Incident details
Operator, cause, commodity and consequences with raw source fields.
GD incident on 2022-01-04 — NC
Operator
Monroe Natural Gas Dept, City Of
Cause
Excavation Issue
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$52,266
Incident datetime
2022-01-04 15:09
Report number
Location
NC, UNION
Narrative
On 01/04/2022 at 3:09 pm - cdm smith struck the city of monroe's 6-inch steel 275 psig gas main while making a bore across the intersection of rocky river road and secrest shortcut road in monroe nc. The bore was for the installation of a 42 inch water main within a 54" casing. The gas main was properly located and the contractor failed to perform due diligence in accordance with north carolina general statutes chapter 87 article 8a - underground utility safety and damage prevention act. The gas main was ruptured by the auger bore machine causing the release of natural gas and requiring the repair of the gas line. Repairs to the city of monroe natural gas main were finalized on 01/06/2022 at 3:30 am. On 1/04/2022 at 05:15 pm the city of monroe determined that the incident reporting threshold was going to be met before the facilities could be repaired. Therefore a determination of filing the initial incident with nrc was made. The nrc notification was made at approximately 6:00 pm on 1/4/2022. The actual incident threshold of 3,000 mcf was not met until approximately 1/05/2022 at approximately 05:26 am. Cdm was negligent in the following requirements: nc article 8a - underground utility safety and damage prevention act - 87-122. Excavator responsibilities c) an excavator shall comply with the following: (3) plan the excavation or demolition to avoid damage to or minimize interference with facilities in or near the construction area. (9) an excavator shall not perform any excavation or demolition within the tolerance zone unless the excavator complies with all of the following conditions: a. The excavator shall not use mechanized equipment, except, noninvasive equipment specifically designed or intended to protect the integrity of the facility, within the marked tolerance zone of an existing facility until: 1. The excavator has visually identified the precise location of the facility or has visually confirmed that no facility is present up to the depth of excavation; 2. The excavator has taken reasonable precautions to avoid any substantial weakening of the facility's structural or lateral support, or both, or penetration or destruction of the facilities or their protective coatings: b. The excavator shall maintain clearance between a facility and the cutting edge point of any mechanized equipment, taking into account the known limit of control of the cutting edge or point, as may be reasonably necessary to avoid damage to the facility. The city of monroe accurately marked the 6-inch steel gas line. Cdm smith did not comply with the requirements within the tolerance zone. Cdm smith did not visually inspect the gas facility at the depth of the excavation. Cdm smith is responsible for the damage due to negligence and non-compliance with the nc underground utility safety and damage prevention act.
Detailed record list
Occurred At
2022-01-04 15:09:00
Year
2022
Report Received Date
2022-02-08 00:00:00
Iyear
2022.0
Report Number
20220010.0
Supplemental Number
36314.0
Report Type
Original
Operator Id
12672
Name
Monroe Natural Gas Dept, City Of
Operator Street Address
300 W. Crowell Street
Operator City Name
Monroe
Operator State Abbreviation
NC
Operator Postal Code
28112
Local Datetime
2022-01-04 17:15:00
Time Zone
Eastern
Daylight Savings Ind
No
Location Street Address
Intersection Of Rocky River Rd And Secrest Short Cut Rd.
Location City Name
Monroe
Location County Name
Union
Location State Abbreviation
NC
Location Postal Code
28110
Location Latitude
35.057065
Location Longitude
-80.593644
Flow Cont Key Crit Ind
Yes
Nrc Rpt Datetime
2022-01-04 18:00:00
Nrc Rpt Num
1325889
Additional Nrc Report Numbers
1326041, 1326048
Commodity Released Type
Natural Gas
Unintentional Release
4266.5
Intentional Release
0.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Num Pub Evacuated
0.0
Incident Identified Datetime
2022-01-04 15:09:00
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Initial Responder Com Datetime
2022-01-04 15:13:00
On Site Datetime
2022-01-04 15:30:00
Federal
No
Location Type
Public Property
Incident Area Type
Underground
Incident Area Subtype
Under Pavement
Depth Of Cover
127.0
Other Underground Facilities
No
Crossing
Yes
Road Crossing Ind
Yes
Road Type
Cased, Bored/drilled
Pipe Facility Type
Municipally Owned
System Part Involved
Main
Installation Year
2006.0
Manufactured Year
2004.0
Pipe Diameter
6.0
Pipe Specification
Api 5l Grade B
Pipe Manufacturer
Unknown
Material Involved
Steel
Steel Seam Type
Longitudinal Erw - High Frequency
Wt Steel
0.188
Release Type
Mechanical Puncture
Puncture Axial
0.2
Puncture Circum
4.0
Class Location Type
Class 3 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
52266.0
Est Cost Emergency
0.0
Est Cost Other
0.0
Gas Cost In Mcf
16.8755
Est Cost Unintentional Release
71999.0
Est Cost Intentional Release
0.0
Prpty
124265.0
Commercial Affected
0.0
Industrial Affected
0.0
Residences Affected
0.0
Num Persons Hosp Not Ovnght
0.0
Num Injured Treated By Emt
0.0
Num Resident Building Affctd
0.0
Num Business Building Affctd
0.0
Accident Psig
265.0
Normal Psig
265.0
Mop Psig
275.0
Mop Cfr Section
192.619(A)(1)
Maop Established Date
2006-03-30 00:00:00
Accident Pressure
Pressure Did Not Exceed Maop
Gas Odorized System Type
Odorized By Others
Gas Odorized Level
5.8
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Notification From Third Party That Caused The Incident
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
Yes
One Call System Ind
Yes
State Law Exempt Ind
No
Notify Cga Dirt
Yes
Public Row Ind
Yes
Public Subtype
State Highway
Excavator Type
Contractor
Excavator Equipment
Boring
Work Performed
Water
One Call Notified Ind
Yes
One Call Ticket Num
C213551031
Locator Type
Facility Owner
Visible Marks
Yes
Service Interruption
No
Root Cause Category
Excavation Issue
Root Cause Type
Improper Excavation Practice Not Listed Above
Preparer Name
D***** D* L** S*****
Preparer Title
Natural Gas Engineering And Compliance Manager
Preparer Email
D***********@m*******.org
Preparer Telephone
7042824697
Preparer Fax
704-283-6492
Local Contact Name
R***** M*****
Local Contact Email
R******@m*******.org
Local Contact Telephone
704-282-4638
Authorizer Name
D**** L*****
Authorizer Title
Director Of Energy Services
Authorizer Telephone
704-282-4602
Authorizer Email
D******@m*******.org
Narrative
On 01/04/2022 at 3:09 pm - cdm smith struck the city of monroe's 6-inch steel 275 psig gas main while making a bore across the intersection of rocky river road and secrest shortcut road in monroe nc. The bore was for the installation of a 42 inch water main within a 54" casing. The gas main was properly located and the contractor failed to perform due diligence in accordance with north carolina general statutes chapter 87 article 8a - underground utility safety and damage prevention act. The gas main was ruptured by the auger bore machine causing the release of natural gas and requiring the repair of the gas line. Repairs to the city of monroe natural gas main were finalized on 01/06/2022 at 3:30 am. On 1/04/2022 at 05:15 pm the city of monroe determined that the incident reporting threshold was going to be met before the facilities could be repaired. Therefore a determination of filing the initial incident with nrc was made. The nrc notification was made at approximately 6:00 pm on 1/4/2022. The actual incident threshold of 3,000 mcf was not met until approximately 1/05/2022 at approximately 05:26 am. Cdm was negligent in the following requirements: nc article 8a - underground utility safety and damage prevention act - 87-122. Excavator responsibilities c) an excavator shall comply with the following: (3) plan the excavation or demolition to avoid damage to or minimize interference with facilities in or near the construction area. (9) an excavator shall not perform any excavation or demolition within the tolerance zone unless the excavator complies with all of the following conditions: a. The excavator shall not use mechanized equipment, except, noninvasive equipment specifically designed or intended to protect the integrity of the facility, within the marked tolerance zone of an existing facility until: 1. The excavator has visually identified the precise location of the facility or has visually confirmed that no facility is present up to the depth of excavation; 2. The excavator has taken reasonable precautions to avoid any substantial weakening of the facility's structural or lateral support, or both, or penetration or destruction of the facilities or their protective coatings: b. The excavator shall maintain clearance between a facility and the cutting edge point of any mechanized equipment, taking into account the known limit of control of the cutting edge or point, as may be reasonably necessary to avoid damage to the facility. The city of monroe accurately marked the 6-inch steel gas line. Cdm smith did not comply with the requirements within the tolerance zone. Cdm smith did not visually inspect the gas facility at the depth of the excavation. Cdm smith is responsible for the damage due to negligence and non-compliance with the nc underground utility safety and damage prevention act.
| Occurred At | 2022-01-04 15:09:00 |
|---|---|
| Year | 2022 |
| Report Received Date | 2022-02-08 00:00:00 |
| Iyear | 2022.0 |
| Report Number | 20220010.0 |
| Supplemental Number | 36314.0 |
| Report Type | Original |
| Operator Id | 12672 PHMSA Enforcement |
| Name | Monroe Natural Gas Dept, City Of |
| Operator Street Address | 300 W. Crowell Street |
| Operator City Name | Monroe |
| Operator State Abbreviation | NC |
| Operator Postal Code | 28112 |
| Local Datetime | 2022-01-04 17:15:00 |
| Time Zone | Eastern |
| Daylight Savings Ind | No |
| Location Street Address | Intersection Of Rocky River Rd And Secrest Short Cut Rd. |
| Location City Name | Monroe |
| Location County Name | Union |
| Location State Abbreviation | NC |
| Location Postal Code | 28110 |
| Location Latitude | 35.057065 Google Maps OpenStreetMap |
| Location Longitude | -80.593644 Google Maps OpenStreetMap |
| Flow Cont Key Crit Ind | Yes |
| Nrc Rpt Datetime | 2022-01-04 18:00:00 |
| Nrc Rpt Num | 1325889 NRC Report How to search |
| Additional Nrc Report Numbers | 1326041, 1326048 |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 4266.5 |
| Intentional Release | 0.0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Ignite Ind | No |
| Num Pub Evacuated | 0.0 |
| Incident Identified Datetime | 2022-01-04 15:09:00 |
| Communication State Fed Ind | Yes |
| Party Initiated Communication | Operator |
| Initial Responder Com Datetime | 2022-01-04 15:13:00 |
| On Site Datetime | 2022-01-04 15:30:00 |
| Federal | No |
| Location Type | Public Property |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Pavement |
| Depth Of Cover | 127.0 |
| Other Underground Facilities | No |
| Crossing | Yes |
| Road Crossing Ind | Yes |
| Road Type | Cased, Bored/drilled |
| Pipe Facility Type | Municipally Owned |
| System Part Involved | Main |
| Installation Year | 2006.0 |
| Manufactured Year | 2004.0 |
| Pipe Diameter | 6.0 |
| Pipe Specification | Api 5l Grade B |
| Pipe Manufacturer | Unknown |
| Material Involved | Steel |
| Steel Seam Type | Longitudinal Erw - High Frequency |
| Wt Steel | 0.188 |
| Release Type | Mechanical Puncture |
| Puncture Axial | 0.2 |
| Puncture Circum | 4.0 |
| Class Location Type | Class 3 Location |
| Est Cost Oper Paid | 0.0 |
| Est Cost Prop Damage | 52266.0 |
| Est Cost Emergency | 0.0 |
| Est Cost Other | 0.0 |
| Gas Cost In Mcf | 16.8755 |
| Est Cost Unintentional Release | 71999.0 |
| Est Cost Intentional Release | 0.0 |
| Prpty | 124265.0 |
| Commercial Affected | 0.0 |
| Industrial Affected | 0.0 |
| Residences Affected | 0.0 |
| Num Persons Hosp Not Ovnght | 0.0 |
| Num Injured Treated By Emt | 0.0 |
| Num Resident Building Affctd | 0.0 |
| Num Business Building Affctd | 0.0 |
| Accident Psig | 265.0 |
| Normal Psig | 265.0 |
| Mop Psig | 275.0 |
| Mop Cfr Section | 192.619(A)(1) View CFR 49 §192 |
| Maop Established Date | 2006-03-30 00:00:00 |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Gas Odorized System Type | Odorized By Others |
| Gas Odorized Level | 5.8 |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Accident Identifier | Notification From Third Party That Caused The Incident |
| Investigation Status | No, the facility was not monitored by a controller(s) at the time of the incident |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Excavation Damage |
| Cause Details | Excavation Damage By Third Party |
| Ex Party Type | Excavation Damage By Third Party |
| Prior Notification Ind | Yes |
| One Call System Ind | Yes |
| State Law Exempt Ind | No |
| Notify Cga Dirt | Yes |
| Public Row Ind | Yes |
| Public Subtype | State Highway |
| Excavator Type | Contractor |
| Excavator Equipment | Boring |
| Work Performed | Water |
| One Call Notified Ind | Yes |
| One Call Ticket Num | C213551031 |
| Locator Type | Facility Owner |
| Visible Marks | Yes |
| Service Interruption | No |
| Root Cause Category | Excavation Issue |
| Root Cause Type | Improper Excavation Practice Not Listed Above |
| Preparer Name | D***** D* L** S***** |
| Preparer Title | Natural Gas Engineering And Compliance Manager |
| Preparer Email | D***********@m*******.org |
| Preparer Telephone | 7042824697 |
| Preparer Fax | 704-283-6492 |
| Local Contact Name | R***** M***** |
| Local Contact Email | R******@m*******.org |
| Local Contact Telephone | 704-282-4638 |
| Authorizer Name | D**** L***** |
| Authorizer Title | Director Of Energy Services |
| Authorizer Telephone | 704-282-4602 |
| Authorizer Email | D******@m*******.org |
| Narrative | On 01/04/2022 at 3:09 pm - cdm smith struck the city of monroe's 6-inch steel 275 psig gas main while making a bore across the intersection of rocky river road and secrest shortcut road in monroe nc. The bore was for the installation of a 42 inch water main within a 54" casing. The gas main was properly located and the contractor failed to perform due diligence in accordance with north carolina general statutes chapter 87 article 8a - underground utility safety and damage prevention act. The gas main was ruptured by the auger bore machine causing the release of natural gas and requiring the repair of the gas line. Repairs to the city of monroe natural gas main were finalized on 01/06/2022 at 3:30 am. On 1/04/2022 at 05:15 pm the city of monroe determined that the incident reporting threshold was going to be met before the facilities could be repaired. Therefore a determination of filing the initial incident with nrc was made. The nrc notification was made at approximately 6:00 pm on 1/4/2022. The actual incident threshold of 3,000 mcf was not met until approximately 1/05/2022 at approximately 05:26 am. Cdm was negligent in the following requirements: nc article 8a - underground utility safety and damage prevention act - 87-122. Excavator responsibilities c) an excavator shall comply with the following: (3) plan the excavation or demolition to avoid damage to or minimize interference with facilities in or near the construction area. (9) an excavator shall not perform any excavation or demolition within the tolerance zone unless the excavator complies with all of the following conditions: a. The excavator shall not use mechanized equipment, except, noninvasive equipment specifically designed or intended to protect the integrity of the facility, within the marked tolerance zone of an existing facility until: 1. The excavator has visually identified the precise location of the facility or has visually confirmed that no facility is present up to the depth of excavation; 2. The excavator has taken reasonable precautions to avoid any substantial weakening of the facility's structural or lateral support, or both, or penetration or destruction of the facilities or their protective coatings: b. The excavator shall maintain clearance between a facility and the cutting edge point of any mechanized equipment, taking into account the known limit of control of the cutting edge or point, as may be reasonably necessary to avoid damage to the facility. The city of monroe accurately marked the 6-inch steel gas line. Cdm smith did not comply with the requirements within the tolerance zone. Cdm smith did not visually inspect the gas facility at the depth of the excavation. Cdm smith is responsible for the damage due to negligence and non-compliance with the nc underground utility safety and damage prevention act. |