HL incident on 2021-05-04 — KS

Operator
Flint Hills Resources, Lc
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$52,369
Incident datetime
2021-05-04 09:23
Report number
Location
KS
Narrative
Updated section a, section b, section d and section g to include results of initial immediate cause analysis. An fhr employee observed discolored vegetation on the rosanky to nixon segment at approximately 09:23 on may 4, 2021. The employee was performing a ground patrol in response to a pressure anomaly, the sequence of which is described below. Fhr shut the line down, including the rosanky to nixon segment, on april 21, 2021 as a scheduled shutdown. A leak alarm was received on april 22, 2021 at which point fhr initiated review and mobilized field employees. It was determined that the first pressure loss occurred on april 21, 2021 at 20:38, approximately 2 hours following the scheduled shutdown. When the alarm was received, fhr's leak detection team initiated a review of relevant data. April 22, 2021: operations mobilized to verify station integrity, select river crossings and above ground appurtenances; there were no indications of a release. April 22, 2021: operations initiated aerial patrols (two passes) of the line; there were no indications of a release. April 22 -24, 2021: operations initiated a ground patrol along the pipeline segments, also verifying station integrity and observing water crossings; there were no indications of a release. April 24, 2021: operations initiated additional aerial patrols (two passes) following a rain event; there were no indications of a release. April 25, 2021: fhr performed controlled pressure checks on the line segments. The pressure check narrowed the potential release location to the approximately 20-mile rosanky to nixon segment. April 27 - 28, 2021: operations contracted a company with canines capable of below ground oil detection. The line was patrolled with the canines; there were no indications of a release. April 29 - 30, 2021: nitrogen and tracer gas were procured and mobilized, and asset modifications were completed to render the line capable of a purge and tracer gas study. May 1 -2, 2021: operations initiated a drone patrol. The drone was equipped with forward looking infrared (flir), and the patrol also included a visual inspection; there were no indications of a release. May 3 - 4, 2021: operations completed a line purge, filled the line with a nitrogen and tracer gas mixture, and deployed detection equipment to traverse the row via ground patrol. During the tracer detection walkdown and resulting ground patrol, operations discovered the above referenced visual indication of a release on may 4, 2021, confirming the release. Fhr began excavation on the afternoon of may 4, 2021. A pinhole was discovered at the approximate 6 o'clock position on the pipeline. A clamp was installed at approximately 17:30 on may 4, 2021. On may 5, 2021, the segment of pipe was removed and replaced. The removed pipe was sent to a third party for metallurgical analysis. Notification was made to the nrc at approximately 10:05 on may 4, 2021. Based on available information, the initial release was reported as less than 600 barrels. Subsequent review of available data has reduced the estimated release volume to 60 barrels, pending the results of further investigation. The updated estimate was reported to the nrc on may 6, 2021 at 10:03 as part of the 48-hour follow up.
Detailed record list
Report Received Date
2021-06-03 00:00:00
Iyear
2021
Report Number
20210165
Supplemental Number
36636
Report Type
Supplemental Final
Operator Id
Name
Flint Hills Resources, Lc
Operator Street Address
4111 East 37th Street North
Operator City Name
Wichita
Operator State Abbreviation
KS
Operator Postal Code
67220
Local Datetime
2021-04-21 20:38:00
Time Zone
Central
Daylight Savings Ind
No
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
60
Recovered Bbls
3
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2021-05-04 09:23:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Status When Identified
Routine Shutdown
Communication State Fed Ind
Yes
Party Initiated Communication
Operator
Initial Responder Com Datetime
2021-04-26 12:10:00
On Site Datetime
2021-05-04 09:23:00
Confirmed Discovery Datetime
2021-05-04 09:23:00
Nrc Rpt Datetime
2021-05-04 10:04:00
Nrc Rpt Num
Additional Nrc Report Numbers
1304412
Ignite Ind
No
Upstream Action Taken
Valve Closure
Upstream Valve Close Datetime
2021-04-21 18:46:00
Upstream Valve Type Ind
Automatic
Downstream Action Taken
Valve Closure
Downstream Vlv Close Datetime
2021-04-21 18:47:00
Downstream Valve Type Ind
Automatic
Notify Qualified Indiv Ind
Yes
Qualified Indiv Notif Datetime
2021-05-04 09:37:00
Oil Spill Removal Org Ind
Yes
Osro Activated Datetime
2021-05-04 10:11:00
Osro Arrived On Site Dt
5/4/2021 12:45
Num Pub Evacuated
0
Pipe Fac Name
Rosanky To Nixon 8"
Segment Name
60601050
Onshore State Abbreviation
Tx
Onshore Postal Code
78140
Onshore City Name
Near Nixon, Texas
Onshore County Name
Gonzales
Designated Location
Milepost
Designated Name
Mp 2
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
42
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Puddle Weld Ind
No
Pipe Diameter
8.63
Pipe Wall Thickness
0.188
Pipe Smys
52000
Pipe Specification
Api 5l
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Unknown
Pipe Coating Type
Other
Pipe Coating Details
Polyken Tape
Coating Applied Ind
Unknown
Installation Year
1982
Manufactured Year
1980
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Groundwater Remed Ind
Yes
Water Contam Ind
Yes
Groundwater Contam Ind
Yes
Amount Released
1
Rel Water Name
Not Applicable
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
55010
Est Cost Gas Released
3704
Est Cost Prop Damage
52369
Est Cost Emergency
170625
Est Cost Environmental
14978
Est Cost Other
0
Prpty
296686
Num Persons Hosp Not Ovnght
0
Num Injured Treated By Emt
0
Num Resident Building Affctd
0
Num Business Building Affctd
0
Accident Psig
360
Mop Psig
1440
Mop Cfr Section
Component Design Pressure �195.406(A)(2)
Maop Established Date
2015-02-25 00:00:00
Maop Reversal Flow Ind
No
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
95000
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
Yes
Cpm Conf Ind
Yes
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Microbiological Ind
Yes
Int Field Exam Basis Ind
Yes
Int Metallurgical Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
Yes
Corrosion Lining
No
Cleaning Dewatering
Yes
Corrosion Coupons
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Ultrasonic Ind
Yes
Geometry Deformation Ind
Yes
Axial Recent Year
2020
Axial Rcnt Propul Method
Free Swimming
Axial Rcnt Attuned Detect
Metal Loss
Axial Rcnt Atnd Dtct Metal
High Resolution
Axial Previous Year
2019
Axial Prev Propul Method
Free Swimming
Axial Prev Attuned Detect
Metal Loss
Axial Prev Atnd Dtct Metal
High Resolution
Ultrasonic Recent Year
2015
Ultrasonic Rcnt Propul Method
Free Swimming
Ultrasonic Rcnt Attuned
Crack
Geometry Recent Year
2020
Geometry Rcnt Propul Method
Free Swimming
Geometry Rcnt Resolution
High Resolution
Geometrt Rcnt Measur Cups
No Cups
Geometry Previous Year
2019
Geometry Prev Propul Method
Free Swimming
Geometry Prev Resolution
High Resolution
Geometrt Prev Measur Cups
No Cups
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2015
Hydrtst Most Rcnt Pressure
2063
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Intrnl Cor Microbiologic Ind
Yes
Preparer Name
M**** T*****
Preparer Title
Senior Compliance Specialist
Preparer Email
M***********@f**.com
Preparer Telephone
409-273-9482
Prepared Date
2022-05-04 00:00:00
Local Contact Name
M**** T*****
Local Contact Email
M***********@f**.com
Local Contact Telephone
409-273-9482
Authorizer Name
M**** T*****
Authorizer Telephone
409-273-9482
Authorizer Title
Senior Compliance Specialist
Authorizer Email
M***********@f**.com
Narrative
Updated section a, section b, section d and section g to include results of initial immediate cause analysis. An fhr employee observed discolored vegetation on the rosanky to nixon segment at approximately 09:23 on may 4, 2021. The employee was performing a ground patrol in response to a pressure anomaly, the sequence of which is described below. Fhr shut the line down, including the rosanky to nixon segment, on april 21, 2021 as a scheduled shutdown. A leak alarm was received on april 22, 2021 at which point fhr initiated review and mobilized field employees. It was determined that the first pressure loss occurred on april 21, 2021 at 20:38, approximately 2 hours following the scheduled shutdown. When the alarm was received, fhr's leak detection team initiated a review of relevant data. April 22, 2021: operations mobilized to verify station integrity, select river crossings and above ground appurtenances; there were no indications of a release. April 22, 2021: operations initiated aerial patrols (two passes) of the line; there were no indications of a release. April 22 -24, 2021: operations initiated a ground patrol along the pipeline segments, also verifying station integrity and observing water crossings; there were no indications of a release. April 24, 2021: operations initiated additional aerial patrols (two passes) following a rain event; there were no indications of a release. April 25, 2021: fhr performed controlled pressure checks on the line segments. The pressure check narrowed the potential release location to the approximately 20-mile rosanky to nixon segment. April 27 - 28, 2021: operations contracted a company with canines capable of below ground oil detection. The line was patrolled with the canines; there were no indications of a release. April 29 - 30, 2021: nitrogen and tracer gas were procured and mobilized, and asset modifications were completed to render the line capable of a purge and tracer gas study. May 1 -2, 2021: operations initiated a drone patrol. The drone was equipped with forward looking infrared (flir), and the patrol also included a visual inspection; there were no indications of a release. May 3 - 4, 2021: operations completed a line purge, filled the line with a nitrogen and tracer gas mixture, and deployed detection equipment to traverse the row via ground patrol. During the tracer detection walkdown and resulting ground patrol, operations discovered the above referenced visual indication of a release on may 4, 2021, confirming the release. Fhr began excavation on the afternoon of may 4, 2021. A pinhole was discovered at the approximate 6 o'clock position on the pipeline. A clamp was installed at approximately 17:30 on may 4, 2021. On may 5, 2021, the segment of pipe was removed and replaced. The removed pipe was sent to a third party for metallurgical analysis. Notification was made to the nrc at approximately 10:05 on may 4, 2021. Based on available information, the initial release was reported as less than 600 barrels. Subsequent review of available data has reduced the estimated release volume to 60 barrels, pending the results of further investigation. The updated estimate was reported to the nrc on may 6, 2021 at 10:03 as part of the 48-hour follow up.
Report Received Date 2021-06-03 00:00:00
Iyear 2021
Report Number 20210165
Supplemental Number 36636
Report Type Supplemental Final
Operator Id 22855 PHMSA Enforcement
Name Flint Hills Resources, Lc
Operator Street Address 4111 East 37th Street North
Operator City Name Wichita
Operator State Abbreviation KS
Operator Postal Code 67220
Local Datetime 2021-04-21 20:38:00
Time Zone Central
Daylight Savings Ind No
Location Latitude 29.280951 Google Maps OpenStreetMap
Location Longitude -97.778427 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 60
Recovered Bbls 3
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2021-05-04 09:23:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Status When Identified Routine Shutdown
Communication State Fed Ind Yes
Party Initiated Communication Operator
Initial Responder Com Datetime 2021-04-26 12:10:00
On Site Datetime 2021-05-04 09:23:00
Confirmed Discovery Datetime 2021-05-04 09:23:00
Nrc Rpt Datetime 2021-05-04 10:04:00
Nrc Rpt Num 1304198 NRC Report How to search
Additional Nrc Report Numbers 1304412
Ignite Ind No
Upstream Action Taken Valve Closure
Upstream Valve Close Datetime 2021-04-21 18:46:00
Upstream Valve Type Ind Automatic
Downstream Action Taken Valve Closure
Downstream Vlv Close Datetime 2021-04-21 18:47:00
Downstream Valve Type Ind Automatic
Notify Qualified Indiv Ind Yes
Qualified Indiv Notif Datetime 2021-05-04 09:37:00
Oil Spill Removal Org Ind Yes
Osro Activated Datetime 2021-05-04 10:11:00
Osro Arrived On Site Dt 5/4/2021 12:45
Num Pub Evacuated 0
Pipe Fac Name Rosanky To Nixon 8"
Segment Name 60601050
Onshore State Abbreviation Tx
Onshore Postal Code 78140
Onshore City Name Near Nixon, Texas
Onshore County Name Gonzales
Designated Location Milepost
Designated Name Mp 2
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 42
Crossing No
Pipe Facility Type Intrastate
Item Involved Pipe
Pipe Type Pipe Body
Puddle Weld Ind No
Pipe Diameter 8.63
Pipe Wall Thickness 0.188
Pipe Smys 52000
Pipe Specification Api 5l
Pipe Seam Type Erw - High Frequency
Pipe Manufacturer Unknown
Pipe Coating Type Other
Pipe Coating Details Polyken Tape
Coating Applied Ind Unknown
Installation Year 1982
Manufactured Year 1980
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Groundwater Remed Ind Yes
Water Contam Ind Yes
Groundwater Contam Ind Yes
Amount Released 1
Rel Water Name Not Applicable
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 55010
Est Cost Gas Released 3704
Est Cost Prop Damage 52369
Est Cost Emergency 170625
Est Cost Environmental 14978
Est Cost Other 0
Prpty 296686
Num Persons Hosp Not Ovnght 0
Num Injured Treated By Emt 0
Num Resident Building Affctd 0
Num Business Building Affctd 0
Accident Psig 360
Mop Psig 1440
Mop Cfr Section Component Design Pressure �195.406(A)(2) View CFR 49 §192
Maop Established Date 2015-02-25 00:00:00
Maop Reversal Flow Ind No
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 95000
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind Yes
Cpm Conf Ind Yes
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details Internal Corrosion
Internal External Internal Corrosion
Int Visual Exam Results Localized Pitting
Int Microbiological Ind Yes
Int Field Exam Basis Ind Yes
Int Metallurgical Basis Ind Yes
Int Low Point Pipe Loc Ind Yes
Corrosion Inhibitors Yes
Corrosion Lining No
Cleaning Dewatering Yes
Corrosion Coupons Yes
Collected Data Ind Yes
Axial Magnetic Flx Lkg Ind Yes
Ultrasonic Ind Yes
Geometry Deformation Ind Yes
Axial Recent Year 2020
Axial Rcnt Propul Method Free Swimming
Axial Rcnt Attuned Detect Metal Loss
Axial Rcnt Atnd Dtct Metal High Resolution
Axial Previous Year 2019
Axial Prev Propul Method Free Swimming
Axial Prev Attuned Detect Metal Loss
Axial Prev Atnd Dtct Metal High Resolution
Ultrasonic Recent Year 2015
Ultrasonic Rcnt Propul Method Free Swimming
Ultrasonic Rcnt Attuned Crack
Geometry Recent Year 2020
Geometry Rcnt Propul Method Free Swimming
Geometry Rcnt Resolution High Resolution
Geometrt Rcnt Measur Cups No Cups
Geometry Previous Year 2019
Geometry Prev Propul Method Free Swimming
Geometry Prev Resolution High Resolution
Geometrt Prev Measur Cups No Cups
Has Hydrtst Conduc Before Ind Yes
Hydrtst Most Rcnt Year 2015
Hydrtst Most Rcnt Pressure 2063
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Intrnl Cor Microbiologic Ind Yes
Preparer Name M**** T*****
Preparer Title Senior Compliance Specialist
Preparer Email M***********@f**.com
Preparer Telephone 409-273-9482
Prepared Date 2022-05-04 00:00:00
Local Contact Name M**** T*****
Local Contact Email M***********@f**.com
Local Contact Telephone 409-273-9482
Authorizer Name M**** T*****
Authorizer Telephone 409-273-9482
Authorizer Title Senior Compliance Specialist
Authorizer Email M***********@f**.com
Narrative Updated section a, section b, section d and section g to include results of initial immediate cause analysis. An fhr employee observed discolored vegetation on the rosanky to nixon segment at approximately 09:23 on may 4, 2021. The employee was performing a ground patrol in response to a pressure anomaly, the sequence of which is described below. Fhr shut the line down, including the rosanky to nixon segment, on april 21, 2021 as a scheduled shutdown. A leak alarm was received on april 22, 2021 at which point fhr initiated review and mobilized field employees. It was determined that the first pressure loss occurred on april 21, 2021 at 20:38, approximately 2 hours following the scheduled shutdown. When the alarm was received, fhr's leak detection team initiated a review of relevant data. April 22, 2021: operations mobilized to verify station integrity, select river crossings and above ground appurtenances; there were no indications of a release. April 22, 2021: operations initiated aerial patrols (two passes) of the line; there were no indications of a release. April 22 -24, 2021: operations initiated a ground patrol along the pipeline segments, also verifying station integrity and observing water crossings; there were no indications of a release. April 24, 2021: operations initiated additional aerial patrols (two passes) following a rain event; there were no indications of a release. April 25, 2021: fhr performed controlled pressure checks on the line segments. The pressure check narrowed the potential release location to the approximately 20-mile rosanky to nixon segment. April 27 - 28, 2021: operations contracted a company with canines capable of below ground oil detection. The line was patrolled with the canines; there were no indications of a release. April 29 - 30, 2021: nitrogen and tracer gas were procured and mobilized, and asset modifications were completed to render the line capable of a purge and tracer gas study. May 1 -2, 2021: operations initiated a drone patrol. The drone was equipped with forward looking infrared (flir), and the patrol also included a visual inspection; there were no indications of a release. May 3 - 4, 2021: operations completed a line purge, filled the line with a nitrogen and tracer gas mixture, and deployed detection equipment to traverse the row via ground patrol. During the tracer detection walkdown and resulting ground patrol, operations discovered the above referenced visual indication of a release on may 4, 2021, confirming the release. Fhr began excavation on the afternoon of may 4, 2021. A pinhole was discovered at the approximate 6 o'clock position on the pipeline. A clamp was installed at approximately 17:30 on may 4, 2021. On may 5, 2021, the segment of pipe was removed and replaced. The removed pipe was sent to a third party for metallurgical analysis. Notification was made to the nrc at approximately 10:05 on may 4, 2021. Based on available information, the initial release was reported as less than 600 barrels. Subsequent review of available data has reduced the estimated release volume to 60 barrels, pending the results of further investigation. The updated estimate was reported to the nrc on may 6, 2021 at 10:03 as part of the 48-hour follow up.

All rights reserved. Copyright © by ClearPHMSA