HL incident on 2020-09-03 — TX

Operator
Dcp Midstream
Cause
Material Failure Of Pipe Or Weld
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$20,000
Incident datetime
2020-09-03 15:36
Report number
Location
TX
Narrative
On september 3rd, 2020 a small pin hole leak was discovered on southern hills pipeline after dig number sohi.S6.015952.T19.D20.N.P3 was excavated for examination. Leak site location was between mlv 39 and mlv 40 on the southern hills system. Leak site was only detectable with a 4-gas detector within one inch from the small pin hole. Excavation crew exited ditch and made notification to ops and integrity groups immediately. Dig site was caution taped off and continuously monitored for any increased vapors and none was found. A plidco 18 inch x 18 inch clamp was installed as temporary repair until a custom plidco sleeve 18 inch x 36 inch is onsite for the permanent repair. The custom clamp was ordered and will be on site mid-november and at that time will be installed per manufacture's recommendation for a permanent repair.
Detailed record list
Report Received Date
2020-10-03 00:00:00
Iyear
2020
Report Number
20200271
Supplemental Number
34365
Report Type
Supplemental Final
Operator Id
Name
Dcp Midstream
Operator Street Address
2331 Citywest Blvd. Hq-08-S812-02
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77042
Local Datetime
2020-09-03 23:26:00
Location Latitude
Location Longitude
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid)
Unintentional Release Bbls
4.9
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2020-09-03 15:36:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Smaller Than Pinhole Leak
On Site Datetime
2020-09-03 15:36:00
Nrc Rpt Datetime
2020-09-04 00:05:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Southern Hills Ngl Pipeline
Segment Name
Soh-1
Onshore State Abbreviation
Tx
Onshore Postal Code
76487
Onshore City Name
Not Within A Municipality
Onshore County Name
Parker
Designated Location
Milepost/valve Station
Designated Name
Mlv-39
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Depth Of Cover
48
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Weld, Including Heat-Affected Zone
Weld Subtype
Other
Weld Details
Erw
Installation Year
1956
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
16
Est Cost Prop Damage
20000
Est Cost Emergency
5000
Est Cost Environmental
0
Est Cost Other
100000
Est Cost Other Details
Custom Plidco Engineered Pipeline Repair Unit Is Being Built For Installation
Prpty
125016
Accident Psig
625
Mop Psig
1169
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
34848
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
No control room persons actions or issues caused the leak.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Field Exam Ind
Yes
Failure Type
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Fatigue Vibr Related
Yes
Failure Subtype
Pressure-Related
Mechanical Stress
Yes
Additional Lack Fusion Ind
Yes
Collected Data Ind
Yes
Cir Trn Wave Mgn Flx Lkg Ind
Yes
Circ Wave Recent Year
2019
Geometry Recent Year
2019
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2012
Hydrtst Most Rcnt Pressure
1533
Direct Asmnt Conducted
Yes, And An Investigative Dig Was Cunducted At The Point Of The Accident
Direct Asmnt At Pnt Accdnt Yr
2020
Non Destructive Exam Ind
Yes
Exm Handl Ultrasonic Rcnt Year
2020
Exm Wet Mgnt Partcl Rcnt Year
2020
Exm Handl Ultrasonic Rcnt Ind
Yes
Exm Wet Mgnt Partcl Rcnt Ind
Yes
Preparer Name
K**** N****
Preparer Title
Sr. Pipeline Compliance Specialist
Preparer Email
K******@d***********.com
Preparer Telephone
281-433-7583
Prepared Date
2020-10-13 00:00:00
Authorizer Name
J*** P*******
Authorizer Telephone
405-343-5302
Authorizer Title
Pipeline Compliance Manager
Authorizer Email
J*********@d***********.com
Narrative
On september 3rd, 2020 a small pin hole leak was discovered on southern hills pipeline after dig number sohi.S6.015952.T19.D20.N.P3 was excavated for examination. Leak site location was between mlv 39 and mlv 40 on the southern hills system. Leak site was only detectable with a 4-gas detector within one inch from the small pin hole. Excavation crew exited ditch and made notification to ops and integrity groups immediately. Dig site was caution taped off and continuously monitored for any increased vapors and none was found. A plidco 18 inch x 18 inch clamp was installed as temporary repair until a custom plidco sleeve 18 inch x 36 inch is onsite for the permanent repair. The custom clamp was ordered and will be on site mid-november and at that time will be installed per manufacture's recommendation for a permanent repair.
Report Received Date 2020-10-03 00:00:00
Iyear 2020
Report Number 20200271
Supplemental Number 34365
Report Type Supplemental Final
Operator Id 31130 PHMSA Enforcement
Name Dcp Midstream
Operator Street Address 2331 Citywest Blvd. Hq-08-S812-02
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77042
Local Datetime 2020-09-03 23:26:00
Location Latitude 32.9678439 Google Maps OpenStreetMap
Location Longitude -97.9422157 Google Maps OpenStreetMap
Commodity Released Type Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid)
Unintentional Release Bbls 4.9
Intentional Release Bbls 0
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2020-09-03 15:36:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain Smaller Than Pinhole Leak
On Site Datetime 2020-09-03 15:36:00
Nrc Rpt Datetime 2020-09-04 00:05:00
Nrc Rpt Num 1286479 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Remotely Controlled
Downstream Valve Type Ind Manual
Num Pub Evacuated 0
Pipe Fac Name Southern Hills Ngl Pipeline
Segment Name Soh-1
Onshore State Abbreviation Tx
Onshore Postal Code 76487
Onshore City Name Not Within A Municipality
Onshore County Name Parker
Designated Location Milepost/valve Station
Designated Name Mlv-39
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Exposed Due To Excavation
Depth Of Cover 48
Crossing No
Pipe Facility Type Interstate
Item Involved Weld, Including Heat-Affected Zone
Weld Subtype Other
Weld Details Erw
Installation Year 1956
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 16
Est Cost Prop Damage 20000
Est Cost Emergency 5000
Est Cost Environmental 0
Est Cost Other 100000
Est Cost Other Details Custom Plidco Engineered Pipeline Repair Unit Is Being Built For Installation
Prpty 125016
Accident Psig 625
Mop Psig 1169
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 34848
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details No control room persons actions or issues caused the leak.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Material Failure Of Pipe Or Weld
Cause Details Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Field Exam Ind Yes
Failure Type Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Fatigue Vibr Related Yes
Failure Subtype Pressure-Related
Mechanical Stress Yes
Additional Lack Fusion Ind Yes
Collected Data Ind Yes
Cir Trn Wave Mgn Flx Lkg Ind Yes
Circ Wave Recent Year 2019
Geometry Recent Year 2019
Has Hydrtst Conduc Before Ind Yes
Hydrtst Most Rcnt Year 2012
Hydrtst Most Rcnt Pressure 1533
Direct Asmnt Conducted Yes, And An Investigative Dig Was Cunducted At The Point Of The Accident
Direct Asmnt At Pnt Accdnt Yr 2020
Non Destructive Exam Ind Yes
Exm Handl Ultrasonic Rcnt Year 2020
Exm Wet Mgnt Partcl Rcnt Year 2020
Exm Handl Ultrasonic Rcnt Ind Yes
Exm Wet Mgnt Partcl Rcnt Ind Yes
Preparer Name K**** N****
Preparer Title Sr. Pipeline Compliance Specialist
Preparer Email K******@d***********.com
Preparer Telephone 281-433-7583
Prepared Date 2020-10-13 00:00:00
Authorizer Name J*** P*******
Authorizer Telephone 405-343-5302
Authorizer Title Pipeline Compliance Manager
Authorizer Email J*********@d***********.com
Narrative On september 3rd, 2020 a small pin hole leak was discovered on southern hills pipeline after dig number sohi.S6.015952.T19.D20.N.P3 was excavated for examination. Leak site location was between mlv 39 and mlv 40 on the southern hills system. Leak site was only detectable with a 4-gas detector within one inch from the small pin hole. Excavation crew exited ditch and made notification to ops and integrity groups immediately. Dig site was caution taped off and continuously monitored for any increased vapors and none was found. A plidco 18 inch x 18 inch clamp was installed as temporary repair until a custom plidco sleeve 18 inch x 36 inch is onsite for the permanent repair. The custom clamp was ordered and will be on site mid-november and at that time will be installed per manufacture's recommendation for a permanent repair.

All rights reserved. Copyright © by ClearPHMSA