HL incident on 2021-08-24 — OK

Operator
Magellan Pipeline Company, Lp
Cause
Material Failure Of Pipe Or Weld
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$80,000
Incident datetime
2021-08-24 10:40
Report number
Location
OK
Narrative
At 9:10 on august 24, 2021, the iowa department of natural resources notified magellan of a sheen observed near the rock river in sioux county, iowa. Response personnel were dispatched and a leak was confirmed in the crossing. Cleanup activities were initiated. The pipeline was temporarily repaired with a type b sleeve and plans for an hdd replacement are underway. The defect will be cutout and sent in for metallurgical testing following the hdd. Update: based on the metallurgical report, the field observations, and the characteristics seen in the waterway survey information, the crack initiation likely resulted from fatigue stress imposed at the toe of the fillet weld (acting as a stress concentration point) on the sleeve, originally installed using a single welding pass using cellulose rods, due to lack of weld metal in the fillet weld. To prevent re-occurrence, a permanent pipeline replacement was completed 11/2021, and the water crossing procedure was amended to include requirements for contractors to identify and record observations of river weights in survey data and drawing deliverables. Additionally, the procedure was amended to include additional guidance to consider ili stress analysis on any surveyed crossing meeting specific criteria, which include the presence of river weights. Part j note: the final reports for the 2021 tool runs had not been received at the time of the release. Supplemental: (8/2023): parts g, h, j
Detailed record list
Report Received Date
2021-09-22 00:00:00
Iyear
2021
Report Number
20210267
Supplemental Number
38449
Report Type
Supplemental Final
Operator Id
Name
Magellan Pipeline Company, Lp
Operator Street Address
100 West 5th Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Local Datetime
2021-08-24 09:10:00
Time Zone
Central
Daylight Savings Ind
Yes
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
0.48
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Other
Accident Details
Iowa Department Of Natural Resources
Incident Identified Datetime
2021-08-24 10:40:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind
No
Shutdown Explain
The Pipeline Was Already Shut-In And Scheduled To Be Down
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Initial Responder Com Datetime
2021-08-24 15:02:00
On Site Datetime
2021-08-24 10:40:00
Confirmed Discovery Datetime
2021-08-24 10:40:00
Nrc Rpt Datetime
2021-08-24 14:36:00
Nrc Rpt Num
Additional Nrc Report Numbers
1314770
Ignite Ind
No
Upstream Action Taken
Operational Control
Upstream Oprtnl Cntrl Detail
The Pipeline Was Already Shut-In
Downstream Action Taken
Operational Control
Downstream Oprtnl Cntrl Detail
The Pipeline Was Already Shut-In
Notify Qualified Indiv Ind
Yes
Qualified Indiv Notif Datetime
2021-08-24 10:40:00
Oil Spill Removal Org Ind
Yes
Osro Activated Datetime
2021-08-24 10:40:00
Osro Arrived On Site Dt
8/24/2021 11:40
Num Pub Evacuated
0
Pipe Fac Name
Sioux City - Sioux Falls #5-12"
Segment Name
Line Id 6240
Onshore State Abbreviation
Ia
Onshore Postal Code
51023
Onshore City Name
Not Within A Municipality
Onshore County Name
Sioux
Designated Location
Milepost
Designated Name
320.17
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
18
Crossing
Yes
Water Crossing Ind
Yes
Water Type
Uncased
Water Name
Rock River
Water Depth
1
Water Subtype
Below Water, Pipe Buried Below Bottom (Not In Bored/drilled Crossing)
Crossing 100 Feet
Yes
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
12
Pipe Wall Thickness
0.25
Pipe Smys
42000
Pipe Specification
Api5l-X42
Pipe Seam Type
Flash Welded
Pipe Manufacturer
A.o. Smith
Pipe Coating Type
Coal Tar
Coating Applied Ind
Yes
Installation Year
1951
Manufactured Year
1951
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Crack
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
Yes
Surface Contam Ind
Yes
Amount Released
0.48
Rel Water Name
Rock River
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
5000
Est Cost Gas Released
66
Est Cost Prop Damage
80000
Est Cost Emergency
140000
Est Cost Environmental
0
Est Cost Other
0
Prpty
225066
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
215
Mop Psig
1186
Mop Cfr Section
Internal Design Pressure �195.406(A)(1)
Maop Established Date
2021-05-26 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The pipeline segment was already idle and shut in prior to the investigation. The controller did not cause or contribute to the release.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Design-, Construction-, Installation-, Or Fabrication-Related
Metallurgical Ind
Yes
Failure Type
Design-, Construction-, Installation-, Or Fabrication-Related
Fatigue Vibr Related
Yes
Failure Subtype
Other
Fatigue Vibr Related Other
Sleeve Installation
Additional Crack Ind
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Cir Trn Wave Mgn Flx Lkg Ind
Yes
Geometry Deformation Ind
Yes
Other Tool Tech Ind
Yes
Axial Recent Year
2011
Axial Rcnt Propul Method
Free Swimming
Axial Rcnt Attuned Detect
Metal Loss
Axial Rcnt Atnd Dtct Metal
High Resolution
Axial Previous Year
2006
Axial Prev Propul Method
Free Swimming
Axial Prev Attuned Detect
Metal Loss
Axial Prev Atnd Dtct Metal
High Resolution
Circ Wave Recent Year
2016
Circ Wv Rcnt Propul Method
Free Swimming
Circ Wv Rcnt Resolution
High Resolution
Circ Wv Previous Year
2001
Circ Wv Prev Propul Method
Free Swimming
Circ Wv Prev Resolution
Standard Resolution
Geometry Recent Year
2021
Geometry Rcnt Propul Method
Free Swimming
Geometry Rcnt Resolution
High Resolution
Geometrt Rcnt Measur Cups
Inside Ili Cups
Geometry Previous Year
2016
Geometry Prev Propul Method
Free Swimming
Geometry Prev Resolution
High Resolution
Geometrt Prev Measur Cups
Inside Ili Cups
Other Tool
Helical Mfl
Other Recent Year
2021
Other Rcnt Propul Method
Free Swimming
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
1995
Hydrtst Most Rcnt Pressure
1487
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
C******* R******
Preparer Title
Strategic Data Engineer
Preparer Email
C***************@m*********.com
Preparer Telephone
9182315764
Prepared Date
2023-08-24 00:00:00
Authorizer Name
T***** K***
Authorizer Telephone
9185747191
Authorizer Title
Supervisor Integrity Management
Authorizer Email
T**********@m*********.com
Narrative
At 9:10 on august 24, 2021, the iowa department of natural resources notified magellan of a sheen observed near the rock river in sioux county, iowa. Response personnel were dispatched and a leak was confirmed in the crossing. Cleanup activities were initiated. The pipeline was temporarily repaired with a type b sleeve and plans for an hdd replacement are underway. The defect will be cutout and sent in for metallurgical testing following the hdd. Update: based on the metallurgical report, the field observations, and the characteristics seen in the waterway survey information, the crack initiation likely resulted from fatigue stress imposed at the toe of the fillet weld (acting as a stress concentration point) on the sleeve, originally installed using a single welding pass using cellulose rods, due to lack of weld metal in the fillet weld. To prevent re-occurrence, a permanent pipeline replacement was completed 11/2021, and the water crossing procedure was amended to include requirements for contractors to identify and record observations of river weights in survey data and drawing deliverables. Additionally, the procedure was amended to include additional guidance to consider ili stress analysis on any surveyed crossing meeting specific criteria, which include the presence of river weights. Part j note: the final reports for the 2021 tool runs had not been received at the time of the release. Supplemental: (8/2023): parts g, h, j
Report Received Date 2021-09-22 00:00:00
Iyear 2021
Report Number 20210267
Supplemental Number 38449
Report Type Supplemental Final
Operator Id 22610 PHMSA Enforcement
Name Magellan Pipeline Company, Lp
Operator Street Address 100 West 5th Street
Operator City Name Tulsa
Operator State Abbreviation OK
Operator Postal Code 74103
Local Datetime 2021-08-24 09:10:00
Time Zone Central
Daylight Savings Ind Yes
Location Latitude 43.131465 Google Maps OpenStreetMap
Location Longitude -96.394205 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Gasoline (Non-Ethanol)
Unintentional Release Bbls 0.48
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Other
Accident Details Iowa Department Of Natural Resources
Incident Identified Datetime 2021-08-24 10:40:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Status When Identified Normal Operation, Includes Pauses Between Batches And During Maintenance
Shutdown Due Accident Ind No
Shutdown Explain The Pipeline Was Already Shut-In And Scheduled To Be Down
Communication State Fed Ind Yes
Party Initiated Communication Operator
Initial Responder Com Datetime 2021-08-24 15:02:00
On Site Datetime 2021-08-24 10:40:00
Confirmed Discovery Datetime 2021-08-24 10:40:00
Nrc Rpt Datetime 2021-08-24 14:36:00
Nrc Rpt Num 1314602 NRC Report How to search
Additional Nrc Report Numbers 1314770
Ignite Ind No
Upstream Action Taken Operational Control
Upstream Oprtnl Cntrl Detail The Pipeline Was Already Shut-In
Downstream Action Taken Operational Control
Downstream Oprtnl Cntrl Detail The Pipeline Was Already Shut-In
Notify Qualified Indiv Ind Yes
Qualified Indiv Notif Datetime 2021-08-24 10:40:00
Oil Spill Removal Org Ind Yes
Osro Activated Datetime 2021-08-24 10:40:00
Osro Arrived On Site Dt 8/24/2021 11:40
Num Pub Evacuated 0
Pipe Fac Name Sioux City - Sioux Falls #5-12"
Segment Name Line Id 6240
Onshore State Abbreviation Ia
Onshore Postal Code 51023
Onshore City Name Not Within A Municipality
Onshore County Name Sioux
Designated Location Milepost
Designated Name 320.17
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 18
Crossing Yes
Water Crossing Ind Yes
Water Type Uncased
Water Name Rock River
Water Depth 1
Water Subtype Below Water, Pipe Buried Below Bottom (Not In Bored/drilled Crossing)
Crossing 100 Feet Yes
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Body
Puddle Weld Ind No
Pipe Diameter 12
Pipe Wall Thickness 0.25
Pipe Smys 42000
Pipe Specification Api5l-X42
Pipe Seam Type Flash Welded
Pipe Manufacturer A.o. Smith
Pipe Coating Type Coal Tar
Coating Applied Ind Yes
Installation Year 1951
Manufactured Year 1951
Material Involved Carbon Steel
Release Type Leak
Leak Type Crack
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind Yes
Surface Contam Ind Yes
Amount Released 0.48
Rel Water Name Rock River
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 5000
Est Cost Gas Released 66
Est Cost Prop Damage 80000
Est Cost Emergency 140000
Est Cost Environmental 0
Est Cost Other 0
Prpty 225066
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 215
Mop Psig 1186
Mop Cfr Section Internal Design Pressure �195.406(A)(1) View CFR 49 §192
Maop Established Date 2021-05-26 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details The pipeline segment was already idle and shut in prior to the investigation. The controller did not cause or contribute to the release.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Material Failure Of Pipe Or Weld
Cause Details Design-, Construction-, Installation-, Or Fabrication-Related
Metallurgical Ind Yes
Failure Type Design-, Construction-, Installation-, Or Fabrication-Related
Fatigue Vibr Related Yes
Failure Subtype Other
Fatigue Vibr Related Other Sleeve Installation
Additional Crack Ind Yes
Collected Data Ind Yes
Axial Magnetic Flx Lkg Ind Yes
Cir Trn Wave Mgn Flx Lkg Ind Yes
Geometry Deformation Ind Yes
Other Tool Tech Ind Yes
Axial Recent Year 2011
Axial Rcnt Propul Method Free Swimming
Axial Rcnt Attuned Detect Metal Loss
Axial Rcnt Atnd Dtct Metal High Resolution
Axial Previous Year 2006
Axial Prev Propul Method Free Swimming
Axial Prev Attuned Detect Metal Loss
Axial Prev Atnd Dtct Metal High Resolution
Circ Wave Recent Year 2016
Circ Wv Rcnt Propul Method Free Swimming
Circ Wv Rcnt Resolution High Resolution
Circ Wv Previous Year 2001
Circ Wv Prev Propul Method Free Swimming
Circ Wv Prev Resolution Standard Resolution
Geometry Recent Year 2021
Geometry Rcnt Propul Method Free Swimming
Geometry Rcnt Resolution High Resolution
Geometrt Rcnt Measur Cups Inside Ili Cups
Geometry Previous Year 2016
Geometry Prev Propul Method Free Swimming
Geometry Prev Resolution High Resolution
Geometrt Prev Measur Cups Inside Ili Cups
Other Tool Helical Mfl
Other Recent Year 2021
Other Rcnt Propul Method Free Swimming
Has Hydrtst Conduc Before Ind Yes
Hydrtst Most Rcnt Year 1995
Hydrtst Most Rcnt Pressure 1487
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name C******* R******
Preparer Title Strategic Data Engineer
Preparer Email C***************@m*********.com
Preparer Telephone 9182315764
Prepared Date 2023-08-24 00:00:00
Authorizer Name T***** K***
Authorizer Telephone 9185747191
Authorizer Title Supervisor Integrity Management
Authorizer Email T**********@m*********.com
Narrative At 9:10 on august 24, 2021, the iowa department of natural resources notified magellan of a sheen observed near the rock river in sioux county, iowa. Response personnel were dispatched and a leak was confirmed in the crossing. Cleanup activities were initiated. The pipeline was temporarily repaired with a type b sleeve and plans for an hdd replacement are underway. The defect will be cutout and sent in for metallurgical testing following the hdd. Update: based on the metallurgical report, the field observations, and the characteristics seen in the waterway survey information, the crack initiation likely resulted from fatigue stress imposed at the toe of the fillet weld (acting as a stress concentration point) on the sleeve, originally installed using a single welding pass using cellulose rods, due to lack of weld metal in the fillet weld. To prevent re-occurrence, a permanent pipeline replacement was completed 11/2021, and the water crossing procedure was amended to include requirements for contractors to identify and record observations of river weights in survey data and drawing deliverables. Additionally, the procedure was amended to include additional guidance to consider ili stress analysis on any surveyed crossing meeting specific criteria, which include the presence of river weights. Part j note: the final reports for the 2021 tool runs had not been received at the time of the release. Supplemental: (8/2023): parts g, h, j