GD incident on 2022-01-24 — HI

Operator
Hawaii Gas
Cause
Locating Issue
Commodity
Synthetic Gas
Program
GD
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$25,000
Incident datetime
2022-01-24 09:02
Report number
Location
HI, HONOLULU
Narrative
Incident summary on monday, january 24, 2022, frank coluccio construction ("fcc") was performing a sewer installation on a portion of waiakamilo road in honolulu, hawaii, with an auger. At approximately 9:02 a.M., on the portion of waiakamilo road between hart street and kalani street, the auger struck a hawai'I gas ("hg") underground 8-inch pipeline ("subject segment"). The auger caused an approximately 3-inch long fracture along the top of the pipeline. The subject segment began to leak gas. Hg's first responder arrived on site at approximately 9:15 a.M. And confirmed the damage to the subject segment. Due to the magnitude of the leak, hg called the honolulu fire department ("hfd") at approximately 10:19 a.M. To assist in securing the roadway and to help monitor the hot zone. Hg's maintenance crew arrived on site at approximately 10:30 a.M. And began assessing repairs. At approximately 11:15 a.M., hfd began evacuating nearby commercial buildings. Hg was able to stop the flow of gas to the subject segment at approximately 5:35 p.M., january 24, 2022. Final repairs were completed at approximately 11:00 p.M., january 24, 2022. Hawai'I gas involvement prior to incident hg installed the subject segment in 1940. The subject segment is an 8-inch bare steel pipe. Hg maps and records contain no indication that the subject segment was repaired, altered or excavated since its installation. On monday, january 3, 2022, fcc submitted one call ticket number 22000022 to the hawaii one call center indicating that fcc would be excavating "on waiakamilo road between dillingham boulevard and hart street (ewa side of road)" ("excavation area"). In response to ticket no. 22000022, hg reviewed gis maps of the excavation area and determined that an underground main line was located within that area. On january 10, 2022, hg personnel attempted to perform toning on the underground main line in the excavation area but noted that the location of the underground main line had already been marked by another party in yellow paint. Please contact hg for additional narrative detail. Also, please note that this investigation is still ongoing. Update 6/10/2022 upon completion of the investigation by hg, it was determined that toning of the subject segment was performed inadequately by hg. As indicated in the "incident summary" section above, the underground main line had already been marked by another party in yellow paint and hg failed to confirm the markings were correct when responding to ticket no. 22000022. As a result of the investigation, hg has incorporated the following mitigative actions into its toning operations as of may 2022: 1. Revise "hg one call pipe location guidelines" document. A. All painted utility markings by hg will have a unique hg identifier. B. All existing utility markings (whether by hg or 3rd party) shall be reverified in response to an 811 ticket. 2. Update training requirements for all hg employees who conduct utility locations. A. Initial training requirements (oq & "hg one call pipe location guidelines" document review). B. Refresher training requirements (pipe location refresher training to be provided in 2022 and every 3 years after or when probable cause is determined by hg management). C. Documentation retention requirements. Hg is confident the mitigative actions listed above will help to further reduce toning related incidents going forward. Please contact hg for additional narrative detail.
Detailed record list
Occurred At
2022-01-24 09:02:00
Year
2022
Report Received Date
2022-02-23 00:00:00
Iyear
2022.0
Report Number
20220015.0
Supplemental Number
36773.0
Report Type
Supplemental Final
Operator Id
Name
Hawaii Gas
Operator Street Address
515 Kamakee Street (P.o. Box 3000)
Operator City Name
Honolulu
Operator State Abbreviation
HI
Operator Postal Code
96802-3000
Local Datetime
2022-01-24 11:15:00
Time Zone
Hawaii-Aleutian
Daylight Savings Ind
No
Location Street Address
Waiakamilo Road (Between Hart St & Kalani St)
Location City Name
Honolulu
Location County Name
Honolulu
Location State Abbreviation
HI
Location Postal Code
96817
Location Latitude
Location Longitude
Flow Cont Key Crit Ind
Yes
Nrc Rpt Datetime
2022-01-24 12:30:00
Nrc Rpt Num
Additional Nrc Report Numbers
1327369 And 1327376
Commodity Released Type
Synthetic Gas
Unintentional Release
550.0
Intentional Release
0.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Num Pub Evacuated
100.0
Incident Identified Datetime
2022-01-24 09:02:00
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Initial Responder Com Datetime
2022-01-24 10:19:00
On Site Datetime
2022-01-24 09:15:00
Federal
No
Location Type
Public Property
Incident Area Type
Underground
Incident Area Subtype
Under Pavement
Depth Of Cover
48.0
Other Underground Facilities
No
Crossing
No
Pipe Facility Type
Privately Owned
System Part Involved
Main
Installation Year
1940.0
Pipe Diameter
8.0
Pipe Specification
Unknown
Pipe Manufacturer
Unknown
Material Involved
Steel
Steel Seam Type
Other
Steel Seam Type Details
Unknown
Wt Steel
0.625
Release Type
Mechanical Puncture
Puncture Axial
3.0
Puncture Circum
1.0
Class Location Type
Class 4 Location
Est Cost Oper Paid
100000.0
Est Cost Prop Damage
25000.0
Est Cost Emergency
20000.0
Est Cost Other
0.0
Gas Cost In Mcf
46.67
Est Cost Unintentional Release
25669.0
Est Cost Intentional Release
0.0
Prpty
170669.0
Commercial Affected
0.0
Industrial Affected
0.0
Residences Affected
0.0
Num Persons Hosp Not Ovnght
0.0
Num Injured Treated By Emt
0.0
Num Resident Building Affctd
0.0
Num Business Building Affctd
5.0
Accident Psig
31.0
Normal Psig
33.0
Mop Psig
50.0
Mop Cfr Section
Maop Established Date
1999-03-31 00:00:00
Accident Pressure
Pressure Did Not Exceed Maop
Gas Odorized System Type
Injection Pump
Gas Odorized Lvl Not Msrd Ind
Yes
Scada In Place Ind
No
Accident Identifier
Notification From Third Party That Caused The Incident
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
Yes
One Call System Ind
Yes
State Law Exempt Ind
No
Notify Cga Dirt
Yes
Public Row Ind
Yes
Public Subtype
City Street
Excavator Type
Contractor
Excavator Equipment
Auger
Work Performed
Sewer (Sanitary/storm)
One Call Notified Ind
Yes
One Call Ticket Num
22000022
Locator Type
Unknown/other
Visible Marks
Yes
Service Interruption
No
Root Cause Category
Locating Issue
Root Cause Type
Facility Not Marked Due To Incomplete Marks At Damage Location
Io Inadequate Procedure Ind
Yes
Preparer Name
C********** H***
Preparer Title
Imp Engineer
Preparer Email
C****@h********.com
Preparer Telephone
808-594-5553
Local Contact Name
C**** H***
Local Contact Email
C****@h********.com
Local Contact Telephone
808-594-5553
Authorizer Name
K**** N********
Authorizer Title
Vice President Operations
Authorizer Telephone
808-594-5573
Authorizer Email
K*******@h********.com
Narrative
Incident summary on monday, january 24, 2022, frank coluccio construction ("fcc") was performing a sewer installation on a portion of waiakamilo road in honolulu, hawaii, with an auger. At approximately 9:02 a.M., on the portion of waiakamilo road between hart street and kalani street, the auger struck a hawai'I gas ("hg") underground 8-inch pipeline ("subject segment"). The auger caused an approximately 3-inch long fracture along the top of the pipeline. The subject segment began to leak gas. Hg's first responder arrived on site at approximately 9:15 a.M. And confirmed the damage to the subject segment. Due to the magnitude of the leak, hg called the honolulu fire department ("hfd") at approximately 10:19 a.M. To assist in securing the roadway and to help monitor the hot zone. Hg's maintenance crew arrived on site at approximately 10:30 a.M. And began assessing repairs. At approximately 11:15 a.M., hfd began evacuating nearby commercial buildings. Hg was able to stop the flow of gas to the subject segment at approximately 5:35 p.M., january 24, 2022. Final repairs were completed at approximately 11:00 p.M., january 24, 2022. Hawai'I gas involvement prior to incident hg installed the subject segment in 1940. The subject segment is an 8-inch bare steel pipe. Hg maps and records contain no indication that the subject segment was repaired, altered or excavated since its installation. On monday, january 3, 2022, fcc submitted one call ticket number 22000022 to the hawaii one call center indicating that fcc would be excavating "on waiakamilo road between dillingham boulevard and hart street (ewa side of road)" ("excavation area"). In response to ticket no. 22000022, hg reviewed gis maps of the excavation area and determined that an underground main line was located within that area. On january 10, 2022, hg personnel attempted to perform toning on the underground main line in the excavation area but noted that the location of the underground main line had already been marked by another party in yellow paint. Please contact hg for additional narrative detail. Also, please note that this investigation is still ongoing. Update 6/10/2022 upon completion of the investigation by hg, it was determined that toning of the subject segment was performed inadequately by hg. As indicated in the "incident summary" section above, the underground main line had already been marked by another party in yellow paint and hg failed to confirm the markings were correct when responding to ticket no. 22000022. As a result of the investigation, hg has incorporated the following mitigative actions into its toning operations as of may 2022: 1. Revise "hg one call pipe location guidelines" document. A. All painted utility markings by hg will have a unique hg identifier. B. All existing utility markings (whether by hg or 3rd party) shall be reverified in response to an 811 ticket. 2. Update training requirements for all hg employees who conduct utility locations. A. Initial training requirements (oq & "hg one call pipe location guidelines" document review). B. Refresher training requirements (pipe location refresher training to be provided in 2022 and every 3 years after or when probable cause is determined by hg management). C. Documentation retention requirements. Hg is confident the mitigative actions listed above will help to further reduce toning related incidents going forward. Please contact hg for additional narrative detail.
Occurred At 2022-01-24 09:02:00
Year 2022
Report Received Date 2022-02-23 00:00:00
Iyear 2022.0
Report Number 20220015.0
Supplemental Number 36773.0
Report Type Supplemental Final
Operator Id 6243 PHMSA Enforcement
Name Hawaii Gas
Operator Street Address 515 Kamakee Street (P.o. Box 3000)
Operator City Name Honolulu
Operator State Abbreviation HI
Operator Postal Code 96802-3000
Local Datetime 2022-01-24 11:15:00
Time Zone Hawaii-Aleutian
Daylight Savings Ind No
Location Street Address Waiakamilo Road (Between Hart St & Kalani St)
Location City Name Honolulu
Location County Name Honolulu
Location State Abbreviation HI
Location Postal Code 96817
Location Latitude 21.32236 Google Maps OpenStreetMap
Location Longitude -157.878238 Google Maps OpenStreetMap
Flow Cont Key Crit Ind Yes
Nrc Rpt Datetime 2022-01-24 12:30:00
Nrc Rpt Num 1327229 NRC Report How to search
Additional Nrc Report Numbers 1327369 And 1327376
Commodity Released Type Synthetic Gas
Unintentional Release 550.0
Intentional Release 0.0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Ignite Ind No
Num Pub Evacuated 100.0
Incident Identified Datetime 2022-01-24 09:02:00
Communication State Fed Ind Yes
Party Initiated Communication Operator
Initial Responder Com Datetime 2022-01-24 10:19:00
On Site Datetime 2022-01-24 09:15:00
Federal No
Location Type Public Property
Incident Area Type Underground
Incident Area Subtype Under Pavement
Depth Of Cover 48.0
Other Underground Facilities No
Crossing No
Pipe Facility Type Privately Owned
System Part Involved Main
Installation Year 1940.0
Pipe Diameter 8.0
Pipe Specification Unknown
Pipe Manufacturer Unknown
Material Involved Steel
Steel Seam Type Other
Steel Seam Type Details Unknown
Wt Steel 0.625
Release Type Mechanical Puncture
Puncture Axial 3.0
Puncture Circum 1.0
Class Location Type Class 4 Location
Est Cost Oper Paid 100000.0
Est Cost Prop Damage 25000.0
Est Cost Emergency 20000.0
Est Cost Other 0.0
Gas Cost In Mcf 46.67
Est Cost Unintentional Release 25669.0
Est Cost Intentional Release 0.0
Prpty 170669.0
Commercial Affected 0.0
Industrial Affected 0.0
Residences Affected 0.0
Num Persons Hosp Not Ovnght 0.0
Num Injured Treated By Emt 0.0
Num Resident Building Affctd 0.0
Num Business Building Affctd 5.0
Accident Psig 31.0
Normal Psig 33.0
Mop Psig 50.0
Mop Cfr Section 192.619(C) View CFR 49 §192
Maop Established Date 1999-03-31 00:00:00
Accident Pressure Pressure Did Not Exceed Maop
Gas Odorized System Type Injection Pump
Gas Odorized Lvl Not Msrd Ind Yes
Scada In Place Ind No
Accident Identifier Notification From Third Party That Caused The Incident
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind Yes
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Third Party
Ex Party Type Excavation Damage By Third Party
Prior Notification Ind Yes
One Call System Ind Yes
State Law Exempt Ind No
Notify Cga Dirt Yes
Public Row Ind Yes
Public Subtype City Street
Excavator Type Contractor
Excavator Equipment Auger
Work Performed Sewer (Sanitary/storm)
One Call Notified Ind Yes
One Call Ticket Num 22000022
Locator Type Unknown/other
Visible Marks Yes
Service Interruption No
Root Cause Category Locating Issue
Root Cause Type Facility Not Marked Due To Incomplete Marks At Damage Location
Io Inadequate Procedure Ind Yes
Preparer Name C********** H***
Preparer Title Imp Engineer
Preparer Email C****@h********.com
Preparer Telephone 808-594-5553
Local Contact Name C**** H***
Local Contact Email C****@h********.com
Local Contact Telephone 808-594-5553
Authorizer Name K**** N********
Authorizer Title Vice President Operations
Authorizer Telephone 808-594-5573
Authorizer Email K*******@h********.com
Narrative Incident summary on monday, january 24, 2022, frank coluccio construction ("fcc") was performing a sewer installation on a portion of waiakamilo road in honolulu, hawaii, with an auger. At approximately 9:02 a.M., on the portion of waiakamilo road between hart street and kalani street, the auger struck a hawai'I gas ("hg") underground 8-inch pipeline ("subject segment"). The auger caused an approximately 3-inch long fracture along the top of the pipeline. The subject segment began to leak gas. Hg's first responder arrived on site at approximately 9:15 a.M. And confirmed the damage to the subject segment. Due to the magnitude of the leak, hg called the honolulu fire department ("hfd") at approximately 10:19 a.M. To assist in securing the roadway and to help monitor the hot zone. Hg's maintenance crew arrived on site at approximately 10:30 a.M. And began assessing repairs. At approximately 11:15 a.M., hfd began evacuating nearby commercial buildings. Hg was able to stop the flow of gas to the subject segment at approximately 5:35 p.M., january 24, 2022. Final repairs were completed at approximately 11:00 p.M., january 24, 2022. Hawai'I gas involvement prior to incident hg installed the subject segment in 1940. The subject segment is an 8-inch bare steel pipe. Hg maps and records contain no indication that the subject segment was repaired, altered or excavated since its installation. On monday, january 3, 2022, fcc submitted one call ticket number 22000022 to the hawaii one call center indicating that fcc would be excavating "on waiakamilo road between dillingham boulevard and hart street (ewa side of road)" ("excavation area"). In response to ticket no. 22000022, hg reviewed gis maps of the excavation area and determined that an underground main line was located within that area. On january 10, 2022, hg personnel attempted to perform toning on the underground main line in the excavation area but noted that the location of the underground main line had already been marked by another party in yellow paint. Please contact hg for additional narrative detail. Also, please note that this investigation is still ongoing. Update 6/10/2022 upon completion of the investigation by hg, it was determined that toning of the subject segment was performed inadequately by hg. As indicated in the "incident summary" section above, the underground main line had already been marked by another party in yellow paint and hg failed to confirm the markings were correct when responding to ticket no. 22000022. As a result of the investigation, hg has incorporated the following mitigative actions into its toning operations as of may 2022: 1. Revise "hg one call pipe location guidelines" document. A. All painted utility markings by hg will have a unique hg identifier. B. All existing utility markings (whether by hg or 3rd party) shall be reverified in response to an 811 ticket. 2. Update training requirements for all hg employees who conduct utility locations. A. Initial training requirements (oq & "hg one call pipe location guidelines" document review). B. Refresher training requirements (pipe location refresher training to be provided in 2022 and every 3 years after or when probable cause is determined by hg management). C. Documentation retention requirements. Hg is confident the mitigative actions listed above will help to further reduce toning related incidents going forward. Please contact hg for additional narrative detail.

All rights reserved. Copyright © by ClearPHMSA