HL incident on 2021-04-22 — OK

Operator
Magellan Pipeline Company, Lp
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$20,000
Incident datetime
2021-04-22 09:15
Report number
Location
OK
Narrative
At 9:15 on april 22, 2021, magellan operations personnel were conducting a daily facility inspection when product was discovered coming from a cracked expansion joint on tank 3501 piping. The segment was isolated and cleanup activities were initiated. It was found that the pipe supports were not adequately buried to frost depth and had experienced frost heave, putting the expansion joint in a bind. Prior to returning the tank line to service, a new spool piece will replace the expansion joint and new supports will be installed.
Detailed record list
Report Received Date
2021-05-21 00:00:00
Iyear
2021
Report Number
20210156
Supplemental Number
35317
Report Type
Original Final
Operator Id
Name
Magellan Pipeline Company, Lp
Operator Street Address
100 West 5th Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Local Datetime
2021-04-22 09:15:00
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
5
Recovered Bbls
5
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2021-04-22 09:15:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Tank And Line Were Isolated
On Site Datetime
2021-04-22 09:15:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
West Tulsa Terminal
Segment Name
Fac Id 295
Onshore State Abbreviation
Ok
Onshore Postal Code
74107
Onshore City Name
Tulsa
Onshore County Name
Tulsa
Designated Location
Milepost/valve Station
Designated Name
0
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Other
Item Involved Details
Stainless Steel Expansion Joints
Installation Year
2020
Material Involved
Material Other Than Carbon Steel
Material Details
321 S/s With Carbon Steel #150 Flanges
Release Type
Leak
Leak Type
Crack
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
300
Est Cost Prop Damage
20000
Est Cost Emergency
25000
Est Cost Environmental
0
Est Cost Other
0
Prpty
45300
Accident Psig
50
Mop Psig
175
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
No
Cpm In Place Ind
No
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Other Equipment Failure
Eq Failure Type
Other Equipment Failure
Failure Details
Body Of Expansion Joint
Eq Additional Other Ind
Yes
Eq Additional Other Details
Pipe Stress
Preparer Name
S****** L******
Preparer Title
Ai Analyst
Preparer Email
S**************@m*********.com
Preparer Telephone
918-574-7327
Preparer Fax
918-574-7376
Prepared Date
2021-05-21 00:00:00
Authorizer Name
G**** R****
Authorizer Telephone
918-574-7165
Authorizer Title
Supervisor Integrity Management
Authorizer Email
G**********@m*********.com
Narrative
At 9:15 on april 22, 2021, magellan operations personnel were conducting a daily facility inspection when product was discovered coming from a cracked expansion joint on tank 3501 piping. The segment was isolated and cleanup activities were initiated. It was found that the pipe supports were not adequately buried to frost depth and had experienced frost heave, putting the expansion joint in a bind. Prior to returning the tank line to service, a new spool piece will replace the expansion joint and new supports will be installed.
Report Received Date 2021-05-21 00:00:00
Iyear 2021
Report Number 20210156
Supplemental Number 35317
Report Type Original Final
Operator Id 22610 PHMSA Enforcement
Name Magellan Pipeline Company, Lp
Operator Street Address 100 West 5th Street
Operator City Name Tulsa
Operator State Abbreviation OK
Operator Postal Code 74103
Local Datetime 2021-04-22 09:15:00
Location Latitude 36.130839 Google Maps OpenStreetMap
Location Longitude -96.024393 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls 5
Recovered Bbls 5
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2021-04-22 09:15:00
System Part Involved Onshore Terminal/tank Farm Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain Tank And Line Were Isolated
On Site Datetime 2021-04-22 09:15:00
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name West Tulsa Terminal
Segment Name Fac Id 295
Onshore State Abbreviation Ok
Onshore Postal Code 74107
Onshore City Name Tulsa
Onshore County Name Tulsa
Designated Location Milepost/valve Station
Designated Name 0
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Interstate
Item Involved Other
Item Involved Details Stainless Steel Expansion Joints
Installation Year 2020
Material Involved Material Other Than Carbon Steel
Material Details 321 S/s With Carbon Steel #150 Flanges
Release Type Leak
Leak Type Crack
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
High Pop Ind Yes
High Pop Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 300
Est Cost Prop Damage 20000
Est Cost Emergency 25000
Est Cost Environmental 0
Est Cost Other 0
Prpty 45300
Accident Psig 50
Mop Psig 175
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind No
Cpm In Place Ind No
Investigation Status No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Other Equipment Failure
Eq Failure Type Other Equipment Failure
Failure Details Body Of Expansion Joint
Eq Additional Other Ind Yes
Eq Additional Other Details Pipe Stress
Preparer Name S****** L******
Preparer Title Ai Analyst
Preparer Email S**************@m*********.com
Preparer Telephone 918-574-7327
Preparer Fax 918-574-7376
Prepared Date 2021-05-21 00:00:00
Authorizer Name G**** R****
Authorizer Telephone 918-574-7165
Authorizer Title Supervisor Integrity Management
Authorizer Email G**********@m*********.com
Narrative At 9:15 on april 22, 2021, magellan operations personnel were conducting a daily facility inspection when product was discovered coming from a cracked expansion joint on tank 3501 piping. The segment was isolated and cleanup activities were initiated. It was found that the pipe supports were not adequately buried to frost depth and had experienced frost heave, putting the expansion joint in a bind. Prior to returning the tank line to service, a new spool piece will replace the expansion joint and new supports will be installed.

All rights reserved. Copyright © by ClearPHMSA