Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2020-08-14 — GA
Operator
Colonial Pipeline Co
Cause
Material Failure Of Pipe Or Weld
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$248,290
Incident datetime
2020-08-14 18:20
Report number
Location
GA
Narrative
On 8/14/2020 at 18:20, a colonial employee was notified by a local resident about a possible product release in colonial's right-of-way (row) approximately 100 feet north (I.E., downstream) of huntersville-concord road in huntersville, nc. The possible product release location was discovered by utility vehicle riders that were on a trail that crosses the pipeline row. The colonial employee lives in the area and went to inspect the location. Upon inspection, the colonial employee confirmed a product release visible at the ground surface at 18:42 near mile marker 980 that was believed to be gasoline. The colonial employee contacted the colonial control center in alpharetta, ga to provide notification of the visible release and the control center initiated shutdown of lines 1 and 2 at 18:43. The lines were blocked by closing valves upstream of the release location at colonial's charlotte delivery facility (df) and downstream of the release location at the kannapolis station. The colonial operations manager (om) was notified at 18:44, and the director of operations (do) was notified at 19:00, followed by an internal tier 2 response notification at 19:32 to mobilize internal and contractor resources to the site, and established an incident command post to support the response. At 19:43, a nrc notification was made by the control center (report number 1284598). The initial volume was reported at 75 barrels (bbls.) based on the limited information colonial had at the time. Notifications were also made to mecklenburg county, US epa, ncdeq, and PHMSA. The nrc notification was updated on 8/16/2020 at 17:40, with an estimated release volume of 1500 bbls. Based on additional information available to colonial as a result of the initial response efforts. Following confirmation of the product release source being on line 1 (product released was confirmed to be gasoline vs. Line 2 distillate products), line 2 was authorized to restart on 8/15/2020 at 0:05. The product release source was identified on 8/15/2020 at approximately 12:00. The product release source was originating from beneath a prior repair (type a sleeve) made in 2004 to address a pipeline anomaly identified through a previous integrity assessment. The product release was repaired by installing a type b pressure containing sleeve over the prior type a sleeve repair on 8/19/2020. Line 1 was restarted on 8/19/2020 at approximately 21:00 after the repair work was completed. Due to character limitations, details provided in the narrative relating to earlier supplements have been deleted, but are incorporated herein as if restated in full. Supplemented on 9/14/2020. Supplemented on 2/01/2021. Supplemented on 4/17/2021. Supplemented on 7/22/2022 to include updated: date an accident reporting criteria was met, estimated volumes of commodity released and recovered, survey station number, amount reaching groundwater and estimated property damage. The estimate of amount reaching groundwater does not include lnapl entrained below the water table as this data is not available at this time. Relating to the date an accident reporting criteria was met (I.E., part a.4.), the report requires a specific time, we have included that time as 12:00 pm. We are confident, with a reasonable degree of scientific certainty (as verified by a third-party expert), that the accident occurred july 27,2020. However, because this report requires a specific time to be reported, we are using 12:00 pm for purposes of this report only.
Detailed record list
Report Received Date
2020-09-13 00:00:00
Iyear
2020
Report Number
20200253
Supplemental Number
36889
Report Type
Supplemental Final
Operator Id
2552
Name
Colonial Pipeline Co
Operator Street Address
1000 Lake St.
Operator City Name
Alpharetta
Operator State Abbreviation
GA
Operator Postal Code
30009
Local Datetime
2020-07-27 12:00:00
Time Zone
Eastern
Daylight Savings Ind
Yes
Location Latitude
35.414106
Location Longitude
-80.806185
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
47619
Recovered Bbls
35566
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Public
Incident Identified Datetime
2020-08-14 18:20:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
On Site Datetime
2020-08-14 18:42:00
Nrc Rpt Datetime
2020-08-14 19:43:00
Nrc Rpt Num
1284598
Ignite Ind
No
Num Pub Evacuated
0
Pipe Fac Name
L01
Segment Name
Charlotte To Kannapolis
Onshore State Abbreviation
Nc
Onshore Postal Code
28078
Onshore City Name
Huntersville
Onshore County Name
Mecklenburg
Designated Location
Survey Station No.
Designated Name
2067+55
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
36
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
40
Pipe Wall Thickness
0.312
Pipe Smys
60000
Pipe Specification
Api 5l
Pipe Seam Type
Dsaw
Pipe Manufacturer
Bethlehem Steel
Pipe Coating Type
Coal Tar
Installation Year
1978
Manufactured Year
1978
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Crack
Wildlife Impact Ind
Yes
Terrestrial Impact Ind
Yes
Soil Contamination
Yes
Long Term Assessment
Yes
Remediation Ind
Yes
Groundwater Remed Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
Yes
Groundwater Contam Ind
Yes
Amount Released
892
Could Be Hca
Yes
Commodity Reached Hca
Yes
Usa Ecological Ind
Yes
Usa Ecological Yes No
Yes
Est Cost Oper Paid
14613275
Est Cost Gas Released
2570476
Est Cost Prop Damage
248290
Est Cost Emergency
2930000
Est Cost Environmental
80553266
Est Cost Other
7648918
Est Cost Other Details
Miscellaneous Costs To Support The Response.
Prpty
108564225
Accident Psig
183
Mop Psig
673
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Not contributing factors.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Environmental Cracking-Related
Field Exam Ind
Yes
Metallurgical Ind
Yes
Failure Type
Environmental Cracking-Related
Stress Subtype
Other
Stress Details
Corrosion Fatigue.
Additional Dent Ind
Yes
Additional Crack Ind
Yes
Collected Data Ind
Yes
Emat Ind
Yes
Emat Recent Year
2017
Other Recent Year
2017
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
Yes
Exm Wet Mgnt Partcl Rcnt Year
2004
Exm Other Type
Manual Measurement Of Deformation
Exm Other Rcnt Year
2004
Exm Wet Mgnt Partcl Rcnt Ind
Yes
Exm Other Rcnt Ind
Yes
Preparer Name
Q****** F******
Preparer Title
Director-Pipeline Compliance
Preparer Email
Q*******@c******.com
Preparer Telephone
6787622270
Prepared Date
2022-07-22 00:00:00
Local Contact Name
D***** L******
Local Contact Email
D*******@c******.com
Local Contact Telephone
7708193574
Authorizer Name
Q****** F******
Authorizer Telephone
6787622270
Authorizer Title
Director-Pipeline Compliance
Authorizer Email
Q*******@c******.com
Narrative
On 8/14/2020 at 18:20, a colonial employee was notified by a local resident about a possible product release in colonial's right-of-way (row) approximately 100 feet north (I.E., downstream) of huntersville-concord road in huntersville, nc. The possible product release location was discovered by utility vehicle riders that were on a trail that crosses the pipeline row. The colonial employee lives in the area and went to inspect the location. Upon inspection, the colonial employee confirmed a product release visible at the ground surface at 18:42 near mile marker 980 that was believed to be gasoline. The colonial employee contacted the colonial control center in alpharetta, ga to provide notification of the visible release and the control center initiated shutdown of lines 1 and 2 at 18:43. The lines were blocked by closing valves upstream of the release location at colonial's charlotte delivery facility (df) and downstream of the release location at the kannapolis station. The colonial operations manager (om) was notified at 18:44, and the director of operations (do) was notified at 19:00, followed by an internal tier 2 response notification at 19:32 to mobilize internal and contractor resources to the site, and established an incident command post to support the response. At 19:43, a nrc notification was made by the control center (report number 1284598). The initial volume was reported at 75 barrels (bbls.) based on the limited information colonial had at the time. Notifications were also made to mecklenburg county, US epa, ncdeq, and PHMSA. The nrc notification was updated on 8/16/2020 at 17:40, with an estimated release volume of 1500 bbls. Based on additional information available to colonial as a result of the initial response efforts. Following confirmation of the product release source being on line 1 (product released was confirmed to be gasoline vs. Line 2 distillate products), line 2 was authorized to restart on 8/15/2020 at 0:05. The product release source was identified on 8/15/2020 at approximately 12:00. The product release source was originating from beneath a prior repair (type a sleeve) made in 2004 to address a pipeline anomaly identified through a previous integrity assessment. The product release was repaired by installing a type b pressure containing sleeve over the prior type a sleeve repair on 8/19/2020. Line 1 was restarted on 8/19/2020 at approximately 21:00 after the repair work was completed. Due to character limitations, details provided in the narrative relating to earlier supplements have been deleted, but are incorporated herein as if restated in full. Supplemented on 9/14/2020. Supplemented on 2/01/2021. Supplemented on 4/17/2021. Supplemented on 7/22/2022 to include updated: date an accident reporting criteria was met, estimated volumes of commodity released and recovered, survey station number, amount reaching groundwater and estimated property damage. The estimate of amount reaching groundwater does not include lnapl entrained below the water table as this data is not available at this time. Relating to the date an accident reporting criteria was met (I.E., part a.4.), the report requires a specific time, we have included that time as 12:00 pm. We are confident, with a reasonable degree of scientific certainty (as verified by a third-party expert), that the accident occurred july 27,2020. However, because this report requires a specific time to be reported, we are using 12:00 pm for purposes of this report only.
| Report Received Date | 2020-09-13 00:00:00 |
|---|---|
| Iyear | 2020 |
| Report Number | 20200253 |
| Supplemental Number | 36889 |
| Report Type | Supplemental Final |
| Operator Id | 2552 PHMSA Enforcement |
| Name | Colonial Pipeline Co |
| Operator Street Address | 1000 Lake St. |
| Operator City Name | Alpharetta |
| Operator State Abbreviation | GA |
| Operator Postal Code | 30009 |
| Local Datetime | 2020-07-27 12:00:00 |
| Time Zone | Eastern |
| Daylight Savings Ind | Yes |
| Location Latitude | 35.414106 Google Maps OpenStreetMap |
| Location Longitude | -80.806185 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Gasoline (Non-Ethanol) |
| Unintentional Release Bbls | 47619 |
| Recovered Bbls | 35566 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Notification From Public |
| Incident Identified Datetime | 2020-08-14 18:20:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| On Site Datetime | 2020-08-14 18:42:00 |
| Nrc Rpt Datetime | 2020-08-14 19:43:00 |
| Nrc Rpt Num | 1284598 NRC Report How to search |
| Ignite Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | L01 |
| Segment Name | Charlotte To Kannapolis |
| Onshore State Abbreviation | Nc |
| Onshore Postal Code | 28078 |
| Onshore City Name | Huntersville |
| Onshore County Name | Mecklenburg |
| Designated Location | Survey Station No. |
| Designated Name | 2067+55 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 36 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 40 |
| Pipe Wall Thickness | 0.312 |
| Pipe Smys | 60000 |
| Pipe Specification | Api 5l |
| Pipe Seam Type | Dsaw |
| Pipe Manufacturer | Bethlehem Steel |
| Pipe Coating Type | Coal Tar |
| Installation Year | 1978 |
| Manufactured Year | 1978 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Crack |
| Wildlife Impact Ind | Yes |
| Terrestrial Impact Ind | Yes |
| Soil Contamination | Yes |
| Long Term Assessment | Yes |
| Remediation Ind | Yes |
| Groundwater Remed Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | Yes |
| Groundwater Contam Ind | Yes |
| Amount Released | 892 |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| Usa Ecological Ind | Yes |
| Usa Ecological Yes No | Yes |
| Est Cost Oper Paid | 14613275 |
| Est Cost Gas Released | 2570476 |
| Est Cost Prop Damage | 248290 |
| Est Cost Emergency | 2930000 |
| Est Cost Environmental | 80553266 |
| Est Cost Other | 7648918 |
| Est Cost Other Details | Miscellaneous Costs To Support The Response. |
| Prpty | 108564225 |
| Accident Psig | 183 |
| Mop Psig | 673 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Not contributing factors. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Material Failure Of Pipe Or Weld |
| Cause Details | Environmental Cracking-Related |
| Field Exam Ind | Yes |
| Metallurgical Ind | Yes |
| Failure Type | Environmental Cracking-Related |
| Stress Subtype | Other |
| Stress Details | Corrosion Fatigue. |
| Additional Dent Ind | Yes |
| Additional Crack Ind | Yes |
| Collected Data Ind | Yes |
| Emat Ind | Yes |
| Emat Recent Year | 2017 |
| Other Recent Year | 2017 |
| Has Hydrtst Conduc Before Ind | No |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | Yes |
| Exm Wet Mgnt Partcl Rcnt Year | 2004 |
| Exm Other Type | Manual Measurement Of Deformation |
| Exm Other Rcnt Year | 2004 |
| Exm Wet Mgnt Partcl Rcnt Ind | Yes |
| Exm Other Rcnt Ind | Yes |
| Preparer Name | Q****** F****** |
| Preparer Title | Director-Pipeline Compliance |
| Preparer Email | Q*******@c******.com |
| Preparer Telephone | 6787622270 |
| Prepared Date | 2022-07-22 00:00:00 |
| Local Contact Name | D***** L****** |
| Local Contact Email | D*******@c******.com |
| Local Contact Telephone | 7708193574 |
| Authorizer Name | Q****** F****** |
| Authorizer Telephone | 6787622270 |
| Authorizer Title | Director-Pipeline Compliance |
| Authorizer Email | Q*******@c******.com |
| Narrative | On 8/14/2020 at 18:20, a colonial employee was notified by a local resident about a possible product release in colonial's right-of-way (row) approximately 100 feet north (I.E., downstream) of huntersville-concord road in huntersville, nc. The possible product release location was discovered by utility vehicle riders that were on a trail that crosses the pipeline row. The colonial employee lives in the area and went to inspect the location. Upon inspection, the colonial employee confirmed a product release visible at the ground surface at 18:42 near mile marker 980 that was believed to be gasoline. The colonial employee contacted the colonial control center in alpharetta, ga to provide notification of the visible release and the control center initiated shutdown of lines 1 and 2 at 18:43. The lines were blocked by closing valves upstream of the release location at colonial's charlotte delivery facility (df) and downstream of the release location at the kannapolis station. The colonial operations manager (om) was notified at 18:44, and the director of operations (do) was notified at 19:00, followed by an internal tier 2 response notification at 19:32 to mobilize internal and contractor resources to the site, and established an incident command post to support the response. At 19:43, a nrc notification was made by the control center (report number 1284598). The initial volume was reported at 75 barrels (bbls.) based on the limited information colonial had at the time. Notifications were also made to mecklenburg county, US epa, ncdeq, and PHMSA. The nrc notification was updated on 8/16/2020 at 17:40, with an estimated release volume of 1500 bbls. Based on additional information available to colonial as a result of the initial response efforts. Following confirmation of the product release source being on line 1 (product released was confirmed to be gasoline vs. Line 2 distillate products), line 2 was authorized to restart on 8/15/2020 at 0:05. The product release source was identified on 8/15/2020 at approximately 12:00. The product release source was originating from beneath a prior repair (type a sleeve) made in 2004 to address a pipeline anomaly identified through a previous integrity assessment. The product release was repaired by installing a type b pressure containing sleeve over the prior type a sleeve repair on 8/19/2020. Line 1 was restarted on 8/19/2020 at approximately 21:00 after the repair work was completed. Due to character limitations, details provided in the narrative relating to earlier supplements have been deleted, but are incorporated herein as if restated in full. Supplemented on 9/14/2020. Supplemented on 2/01/2021. Supplemented on 4/17/2021. Supplemented on 7/22/2022 to include updated: date an accident reporting criteria was met, estimated volumes of commodity released and recovered, survey station number, amount reaching groundwater and estimated property damage. The estimate of amount reaching groundwater does not include lnapl entrained below the water table as this data is not available at this time. Relating to the date an accident reporting criteria was met (I.E., part a.4.), the report requires a specific time, we have included that time as 12:00 pm. We are confident, with a reasonable degree of scientific certainty (as verified by a third-party expert), that the accident occurred july 27,2020. However, because this report requires a specific time to be reported, we are using 12:00 pm for purposes of this report only. |