HL incident on 2020-08-31 — TX
Operator
Kinder Morgan Liquid Terminals, Llc
Cause
Material Failure Of Pipe Or Weld
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$275,000
Incident datetime
2020-08-31 13:50
Report number
Location
TX
Narrative
On august 31, 2020 at 13:50, 4 gallons of gasoline were discovered near an excavation area where work was being performed inside the terminal. The source of the leak was identified as 130-3 tank line. The tank line was isolated by a valve upstream and a blind downstream and the product was cleaned up immediately. When the leak was discovered, the cost of repairs were estimated to be $17,000. After additional investigation, it was determined that the tank line would need to be replaced and on september 1, 2020 at 16:25, the cost of repair was estimated at being greater than $50,000. Metallurgical analysis results concluded that the there was weld cracking due to inadequate weld penetration. There was also a pin hole leak due to severe fit-up issues between the two sections of pipe that were joined by the girth weld and inadequate weld penetration. Plan for prevention: current welding procedures and inspection requirements should ensure this does not occur in the future.
Detailed record list
Report Received Date
2020-09-29 00:00:00
Iyear
2020
Report Number
20200263
Supplemental Number
34411
Report Type
Supplemental Final
Operator Id
26041
Name
Kinder Morgan Liquid Terminals, Llc
Operator Street Address
1001 Louisiana St, Suite 1000
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2020-08-31 13:50:00
Location Latitude
29.729889
Location Longitude
-95.201295
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
0.1
Recovered Bbls
0.1
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2020-08-31 13:50:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
The Line Was Not Active At The Time Of The Leak.
On Site Datetime
2020-08-31 13:50:00
Nrc Rpt Datetime
2020-09-01 16:37:00
Nrc Rpt Num
1286278
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Kinder Morgan Pasadena Terminal
Segment Name
Tankline Of Tank 130-3
Onshore State Abbreviation
Tx
Onshore Postal Code
77506
Onshore City Name
Pasadena
Onshore County Name
Harris
Designated Location
Milepost/valve Station
Designated Name
0
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Depth Of Cover
78
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Weld, Including Heat-Affected Zone
Pipe Diameter
36
Pipe Wall Thickness
0.375
Pipe Smys
Unknown
Pipe Specification
Unknown
Pipe Seam Type
Erw � Unknown Frequency
Pipe Manufacturer
Unknown
Pipe Coating Type
Coal Tar
Weld Subtype
Pipe Girth Weld
Installation Year
1954
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Commercially Nav Ind
Yes
Commercially Nav Yes No
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Other Pop Ind
Yes
Other Pop Yes No
Yes
Usa Drinking Ind
Yes
Usa Drinking Yes No
Yes
Usa Ecological Ind
Yes
Usa Ecological Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
10
Est Cost Prop Damage
275000
Est Cost Emergency
0
Est Cost Environmental
5000
Est Cost Other
0
Prpty
280010
Accident Psig
20
Mop Psig
285
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
< 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Controllers actions were unrelated to the leak.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Design-, Construction-, Installation-, Or Fabrication-Related
Metallurgical Ind
Yes
Failure Type
Design-, Construction-, Installation-, Or Fabrication-Related
Mechanical Stress
Yes
Additional Lack Fusion Ind
Yes
Pwf Addl Misalignment Ind
Yes
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
S******* H******
Preparer Title
Manager Compliance Code And Standards
Preparer Email
S***************@k***********.com
Preparer Telephone
713-420-6203
Prepared Date
2020-10-22 00:00:00
Authorizer Name
D******* S*******
Authorizer Telephone
713-420-6496
Authorizer Title
Director Compliance Codes And Standards
Authorizer Email
D****************@k***********.com
Narrative
On august 31, 2020 at 13:50, 4 gallons of gasoline were discovered near an excavation area where work was being performed inside the terminal. The source of the leak was identified as 130-3 tank line. The tank line was isolated by a valve upstream and a blind downstream and the product was cleaned up immediately. When the leak was discovered, the cost of repairs were estimated to be $17,000. After additional investigation, it was determined that the tank line would need to be replaced and on september 1, 2020 at 16:25, the cost of repair was estimated at being greater than $50,000. Metallurgical analysis results concluded that the there was weld cracking due to inadequate weld penetration. There was also a pin hole leak due to severe fit-up issues between the two sections of pipe that were joined by the girth weld and inadequate weld penetration. Plan for prevention: current welding procedures and inspection requirements should ensure this does not occur in the future.
| Report Received Date | 2020-09-29 00:00:00 |
|---|---|
| Iyear | 2020 |
| Report Number | 20200263 |
| Supplemental Number | 34411 |
| Report Type | Supplemental Final |
| Operator Id | 26041 PHMSA Enforcement |
| Name | Kinder Morgan Liquid Terminals, Llc |
| Operator Street Address | 1001 Louisiana St, Suite 1000 |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2020-08-31 13:50:00 |
| Location Latitude | 29.729889 Google Maps OpenStreetMap |
| Location Longitude | -95.201295 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Gasoline (Non-Ethanol) |
| Unintentional Release Bbls | 0.1 |
| Recovered Bbls | 0.1 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2020-08-31 13:50:00 |
| System Part Involved | Onshore Terminal/tank Farm Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | The Line Was Not Active At The Time Of The Leak. |
| On Site Datetime | 2020-08-31 13:50:00 |
| Nrc Rpt Datetime | 2020-09-01 16:37:00 |
| Nrc Rpt Num | 1286278 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Kinder Morgan Pasadena Terminal |
| Segment Name | Tankline Of Tank 130-3 |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 77506 |
| Onshore City Name | Pasadena |
| Onshore County Name | Harris |
| Designated Location | Milepost/valve Station |
| Designated Name | 0 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Underground |
| Incident Area Subtype | Exposed Due To Excavation |
| Depth Of Cover | 78 |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Weld, Including Heat-Affected Zone |
| Pipe Diameter | 36 |
| Pipe Wall Thickness | 0.375 |
| Pipe Smys | Unknown |
| Pipe Specification | Unknown |
| Pipe Seam Type | Erw � Unknown Frequency |
| Pipe Manufacturer | Unknown |
| Pipe Coating Type | Coal Tar |
| Weld Subtype | Pipe Girth Weld |
| Installation Year | 1954 |
| Manufactured Year | Unknown |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Pinhole |
| Wildlife Impact Ind | No |
| Soil Contamination | No |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| Commercially Nav Ind | Yes |
| Commercially Nav Yes No | Yes |
| High Pop Ind | Yes |
| High Pop Yes No | Yes |
| Other Pop Ind | Yes |
| Other Pop Yes No | Yes |
| Usa Drinking Ind | Yes |
| Usa Drinking Yes No | Yes |
| Usa Ecological Ind | Yes |
| Usa Ecological Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 10 |
| Est Cost Prop Damage | 275000 |
| Est Cost Emergency | 0 |
| Est Cost Environmental | 5000 |
| Est Cost Other | 0 |
| Prpty | 280010 |
| Accident Psig | 20 |
| Mop Psig | 285 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | < 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Controllers actions were unrelated to the leak. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Material Failure Of Pipe Or Weld |
| Cause Details | Design-, Construction-, Installation-, Or Fabrication-Related |
| Metallurgical Ind | Yes |
| Failure Type | Design-, Construction-, Installation-, Or Fabrication-Related |
| Mechanical Stress | Yes |
| Additional Lack Fusion Ind | Yes |
| Pwf Addl Misalignment Ind | Yes |
| Collected Data Ind | No |
| Has Hydrtst Conduc Before Ind | No |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | S******* H****** |
| Preparer Title | Manager Compliance Code And Standards |
| Preparer Email | S***************@k***********.com |
| Preparer Telephone | 713-420-6203 |
| Prepared Date | 2020-10-22 00:00:00 |
| Authorizer Name | D******* S******* |
| Authorizer Telephone | 713-420-6496 |
| Authorizer Title | Director Compliance Codes And Standards |
| Authorizer Email | D****************@k***********.com |
| Narrative | On august 31, 2020 at 13:50, 4 gallons of gasoline were discovered near an excavation area where work was being performed inside the terminal. The source of the leak was identified as 130-3 tank line. The tank line was isolated by a valve upstream and a blind downstream and the product was cleaned up immediately. When the leak was discovered, the cost of repairs were estimated to be $17,000. After additional investigation, it was determined that the tank line would need to be replaced and on september 1, 2020 at 16:25, the cost of repair was estimated at being greater than $50,000. Metallurgical analysis results concluded that the there was weld cracking due to inadequate weld penetration. There was also a pin hole leak due to severe fit-up issues between the two sections of pipe that were joined by the girth weld and inadequate weld penetration. Plan for prevention: current welding procedures and inspection requirements should ensure this does not occur in the future. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA