HL incident on 2021-12-01 — TX
Operator
Express Holdings (Usa), Llc
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$45,000
Incident datetime
2021-12-01 13:30
Report number
Location
TX
Narrative
On december 1, 2021 at approximately 1:30 pm mst a release was discovered at the gurley terminal inside the tank 603 containment. The edmonton control center was notified, and line 41 was shut down and gurley terminal was isolated until the source of the release could be determined. Approximately 0.5 barrels of crude oil was released. The nrc was notified on december 1, 2021 at 2:23 pm mst (nrc# 1323357). A 48-hour update to the nrc was made on december 2, 2021 at 3:31 pm mst (nrc# 1323479). The source of the release was identified as an out of service 8" recirculation line on tank 603. The section of pipe was cut out and the line was isolated by installing blind flanges. Approximately 17.5 tons of contaminated soil was removed from the release site. After further investigation the cause of the release was determined to be due to localized internal corrosion pitting that originated from the bottom side of a mitered bend on the recirculation line. A third-party metallurgical analysis found excess weld material on the interior surface that formed a crevice with the pipe wall causing crevice corrosion. The presence of a relatively large, round pit indicated that a mound/tubercle may have been present prior to the release suggestive of under-deposit corrosion. When the line was taken out of service it could not be pigged due to the piping configuration and the cleaning method used did not adequately remove all residual product. Several action plans have been created that aim to lower the risk on the remaining gurley tank recirculation lines in service and those out of service. Another action plan is put forth to improve processes around identifying and managing hazards related to cleaning plans.
Detailed record list
Report Received Date
2021-12-31 00:00:00
Iyear
2021
Report Number
20210356
Supplemental Number
36626
Report Type
Supplemental Final
Operator Id
31720
Name
Express Holdings (Usa), Llc
Operator Street Address
915 N Eldridge Parkway, Suite 1100
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77079
Local Datetime
2021-12-01 13:30:00
Time Zone
Mountain
Daylight Savings Ind
No
Location Latitude
41.320577
Location Longitude
-102.877036
Commodity Released Type
Crude Oil
Unintentional Release Bbls
0.5
Recovered Bbls
0.5
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2021-12-01 13:30:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Status When Identified
Idle
Communication State Fed Ind
No
On Site Datetime
2021-12-01 13:30:00
Confirmed Discovery Datetime
2021-12-01 13:30:00
Nrc Rpt Datetime
2021-12-01 14:23:00
Nrc Rpt Num
1323357
Additional Nrc Report Numbers
1323479
Ignite Ind
No
Notify Qualified Indiv Ind
No
Oil Spill Removal Org Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Gurley Terminal
Segment Name
Tank 603 Recirculation Line
Onshore State Abbreviation
Ne
Onshore Postal Code
69141
Onshore City Name
Gurley
Onshore County Name
Cheyenne
Designated Location
Survey Station No.
Designated Name
1257
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
6
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
8
Pipe Wall Thickness
0.322
Pipe Smys
35000
Pipe Specification
Unknown
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Unknown
Pipe Coating Type
None
Coating Applied Ind
No
Installation Year
1985
Manufactured Year
1985
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
42
Est Cost Prop Damage
45000
Est Cost Emergency
135000
Est Cost Environmental
45000
Est Cost Other
0
Prpty
225042
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
50
Mop Psig
200
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
2009-10-26 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Lack of control center involvement. There were no indications to the operator that they could have identified a release.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Other Corrosion Ind
Yes
Int Corrosion Type Details
Crevice Corrosion/under-Deposit Corrosion
Int Metallurgical Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Int Elbow Loc Ind
Yes
Corrosion Inhibitors
Yes
Corrosion Lining
No
Cleaning Dewatering
Not Applicable - Not Mainline Pipe
Corrosion Coupons
Not Applicable - Not Mainline Pipe
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2009
Hydrtst Most Rcnt Pressure
200
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
S**** S****
Preparer Title
Sr Compliance Analyst
Preparer Email
S**********@e*******.com
Preparer Telephone
218-206-5872
Prepared Date
2022-04-28 00:00:00
Authorizer Name
S**** D*****
Authorizer Telephone
715-718-1236
Authorizer Title
Supervisor Us Pipeline Compliance
Authorizer Email
S************@e*******.com
Narrative
On december 1, 2021 at approximately 1:30 pm mst a release was discovered at the gurley terminal inside the tank 603 containment. The edmonton control center was notified, and line 41 was shut down and gurley terminal was isolated until the source of the release could be determined. Approximately 0.5 barrels of crude oil was released. The nrc was notified on december 1, 2021 at 2:23 pm mst (nrc# 1323357). A 48-hour update to the nrc was made on december 2, 2021 at 3:31 pm mst (nrc# 1323479). The source of the release was identified as an out of service 8" recirculation line on tank 603. The section of pipe was cut out and the line was isolated by installing blind flanges. Approximately 17.5 tons of contaminated soil was removed from the release site. After further investigation the cause of the release was determined to be due to localized internal corrosion pitting that originated from the bottom side of a mitered bend on the recirculation line. A third-party metallurgical analysis found excess weld material on the interior surface that formed a crevice with the pipe wall causing crevice corrosion. The presence of a relatively large, round pit indicated that a mound/tubercle may have been present prior to the release suggestive of under-deposit corrosion. When the line was taken out of service it could not be pigged due to the piping configuration and the cleaning method used did not adequately remove all residual product. Several action plans have been created that aim to lower the risk on the remaining gurley tank recirculation lines in service and those out of service. Another action plan is put forth to improve processes around identifying and managing hazards related to cleaning plans.
| Report Received Date | 2021-12-31 00:00:00 |
|---|---|
| Iyear | 2021 |
| Report Number | 20210356 |
| Supplemental Number | 36626 |
| Report Type | Supplemental Final |
| Operator Id | 31720 PHMSA Enforcement |
| Name | Express Holdings (Usa), Llc |
| Operator Street Address | 915 N Eldridge Parkway, Suite 1100 |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77079 |
| Local Datetime | 2021-12-01 13:30:00 |
| Time Zone | Mountain |
| Daylight Savings Ind | No |
| Location Latitude | 41.320577 Google Maps OpenStreetMap |
| Location Longitude | -102.877036 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 0.5 |
| Recovered Bbls | 0.5 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2021-12-01 13:30:00 |
| System Part Involved | Onshore Terminal/tank Farm Equipment And Piping |
| On Off Shore | Onshore |
| Status When Identified | Idle |
| Communication State Fed Ind | No |
| On Site Datetime | 2021-12-01 13:30:00 |
| Confirmed Discovery Datetime | 2021-12-01 13:30:00 |
| Nrc Rpt Datetime | 2021-12-01 14:23:00 |
| Nrc Rpt Num | 1323357 NRC Report How to search |
| Additional Nrc Report Numbers | 1323479 |
| Ignite Ind | No |
| Notify Qualified Indiv Ind | No |
| Oil Spill Removal Org Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Gurley Terminal |
| Segment Name | Tank 603 Recirculation Line |
| Onshore State Abbreviation | Ne |
| Onshore Postal Code | 69141 |
| Onshore City Name | Gurley |
| Onshore County Name | Cheyenne |
| Designated Location | Survey Station No. |
| Designated Name | 1257 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 6 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Puddle Weld Ind | No |
| Pipe Diameter | 8 |
| Pipe Wall Thickness | 0.322 |
| Pipe Smys | 35000 |
| Pipe Specification | Unknown |
| Pipe Seam Type | Erw - High Frequency |
| Pipe Manufacturer | Unknown |
| Pipe Coating Type | None |
| Coating Applied Ind | No |
| Installation Year | 1985 |
| Manufactured Year | 1985 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Pinhole |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 42 |
| Est Cost Prop Damage | 45000 |
| Est Cost Emergency | 135000 |
| Est Cost Environmental | 45000 |
| Est Cost Other | 0 |
| Prpty | 225042 |
| Num Persons Hosp Not Ovnght | 0 |
| Num Injured Treated By Emt | 0 |
| Num Resident Building Affctd | 0 |
| Num Business Building Affctd | 0 |
| Accident Psig | 50 |
| Mop Psig | 200 |
| Mop Cfr Section | Component Design Pressure �195.406(A)(2) View CFR 49 §192 |
| Maop Established Date | 2009-10-26 00:00:00 |
| Maop Reversal Flow Ind | No |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Lack of control center involvement. There were no indications to the operator that they could have identified a release. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | Internal Corrosion |
| Internal External | Internal Corrosion |
| Int Visual Exam Results | Localized Pitting |
| Int Other Corrosion Ind | Yes |
| Int Corrosion Type Details | Crevice Corrosion/under-Deposit Corrosion |
| Int Metallurgical Basis Ind | Yes |
| Int Low Point Pipe Loc Ind | Yes |
| Int Elbow Loc Ind | Yes |
| Corrosion Inhibitors | Yes |
| Corrosion Lining | No |
| Cleaning Dewatering | Not Applicable - Not Mainline Pipe |
| Corrosion Coupons | Not Applicable - Not Mainline Pipe |
| Collected Data Ind | No |
| Has Hydrtst Conduc Before Ind | Yes |
| Hydrtst Most Rcnt Year | 2009 |
| Hydrtst Most Rcnt Pressure | 200 |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | S**** S**** |
| Preparer Title | Sr Compliance Analyst |
| Preparer Email | S**********@e*******.com |
| Preparer Telephone | 218-206-5872 |
| Prepared Date | 2022-04-28 00:00:00 |
| Authorizer Name | S**** D***** |
| Authorizer Telephone | 715-718-1236 |
| Authorizer Title | Supervisor Us Pipeline Compliance |
| Authorizer Email | S************@e*******.com |
| Narrative | On december 1, 2021 at approximately 1:30 pm mst a release was discovered at the gurley terminal inside the tank 603 containment. The edmonton control center was notified, and line 41 was shut down and gurley terminal was isolated until the source of the release could be determined. Approximately 0.5 barrels of crude oil was released. The nrc was notified on december 1, 2021 at 2:23 pm mst (nrc# 1323357). A 48-hour update to the nrc was made on december 2, 2021 at 3:31 pm mst (nrc# 1323479). The source of the release was identified as an out of service 8" recirculation line on tank 603. The section of pipe was cut out and the line was isolated by installing blind flanges. Approximately 17.5 tons of contaminated soil was removed from the release site. After further investigation the cause of the release was determined to be due to localized internal corrosion pitting that originated from the bottom side of a mitered bend on the recirculation line. A third-party metallurgical analysis found excess weld material on the interior surface that formed a crevice with the pipe wall causing crevice corrosion. The presence of a relatively large, round pit indicated that a mound/tubercle may have been present prior to the release suggestive of under-deposit corrosion. When the line was taken out of service it could not be pigged due to the piping configuration and the cleaning method used did not adequately remove all residual product. Several action plans have been created that aim to lower the risk on the remaining gurley tank recirculation lines in service and those out of service. Another action plan is put forth to improve processes around identifying and managing hazards related to cleaning plans. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA