Narrative
On 4/5/2021 the operator performed a cleaning pig run using a scraper pig. Valve ic1 was closed and ic2 and ic3 were open. Once the scrapper pig was received the receiver was isolated. Valve ic1 (bypass valve) open and ic2 and ic3 closed. The 1/2' bleeder valve (not in diagram) was opened to relieve any pressure in the receiver. The 2' drain valve was open to drain liquid from the receiver. The receiver door was opened and the scrapper pig was removed. Once the scrapper pig was removed the receiver door was closed and the 2' drain valve closed. The 1/2 bleeder valve was not closed. On 4/6/2021 the operator performed a cleaning pig run using a foam pig. The operator arrived at the receiver location at 5:00am. The operator closed ic1 and opened ic2 and ic3. The operator did not realize the 1/2' bleeder valve was still open. The operator left the receiver location and began shipping at around 5:30am. At around 8:00am the operator was contacted by spr field personnel that the receiver was leaking oil from the 1/2' bleeder valve, the spr field personnel shut the bleeder valve . The operator immediately went back to the receiver location and confirmed closure of the 1/2' bleeder valve. At around 8:10am the operator notified his supervisor to initiate the response.
Detailed record list
Report Received Date
2021-05-04 00:00:00
Iyear
2021
Report Number
20210140
Supplemental Number
35507
Report Type
Supplemental
Operator Id
Name
E&b Natural Resources Management Corp
Operator Street Address
1608 Norris Rd
Operator City Name
Bakersfield
Operator State Abbreviation
CA
Operator Postal Code
93308
Local Datetime
2021-04-06 08:10:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
18
Recovered Bbls
18
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2021-04-06 08:00:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
The 1/2 Inch Bleeder Valve Was Closed, This Was The Source Of The Leak.
On Site Datetime
2021-04-06 09:00:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Inglewood Oil Field Receiver
Segment Name
0876
Onshore State Abbreviation
Ca
Onshore Postal Code
90008
Onshore City Name
Not Within A Municipality
Onshore County Name
Los Angeles County
Designated Location
Survey Station No.
Designated Name
Inglewood
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Valve
Valve Type
Auxiliary Or Other Valve
Installation Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Other
Leak Type Other
1/2" Bleeder Valve Left Open
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
140
Est Cost Prop Damage
0
Est Cost Emergency
6500
Est Cost Environmental
0
Est Cost Other
0
Prpty
6640
Accident Psig
65
Mop Psig
334
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
=< 20% Smys Regulated Gathering
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
No
Num Employees Tested
1
Num Employees Failed
0
Cause
Incorrect Operation
Cause Details
Valve Left Or Placed In Wrong Position, But Not Resulting In A Tank, Vessel, Or Sump/separator Overflow Or Facility Overpressure
Operation Type
Valve Left Or Placed In Wrong Position, But Not Resulting In A Tank, Vessel, Or Sump/separator Overflow Or Facility Overpressure
Related Inadequate Proc Ind
Yes
Category Type
Routine Maintenance
Operator Qualification Ind
Yes
Qualified Individuals
Yes, They Were Qualified For The Task(S)
Preparer Name
M****** J F****
Preparer Title
Pipeline Advisor
Preparer Email
M*****@e***************.com
Preparer Telephone
16618094956
Prepared Date
2021-07-15 00:00:00
Authorizer Name
L**** Z******
Authorizer Telephone
7143259502
Authorizer Title
Vp Los Angeles Basin
Authorizer Email
L*******@e**********.com
Narrative
On 4/5/2021 the operator performed a cleaning pig run using a scraper pig. Valve ic1 was closed and ic2 and ic3 were open. Once the scrapper pig was received the receiver was isolated. Valve ic1 (bypass valve) open and ic2 and ic3 closed. The 1/2' bleeder valve (not in diagram) was opened to relieve any pressure in the receiver. The 2' drain valve was open to drain liquid from the receiver. The receiver door was opened and the scrapper pig was removed. Once the scrapper pig was removed the receiver door was closed and the 2' drain valve closed. The 1/2 bleeder valve was not closed. On 4/6/2021 the operator performed a cleaning pig run using a foam pig. The operator arrived at the receiver location at 5:00am. The operator closed ic1 and opened ic2 and ic3. The operator did not realize the 1/2' bleeder valve was still open. The operator left the receiver location and began shipping at around 5:30am. At around 8:00am the operator was contacted by spr field personnel that the receiver was leaking oil from the 1/2' bleeder valve, the spr field personnel shut the bleeder valve . The operator immediately went back to the receiver location and confirmed closure of the 1/2' bleeder valve. At around 8:10am the operator notified his supervisor to initiate the response.
Report Received Date 2021-05-04 00:00:00
Iyear 2021
Report Number 20210140
Supplemental Number 35507
Report Type Supplemental
Operator Id 31075 PHMSA Enforcement
Name E&b Natural Resources Management Corp
Operator Street Address 1608 Norris Rd
Operator City Name Bakersfield
Operator State Abbreviation CA
Operator Postal Code 93308
Local Datetime 2021-04-06 08:10:00
Location Latitude 34.00564 Google Maps OpenStreetMap
Location Longitude -118.3705 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 18
Recovered Bbls 18
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Contractor Working For The Operator
Incident Identified Datetime 2021-04-06 08:00:00
System Part Involved Onshore Terminal/tank Farm Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain The 1/2 Inch Bleeder Valve Was Closed, This Was The Source Of The Leak.
On Site Datetime 2021-04-06 09:00:00
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Inglewood Oil Field Receiver
Segment Name 0876
Onshore State Abbreviation Ca
Onshore Postal Code 90008
Onshore City Name Not Within A Municipality
Onshore County Name Los Angeles County
Designated Location Survey Station No.
Designated Name Inglewood
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Intrastate
Item Involved Valve
Valve Type Auxiliary Or Other Valve
Installation Year Unknown
Material Involved Carbon Steel
Release Type Leak
Leak Type Other
Leak Type Other 1/2" Bleeder Valve Left Open
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
High Pop Ind Yes
High Pop Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 140
Est Cost Prop Damage 0
Est Cost Emergency 6500
Est Cost Environmental 0
Est Cost Other 0
Prpty 6640
Accident Psig 65
Mop Psig 334
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function =< 20% Smys Regulated Gathering
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind Yes
Contractor Drug Test Ind No
Num Employees Tested 1
Num Employees Failed 0
Cause Incorrect Operation
Cause Details Valve Left Or Placed In Wrong Position, But Not Resulting In A Tank, Vessel, Or Sump/separator Overflow Or Facility Overpressure
Operation Type Valve Left Or Placed In Wrong Position, But Not Resulting In A Tank, Vessel, Or Sump/separator Overflow Or Facility Overpressure
Related Inadequate Proc Ind Yes
Category Type Routine Maintenance
Operator Qualification Ind Yes
Qualified Individuals Yes, They Were Qualified For The Task(S)
Preparer Name M****** J F****
Preparer Title Pipeline Advisor
Preparer Email M*****@e***************.com
Preparer Telephone 16618094956
Prepared Date 2021-07-15 00:00:00
Authorizer Name L**** Z******
Authorizer Telephone 7143259502
Authorizer Title Vp Los Angeles Basin
Authorizer Email L*******@e**********.com
Narrative On 4/5/2021 the operator performed a cleaning pig run using a scraper pig. Valve ic1 was closed and ic2 and ic3 were open. Once the scrapper pig was received the receiver was isolated. Valve ic1 (bypass valve) open and ic2 and ic3 closed. The 1/2' bleeder valve (not in diagram) was opened to relieve any pressure in the receiver. The 2' drain valve was open to drain liquid from the receiver. The receiver door was opened and the scrapper pig was removed. Once the scrapper pig was removed the receiver door was closed and the 2' drain valve closed. The 1/2 bleeder valve was not closed. On 4/6/2021 the operator performed a cleaning pig run using a foam pig. The operator arrived at the receiver location at 5:00am. The operator closed ic1 and opened ic2 and ic3. The operator did not realize the 1/2' bleeder valve was still open. The operator left the receiver location and began shipping at around 5:30am. At around 8:00am the operator was contacted by spr field personnel that the receiver was leaking oil from the 1/2' bleeder valve, the spr field personnel shut the bleeder valve . The operator immediately went back to the receiver location and confirmed closure of the 1/2' bleeder valve. At around 8:10am the operator notified his supervisor to initiate the response.