephone | (304)550-4866 |
| Authorizer Email | P***********@t*******.com |
| Narrative | On january 31st, 2022, brinker compressor station (cs) experienced an unintentional release of natural gas (material) into atmosphere. Brinker is a transmission cs that is operated and maintained by columbia gas transmission, llc (company), a tc energy entity. Brinker cs is located in columbiana county, ohio. At 17:45 est, a company employee received a notification from the public of a fire at brinker cs. Company operations personnel arrived on-site at 18:00 est and the fire on the dehydration unit was confirmed. After an initial assessment of the situation and taking all safety precautions, personnel isolated the fuel gas supply to the dehydration system at 18:35 est and the fire was extinguished. The preliminary material loss calculation was determined to be 44 mcf. On february 4, 2022, after the damage caused by the fire was fully evaluated and assessed, it was determined that the cost of repairs may exceed $122,000 so the event was promptly reported to the national response center (nrc). An investigation team was formed to determine the probable cause of the fire on the dehydration unit. The initial nrc report no.1328093 and the nrc 48-hour report no.1328149 have been received on february 4th and february 5th respectively. An investigation was completed, and the following casual factors (cf) were identified: 1- internal mesh of the contractor prevented wet glycol return valve for closing. 2- due to the glycol flooding the reboiler and surge tank, gas pressure did not reach pressure safety valve (psv)-100 that was located on reboiler, therefore psv-100 did not activate to release gas pressure. The following recommendations were issued in order to avoid future re-occurrence from taking place at this cs. 1- create preventive maintenance and monitoring plan specifically for the brinker contact tower with increased internal inspection 2- the tower will be replaced. 3- install high level alarm for the reboiler and surge tank that alarms to the station control panel and high-high switch to drain the reboiler the project at brinker cs was completed and dehy was placed into service on december 2, 2022, |